FormulaofContract
KingdomofSaudiArabia
EasternProvinceGovernorate
Construction&ProjectsAgency
GeneralAdministrationofStudiesandSupervision
FormulaoftheContract
AprojecttoimproveandorganizethestreetsandCrossingsinthecityofDammam
∙KingFahadBinAbdulazizStr.CrossingwithAbuBakerAl-SedigSt.(5#)
∙OmarBinAl-KhatabStCrossingwithKingFahadBinAbdulazizStr.(三层)
∙KingSaudSt.CrossingwithPrinceNaifBinAbdulazizSt.(42#)
Shaba'n1429H
ConditionsofContract
Contents
ContractofGeneralOperationsPage
FirstPart–TheBasicInstrumentofContract
-TheBasicInstrumentofContract
1
(1)-ThePurposeofContract
2
(2)-TheInstrumentsofcontract
2
(3)-TheDurationofContract
3
(4)-TheDurationofworksWarranty
3
(5)–TheContractValue
3
(6)–TheTermsofPayment
4
(7)-Combattheft
4
(8)–TheContractRule
4
TheSecondPart–TheGeneralProvisions
Item(1-12)
5
Item(13-22)
6
PartThree–TheGeneralProvisions
Item
(1):
IdentificationsandInterpretations
7
Item
(2):
Engineer
9
Item(3):
Cessiontoothers
10
Item(4):
Subcontract
10
Item(5):
Thecontract'sScopeofwork
10
Item(6):
TheLanguageofContract
11
Item(7:
ThePlansKeeping
11
Item(8):
EngineerCompetence
11
Item(9):
TheperformanceWarranty
12
Item(10):
TheSiteInspection
12
Item(11):
TheTenderEfficiency
13
Item(12):
Theworksperformance
13
Item(13):
TheWorkProgramme
15
Item(14):
TheContractorSupervision
16
Item(15):
TheContractorUsers
16
Item(16):
TheWorksSiteLimitation
17
Item(17):
TheCustodyandLighting
18
Item(18):
Thedamagesafflictedthepersonsandproperties.
18
Item(19):
Noticessending,Feespaymentandpenalties.
18
Item(20):
Theremainsofancientmonuments&others
19
Item(21):
Therightsofpatentoninventionanditspossession
20
Item(23):
theupnormalTrafficmovement
20
Item(24):
ToGivechancetoothercontractors
21
Item(25):
Evacuationofthesiteafterworkscompletion
21
Item(26):
TheWorkersUsage
22
Item(27):
TheWorkersLists
22
Item(28):
Thematerialsandmanufacturingassets.
23
Item(29):
Accesstothesite
23
Item(30):
TheworkInspectionbeforecoverage
23
Item(31):
RemoveoftheworksandmaterialscontradicttotheContract.
24
Item(32):
TheWorkSuspend
25
Item(33):
TheWorkCommencement
25
Item(34):
TheSitehandoverandpossession
26
Item(35):
TheDurationofWorksPerformance
27
Item(36):
Theextensionofworkscompletionduration
27
Item(37):
Preventionworkatnightandinthedaysofofficialholidays
27
Item(38):
Therateofworkprogress
27
Item(39):
TheDemurrage
28
Item(40):
TheDeductionagainsttheContractor
29
Item(41):
ThecostofSupervisionresultingfromdelay
30
Item(42):
TheMaintenancePeriod
30
Item(43):
thecommitmentofthecontractorbysearchingthereasonofthefaultorwrongordefect.
31
Item(44):
Amendments,Additionsandvoids
32
Item(45):
TheChangesrectifying
32
Item(46):
Equipments,thetemporaryworksandmaterials.
33
Item(47):
TheQuantities
34
Item(48):
MeasurementMethod
34
Item(50):
UseofExplosives
35
Item(51):
ThePayment,theprimaryandfinalhandoverandtheWarrantyDuration
36
Item(52):
ThePrimaryhandover
36
Item(53):
TheFinalhandover
36
ItemWorkwithdrawalfrotheContractor
37
Item(55):
Theeffectsofworkwithdrawal
38
Item(56):
SpecialRisks
39
Item(57):
TheSettlementoftheDuesresultfromspecialrisks
40
Item(58):
TheDisputesSettlement
40
Item(59):
Noticesnotification
40
Item(60):
TheFailureoftheWorkowner
41
Item(61):
Customs&Fees
41
Item(62):
TheImport
41
Item(63):
TheContradictbetweentheContractWork
42
Item(64):
TheDrawingsSubmission
43
Item(65):
TheDurationoftheOperation&Administration
43
Item(66):
Drilling&Diggingofexploration
42
Item(67):
TheWorksInsurance…….Etc.
43
Item(68):
TheThirdPartyInsurance
43
Item(69):
Accidentsanddamagesaffectedtheworkers
45
Item(70):
TheContractordefaultincarryingouttheinsurance
46
Item(71):
Equipments,thetemporaryworksandmaterials.…
6
Item(72):
AbsentofInclusiveagreementonmaterials…etc.
48
Item(73):
theprovisionalamountandamountonthebasesofcost.
48
Item(74):
Limitationtheagreementwithmaintenancecertificate
50
Item(75):
Pictures&Advertisements
50
Item(76):
TheFinalReceipt
50
Item(77):
TheTenderVersionSummary
51
Item(78):
Tools&Equipments
52
Item(79):
TheTemporaryWorks&Repairs
53
Item(80):
TheDateFallonvacation
54
Item(81):
TrafficSignals,Safety&PenaltyofitsViolator
54
Item(82):
TheAdditionalWork
55
Item(83):
TrainingoftheWorkownerontheworksoperation
55
Item(84):
TheWorksOperation
56
Item(85):
TheSuppliesWorks
55
Item(86):
TheComprehensiveofContractValue
57
Item(87):
TheSafetyRequirements
57
Item(88):
Possessionofthelandofprivateproperties
57
Item(89):
ThePipesPassingthroughthelandreturntotheownership:
57
Item(90):
TheevaluatedTechnicalInstitution
58
Item(91):
TheSiteOffice
58
ContractforGeneralOperations
TheFirstPart
TheBasicInstrumentofContract
ThiscontracthasmadeandenterintocontractatDammamCitythisdayCorrespondence//betweenthefollowingParties.
First:
TheMinistryofMunicipal&ruralAffairs–DammamCity,herebyrepresentby:
ThereinafterreferredtoastheEmployer.FirstParty
Second:
ThereinafterreferredtoasContractorSecondParty
Whereastheworkownerhasintendedtoperformtheproject:
No.//invitetenderforcompetitionNo.//
Whereasthecontractorhasapplyhisoffertocarryoutthatworks,perform,complete,andmaintenanceafterhisacquaintanceonthecontract'sprovisions,specifications,plans,allthedocumentsattachedherewithonthegovernmentalpurchasesinsurance,projectperformance,anditsworksissuedundertheRoyalDecreeNo.M/14/dated07/04/1397Handitsexecutiveregulations.
WhereastheoffersubmittedbytheContractorhascomecoupledwiththeworkowneracceptance,thereforethebothpartiesmentionedabovehaveagreedtothefollowing:
ItemNo.
(1):
-ThePurposeofcontract:
ThePurposeofthiscontractistocarryouttheprojectofDammamcrosswaysimprovementasfollows:
1-TheCrossofOmarBinAl-KhatabSt.withKingFahadSt.
2-TheCrossofKingSaudSt.withthePrinceNaifBinAbdulazizSt.
3-TheCrossofAbuBakerAl-SedigSt.withKingFahadBinAbdulazizSt.
Including,butnotlimitto,thefollowing:
Constructionofthetunnels/concretebridges/Streetsasphalt,tunnelslighting/concretebridges,sidewalksconstruction,streetslighting,trafficlightssignals,guidanceBoards,rainwaterdrainage,destructionworksandlevelingandpavewithinterlocks,……etc.
Thatincludethematerial,equipments,workerssubmissionandallthingsrequiredtoperform,completeandmaintenancetheworkssetforthinthecontract,aswellasthetemporary,additional,accessoriesandamendmentsthattheworkowneraskedthecontractortoperforminaccordancewithworksprovisionsanddocuments.
ItemNo.
(2):
TheInstrumentsofContract:
2/1-Thiscontractconsistsofthefollowinginstruments:
A-ThecontractBasicInstrument.
B-SpecialProvisions.
C-TheGeneralProvisions.
D-Specialspecifications.Foreachproject.
E-Plansanddrawings.Foreachprojects.
F-GeneralSpecifications.
G-BillsofQuantitiesandpricescategories.Foreachproject.
H-TheLetterofAwardingofacceptanceoftheoffer.
2/2-Theseinstrumentsformthecompleteintegralunitandeachinstrumentconsidersasanintegralpartofthiscontractwhereastheabovementionedinstrumentsinterpretedandcompleteeachother.
2/3-Ineventofcontradictbetweentherulesandinstrumentsofthecontract,theprecedinginstrumentwillbeprivilegeontheinstrumentfollowitintheordermentionedinthefirstparagraphofthisItem.
Item(3):
-TheDurationoftheContract:
3/1-TheContractorundertakestoperformandcompletionofallworksmentionedinthecontractwithinthedurationofthe(24)months(TwentyFourHijjrahmonths).
Including,theperiodofpreparationandthedurationeffectivefromthedateofsitehandovertotheContractorsubjecttothewrittenreportsignedbytheengineerandcontractor.
3/2-IftheContractordelayinperformingworksatthedurationmentionedinthepreviousparagraph,hewillsubjecttothedelayfinesetforthintheItem(39)oftheGeneralProvisionsoftheContractinadditiontothecostsandfeesofsupervisionmentionedintheItem(40).
ItemNo.(4)-TheDurationofWorkswarranty:
TheContractorwarrantytheworksofthecontractcompletelyforthedurationcommencefromtheprimaryhandoverdateandendwiththefinalhandoverwithregardstothedetailssetforthintheItem(42)oftheGeneralProvisionsofthisContract.
ItemNo.(5)–TheContractValue:
5/1-TheContracttotalvalueis(S.A.R---------------------)–Onlyamountof………………………………………...)againsthisperformanceinaccordancewithprovisions,specifications,plans,billofquantitiesandotherinstrumentsoftheContract.
5/2-ThistotalvaluehassubjecttotheincreaseanddecreasefollowingthechangeofpracticalworksquantitiestheContractorperformsinaccordancewiththeContract,followingtotheadditional,complementary,andamendmentsworkshecarriesoutdependontheworkownerrequestinthelimitsscopesetforthintheContractprovisions.
ItemNo.(6)-ThePayment: