模具专业英语注塑模.docx
- 文档编号:5679935
- 上传时间:2022-12-31
- 格式:DOCX
- 页数:14
- 大小:28.02KB
模具专业英语注塑模.docx
《模具专业英语注塑模.docx》由会员分享,可在线阅读,更多相关《模具专业英语注塑模.docx(14页珍藏版)》请在冰豆网上搜索。
模具专业英语注塑模
InjectionMoldTechnicalTerms
(一)模具专业基本用词ProfessionalTerms
1.塑料—plastic,resin
2.样件 —sample
3.钢料—steel
4.注塑机— injectionmachine,press
5.产品 —part,product,moulding
6.模具—mold,mould,tool
A 简易模(样板模)—prototypemold B量产用模具— productionmold
7.三维造型(数模)—3Dmodel,3D data
8.二维产品图—2Dpartdrawing
9.设计—design
10.制造— manufacture, build up,construction
11.检验—check,inspection
12.测量 —measure, inspection
13.修改—change,modify,correction
14.工程更改 —engineerchange
15.质量 — quality
16.数量—quantity
17.基准 — datum,reference
(二)如何解析2D产品图?
How toread2Dpartdrawing?
一.产品几何Geometry
1.点 —point
2.线(边) — line,edge
3.面 face
A侧面—side B 表面—surface C外观面 —appearancesurface
4.壁厚—wallthickness,stockthickness
5.加强筋(骨位)—rib
6.孔—hole
7.细长的槽—slot
8.柱位—boss
9.角—corner
A圆角 — fillet B倒角—chamfer C 尖角—sharpcorner
10.斜度—angle,taper
11.凹槽—recess,groove
二.分模信息Splitting
1.分型线—partingline(P/L),splitting line
2.主分模方向—maindirection,line ofdraw
3.浇口设定— gating
三.产品标识PartIdentification
1.产品名称—partname(P/N)
2.产品编号+版本号—partnumber+revision(Rev.)
3.型腔号—cavity number
4.材料标记—materialsymbol
5.模具编号—mold number(no.)
6.日期印—datinginsert,datecode
7.循环印—cyclingcode
8.公司标志 — companylogo
四.技术要求Specification(Special Requirement)
1.项目启动表 Kick-offsheet
1)项目名称—programname,projectname
2)产品名称— partname,productname,partdescription
3)产品编号—part number(P/N)
4)客户模号—customer moldno.
5)项目启动日期— kick off date,startdate
6)项目完成日期— due date,leadtime
7)内模件用钢— toolsteel
8)型腔数量—numberofcavities
9)数据文件编号—data.
10)注塑材料—resin, plastic,rawmaterial
11)收缩率— shrink,shrinkage,shrinkfactor
12)注塑机吨位—moldingmachinesize,injectionmachinesize
13)成型周期— cycletime
14)型腔光洁度—cavitypolish
15)型芯光洁度— core polish
16)皮纹(晒纹)—texture,grain
17)拔模斜度—draft angle, removaltaper
18)注塑件颜色及光泽 —moldedcolor& gloss
19)模具加工地—manufacturingfacility
20)热流道供应商—manifold manufacturer, manifoldsupplier
21)浇口位置 —gatelocation / position
22)浇口类型—gatetype
23)产品标识—stampinformation,partidentification
24)特殊要求 —specialinstructions
25)安全模数—safesteel
2.产品质量及外观要求Part Quality&AppearanceRequirement
1)尺寸及公差Dimension&Tolerance
1重要尺寸— criticaldimension,importantdim., keydim.
2理论尺寸—nominaldimension
3 实际尺寸— actualdimension
4 公差—tolerance
5公差带—tolerancerange
6尺寸超差 —dimensiondeviation
7接受(合格) —accept, OK
8拒绝(不合格)—reject,refuse,obsolete,NG
9让步接受—concession,specialadmit
10 返工—re-work
2)产品缺陷(常见的)Defects (normal)
1缩水 —sinkmark,shrinkage
2飞边,毛边—flash,burr
3段差—mismatchdiscrepancy
4银丝纹,蛇纹 —snakemarks, streak
5弯曲,变形—warpage,distortion
6打不饱(缺料) —short shot
7熔接线—weldline
8多胶—unwantedplastic
9拉伤—damage
3.产品外观Part Appearance
1产品颜色—partcolor
2产品光泽— gloss
3皮纹粒度 — grain
4.常用词汇、词组及短语NormalWord,ShortSentence
1)单边— perside
2)双边—bothsides
3)加入,添加—add,incorporate
4)去除,取消 — remove, cancel
5)满足…的要求,符合,与…要求一致 —according to,conformto, satisfy,meet
6)要求,需要 —require,need,demand
7)确认 —beapproved,agreedby…
8)允许—permit,allow
9)在…范围之内 —within
10)不可以,不允许,禁止 —freefrom,prevent, avoid
11)…,除非有另指—…unlessotherwisespecified
12)…或少于—…orless
13)自动化运作— automaticoperation
14)未注尺寸(详细形状)见三维造型
Nondimensionedcontour(detailed shape) see3Dmodel.
15)分型线上的飞边(披缝)或段差应小于…
Burrs ordiscrepancyontheP/Lshall be… orless.
五.标题栏TitleBlock
1.产品名称— partname
2.图纸编号+版本号(索引号)—drawingno.+level(index)
3.一般公差— general tolerance
(三) 如何阅读制模标准?
Howtoreadtoolingstandard?
一.模具结构术语Mold ConstructionTerms
A.模架MoldBase
1.模架量化特征MeasurementFeature
①长 X 宽X高—Length XWidthXHeight
②模具高度尺寸(模厚)—stackheightof mould
③ 模具重量— totalweight ofmould,mouldthickness
2.定模底板 —frontplate,topclampingplate, clampplate,clampingplate
3.定模板— cavity plate,fixedmould plate,A–plate
4.动模板— coreplate,movingmouldplate, B –plate
5.浮动板—floating plate
6.支撑板—supportplate, backingplate
7.间隔板,方铁—supportblocks, rails,risers,spacerblock
8.顶杆固定板—retainingplate,ejectorretainingplate
9.顶板 — ejectorplate,bottom clampingplate
10.动模底板—backplate
11.导柱—guide pillar,leaderpin, guidepin
12.导套—guidebush,leaderpinbush
13.复位杆—returnpin, push-backpin
14.弹簧— spring
15.撑头—support pillar
16.顶针板导柱、导套—ejectionguidepin/bush
17.垃圾钉 —stoppin,stopbutton
18.模脚—standing-offpillars
19.标牌 — plaquescutcheon
B.成型零部件 mouldingcomponents
20.型芯—coreinsert
21.型腔—cavityinsert
22.镶针 —corepin
23.镶块—sub-insert,split
24.滑块—slide,slidingsplit
25.斜顶—lifter,angled-lift split
A 斜顶头—lifterhead B 斜顶杆—lifterrod, liftershaft
C斜顶连接块 —— liftercoupling D斜顶导向块——lifterguide
E 斜顶导滑块——lifter Gib
26.成型顶杆—mouldingfacepin, form pin
C.浇注系统 FeedSystem
1.塑料Plastic
a.主流道—sprue
b.分流道runner
①主分流道—mainrunner ②二级分流道— branch runner
分流道断面形状cross-sectionalshapeofrunner
① 圆形— fullround
②半圆形— semicircular
③梯形 —trapezoidal
c.浇口gate
常用浇口形式normalgate type:
①边缘浇口(J型浇口)— edge gate,J–gate
②侧浇口— side gate
③潜伏式浇口—sub-gate, cashew gate,subsurfacegate, submarine gate
潜顶针— subgatetopin
④潜伏式二次浇口(隧道式浇口)—tunnelgateonto feederpost
⑤点浇口—pin gate
⑥直接浇口(主流道型浇口)—spruegate,directgate
⑦护耳式浇口 —tabgate
d.模腔—impression
e.冷料井 —coldslugwell
f.热流道—hotrunner
2.模具零件moldcomponents
a.定位圈—locating ring, location ring,registerring
b.浇口套— sprue bush
c.挡圈—stop ring
d.浇口镶块—gate insert
e.热流道板— manifold
f.热嘴—hotdrop
D.分型面及其锁紧、排气PartingSurface,inter-locking&venting
1.分型线—parting line(P/L)
2.镶拼线—bodyline,jointline
3.平/不平的分型面—flat/non–flat partingsurface
4.封胶面— shutoffsurfaces,seal-offsurfaces
5.擦穿位 — shut off
6.碰穿位—kiss-off
7.管位 —partinglinelock
8.分型面的释放(避空)—reliefofpartingsurface
9.分型面的平衡—balancingof partingsurface
10.锁紧角度—locking angle
11.锁紧力—clampingforce
12.锁模块 —safety strap
13.精定位— Interlock,die lock
14.困气—airtrap
15.排气槽—vent,ventslot
16.撬模坑---pryslot
17.计数器---shotcounter/cyclecounter
E.滑块机构Slide
1.驱动Actuation
① 斜导柱— angle pin, horn pin,campin
②弹簧—spring
③油缸—hydrauliccylinder
2.制动 Detention
①滑块固定器—slide retainer
②弹簧制动器—spring-loaded detention(plunger)
③ 挡钉、挡板—stoppin,stopplate,slidestop
3.导轨— gib, guidestrip,centerguide
4.锁紧块(楔紧块)—heel block,lockingheel,wedge block, chaseblock,slidedriver
5.耐磨片—wearplate,wearstrip
6.压板 —retainer,gib
7.螺钉—screw
8.定位销—dowelpin
9.行位扣— slidelock/slideretainer
F.斜顶机构 Lifter
1.斜顶头—lifterhead
2.斜顶杆—lifterrod,liftershaft
3.斜顶固定块—lifterrodretainer
4.斜顶导向块—lifterguide
5.开口销— splitpin
6.固定板(压板)—retainer plate
7.耐磨片—wear plate
8.铜导套 —bronzebushing
9.导套固定板—bushingretainer
10.衬套—spacer
11.导轨 —L–gib
12.导轨---T-Gib
13.滑动块 — slide
14.连接块—U-Coupling
G.顶出系统Ejection System
1.基本词汇 BasicWord
1顶出行程— ejection stroke
2模具开档—daylight
3粘模 —stickon
4产品脱模—partispushofffrom,clear partofmould, separationofpart
2.顶板机构Ejectorplate assembly
1顶板—ejector plate
2顶板固定板— retainingplate
3推板— stripperplate
4推板导柱 —ejector guidepin
5推板导套—ejectorguidebush
6撑头— support pillar
7限位块—stopblock,strokeblock
3.复位机构ReturnSystem
1复位杆(回程杆)— returnpin,push–backpin
2垃圾钉—stoppin,stopbutton
3压簧— compressedspring
4碟簧— astackof“Belleville” washers
5早复位机构—earlyreturnsystem
6强制复位机构—positive return system
4.顶出方法 EjectionTechniques
1)顶杆顶出—pinejection
2)顶管顶出 —sleeveejection
3)顶块顶出 —barejection
4)扁顶顶出 —bladeejection
5)顶板顶出 —stripperejection
6)油缸顶出—hydraulic ejection
7)气顶—airejection
8)阀门顶出—valveejection
5.顶出元件EjectionElements
1)拉料杆 —sprue puller, suckerpin
2)顶杆—ejectorpin
3)阶梯式顶杆— steppedejectorpin
4)顶管—ejectionsleeve,sleeve
5)扁顶—ejector blade,slabbedoff ejectorpin
6)顶块—stripper bar
7)顶环—stripperring
8)推板 —stripperplate
9)加速顶—acceleratedejection
10)直顶----straightlifter
6.顶出辅助机构 Supplementaryoperatingsystem
1)弹簧柱塞器—spring –loadedplunger
2)弹珠定位器— ballcatchsystem
3)插销式锁扣—Latch–lock
4)尼龙拉杆装置—frictionpullerdevice
7.电器元件 ElectricComponents
1)压力传感器—pressuretransducer
2)限位开关— limitswitch
F.冷却系统Cooling System
1.基本词汇 BasicWord
1)温差—temperature variation
2)水孔(水道) —waterlines, water-ways,flow-way,channel
3)水路—coolingcircuit
4)水路示意图—waterschematic, schematic circuit
5)冷却液 — coolant,coolantfluid
6)内连接—interconnect
7)外连接 —externalconnection
8)出口、入口 — outlet、inlet
9)漏水—waterleakage
2.水路分布Circuits
1)阶梯式水路—steppedsystem
2)分隔板水路 —baffledhole system
3)斜孔式水路— angledholesystem
3.水路元件Components
1)闷头(螺塞、止水栓) —(threadless)brasspressureplug:
femaleplug& male
2)隔水片—baffle
3)密封圈 —O–ring
4)快插水路接头—quickdisconnectfitting,quick connectionadaptor
5)弯头— elbow
6)偶合器(连接器、接头)—adaptor (includingaplug&a socket)
7)橡皮管 — rubberhose
8)分水板,集水块— watermanifold
G.螺纹、螺纹孔& 螺钉 Thread,threadhole&screw
1.螺纹—thread
2.管螺纹 —pipethread
3.螺纹孔—screwhole,tapped hole
4.起吊孔—handlinghole,jackscrewhole,eyebolthole
5.螺钉—screw
6.内六角螺钉—socketheaded capscrew (s.h.c.s.)
7.沉头螺钉 —flatheadedcapscrew(f.h.c.s)
8.螺栓—bolt
9.螺母—nut
10.锁紧螺母 — locknut
11.螺纹标准ThreadStandard
①公制标准—Metric
②英制标准—Imperial
③英制管螺纹标准 —BritishStandardPipethread(BSP)
④美制管螺纹标准—NPT
⑤ 美制粗螺纹标准—UnitedCoarsethread(UNC)
⑥美制细螺纹标准—United Finethread(UNF)
H.润滑Lubrication
1.润滑槽 — greasegroove
2.加油管—greaseline
3.油杯—lubricationfitting
I.测量仪器 Measuring Instruments
1.游标卡尺—verniercaliper
2.千分尺—micrometer
3.高度规—height gauge
4.刻度规—dialgauge
5.三坐标测量仪(三次元)—CoordinateMeas
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 模具 专业 英语 注塑