BAL71000007EDrumbodyspiraldivideddesignongearu
Reeltypes
ES25..,ES31..,ES20../D>6500mmongearunitK20.
CONTENTS
Page
1Generalinformation2
2Drumbodycomponents2
3Assemblyofthereelbody4
3.1Requirements4
3.2Assemblyofthereelwheel6
3.3Assemblyofthereelwheeltothegearunit13
3.4Firstalignmentofthereel(withoutcable)14
3.5Ramp16
3.6Angleforcableinsertion18
4Placingthecableonthedrumandconnectingup18
4.1Forthepreparatoryworkpriortoplacingonthedrum18
4.2Preparationofthecableendandleadingtotheslipringbody19
4.3Placingcableondrum19
4.4Reelingthecable20
4.5Connectingupthecable20
5Checkthedrumwidthandadjustifrequired20
1Generalinformation
Thefunctionofthereelbodyistotakeupareelingcable(highvoltage,lowvoltageorcontrolcable).
Asastandardthereelbodyhasthecapacitytotakeupthewound-uplengthrequiredforthisoperationplus2windingsfortensionrelief.
Note:
Allbelownumbersinbrackets()refertothecorrespondingpositionsonfigure1tofigure3.
2Reelbodycomponents
Thereelbodyisdelivereddismountedandiscomposedof:
-9resp.10premountedreelsegments
-1ramp
-2reelplates
-1angleforcableguidance
-1boxwithscrews,nuts,washersandlocknuts
3Assemblyofthereelbody
3.1Requirements
Theassemblyofthereelbody
-requiresanevensurface;
-requiresapprox.20elementsofanequalheight
(suggestion:
woodenblocksapprox.300mmx100mmx750mm);
-requires2elementswithaheightdimensionreducedby24mmforthesupport(suggestion:
276mmx100mmx500mm);
-requiresatleast2vises(spacing>350mm);
Fortheassemblyofthereelbodytothegearunit,thegearunithastobeplacedatanappropriateheighttoguaranteeaminimumgroundclearanceofhalfareelbodyouterdiameter(D/2).
Thereelsegmentsaresupplieddependingonthenominalcablediametersprovidedbythecustomer.
Thereelwidth„b“tobeadjusted,howeverdependsontheactualdimension„d“(cablediametertobemeasuredbythecustomer).Choosethereelwidthassmallaspossiblebyleavingout/removingindividualwashers(16)à3mm(perspoke).
Ifthisisrequireditshouldbedonepriortomountingthesegments.Thentightenthenutswith350Nm!
Example:
Measuredcablediameter:
48.4mm
Suppliedreelwidth:
52.0mm
Reelwidthtobeadjusted:
49.0mm
(removerespectivelyleaveoutonespacerateachjoint)
3.2Assemblyofthereelwheel
Donotyetremovethewoodenspacers(conditionupondelivery).
Putthetworeelplateshorizontallyontothetwolowwoodenblocks.Sincetheplatesarenotsymmetrical,makesurethatthecorrectsidepointstothetop.(outerholecircledisplacedtotheleft).
links/left
Displaywoodenblocksandjoinreelsegments.
Alwaysjoin2reelsegmentsofthesamenumber(atthefacesurface).
2
2
Ifseveralidenticalreelsaresupplied,thesegmentsattheinsideofthejointareadditionallymarkedwiththereelnumber.
I2
I2
Example:
reelnumberjoint
Screwreelsegmentsloosewiththefollowingparts:
-countersunkscrewsM12x80DIN7991
-washers13DIN9021
-hexagonheadscrewsM12DIN934
-locknutsM12DIN7967
Thelastreelsegmentscanbeidentifiedbythe2outsidecouplingstripsandthehighestandlowestnumberatthefacesurfaces(e.g.1and10).
Screwplatesloose(withhexagonheadscrewsM20DIN931).
Attention!
Nutsshouldbefixedwithagapof1upto2mmtothereelplate.
Removewoodenspacers
Installassemblydistanceplatesatthefirstjointbetween2reelsegments.
Applyvisesandscrewtight.
Screwfittings(countersunkscrewsandhexagonheadscrews)tight.
Thenremovevisesanddistanceplatesandmakesurethereisnomisalignmentatthejoint(attheinside).
Attention!
Anymisalignmentatthejointmustbeprevented.
Ifrequiredrepeatthisprocessuntilthereisnomoremisalignment(<0.5mm).
Connectallreelsegmentstight.
Thentightenthescrewingsatthereelplate(checkwithlocknutsDIN7967).
3.3Assemblyofthereelwheeltothegearunit
Liftreelwheelwithcrane,placeitverticallyandbringittothegearunit.
øaøcøeøf
Øc
Pushthereeloverthereelflangeintothedirectionofthemountingflange(4).Thenboltthereelplate(5)andthemountingflange(4)ontheholecirclediameters“a”and“c”force-lockingbythe30hexagonheadscrews(6)withthecorrespondingwashers(7)andhexagonheadnuts(8).Checkthejointswiththelocknuts(9).(figure1.
3.4Firstalignmentofthereel(withoutcable)
1/6/11/14a/22hexagoncapscrewDIN933
2/7/24washerDIN125
3/8/20/21/23hexagonalnutDIN985
4fasteningplate
5reelpanel
6hexagonheadscrewDIN993
9lockingnutDIN7967
10firstreelplate
12(adjusting)threadbolt
13hexagonalnutDIN934or439
14threadbolt
15reelsheath
16SpacerDIN125orsleeve
17secondreelplate
18ramp
19/20/21(adjusting-)hexagonalnut
25cablelead-through(shortspokeinthesecondreelplate)
Figure1
Alignbothreelplates(10/17)inparallelrespectivelytaperingtotheoutsidebyadjustingthehexagonheadnut(19/20).
wxyz
Dimension“b”atthereelsheathiscalculatedfromthenumberofdistancewashers/sleevesandshouldbeassmallaspossible(withreferencetotherealcablediameter).
Dimension“b”attheouterdiameter(withemptydrum)shouldbeadjustedassmallaspossible,sothatitisonlyslightlybiggerthanthemeasuredcablediameter.
Iftheminimumadjustabledimension“b”atthereelsheathisbiggerthanthecablediameter,thereelouterdiameterhastobeadjustedtoasmallervalue.
Example:
Measuredcablediameter:
56,5mm
Adjustedreelwidthatthereelsheath:
59,0mm
Reelwidthtobeadjustedattheouterdiameter:
57,0mm
(Adjustedaccordingtoabovesketch„z“)
Theadjustmenthastobemadeseveraltimesallaroundeachpairofspokes.Makesurethatthesamevaluesareadjustedatallpairsofspokes.
Measurementsaremadeatthereelsheath“d”(innerdiameterofthereel/hole-circlediameter“f”)andattheouterdiameter“D”ofthereel.
-Tighteningthehexagonheadnut(20)tohole-circlediameter“e”increasesdimension“b”.
-Tighteningthehexagonheadnut(19)tohole-circlediameter„e“reducesdimension„b“.
Whenthereelisaligned,tightenthehexagonheadnut(21)onthehole-circlediameter“f”with350Nm(M20)andcheckwiththelocknut(9).
Tightenthehexagonheadnuts(19/20)with350Nm(M20)onthehole-circlediameter„e“.Ithastobeobservedthatthealignmentpositionisnotchanged.
Checkoncemoretheparallelalignmentrespectivelytaperingtotheoutsideofdimension“b”allaroundandiftheresultispositivefitthelocknut(9)andcheckit.
Ifduringtighteningthehexagonheadnut(19/20)theparallelalignmentrespectivelytaperingshouldbeshiftedtotheoutside,proceedoncemoreaccordingtoitem3.4.
3.5Ramp
Fixtheramp(18)tothereelsheath(15)ofthereelsegmentbymeansofthecrossbeam(cableentry)insuchawaythatthefirstwindinglayerpassesovertothesecondwindinglayerwithoutanybreaks.Moreoverthiswillpreventthecablefrombeingcrushedintheareaofthecablelead-through.Thebreakaswellasthecrushingmustbeavoidedoncableswithfiberoptics.
Thereelsheathcontainsadrill-holefortherampassemblyfornormalunwindingrespectivelyabnormalunwinding.Dependingonthedirectionofunwindingtherampmustbemountedtotheotherdrill-holeifrequired.
Figure2
Rampfor
unwinding„abnormal“
Rampfor
unwinding„normal“
Figure3
Note:
Preventthecablefrombeingcrushedduringcableentry(25).Theminimumbendingradiusmustbeconsidered.Steps4.1to4.3havetobecarriedoutbyaspecialistfirst.
3.6Angleforcableguidance
Mountangleforcableguidanceattheholecirclediameter„e“(displacedbyapprox.120°tothecableentry).
4Placingandconnectingthecable
Placingandconnectingcablesmustbedonebyspecialists.
4.1Preparatoryworkforplacingcables(seeoperatinginstructions)
"Reelcable",item2
4.2Preparationofthecableendtotheslipringbody
Toestablishthelengthtostriptheinsulationofthecableitisrequiredtoopenthecoveroftheslipringbodyhousing.ThedistanceismeasuredfromthestuffingboxscrewingTL(reelcableentry)tothefinalconnectionpointoftheslipringbody.
Striptheinsulationofthecable,shortentheindividualconductorsifnecessary,consideringthedistancebetweentheringsandprovidetheendswiththecorrespondingringorpincablelug.
Note:
Highvoltagecablesaregenerallyequippedwithacablesealingend,sothattheabovedescribeddoesnotapply.
Ifacablesealingendhasnotyetbeeninstalledthismustbedonebyqualifiedpersonnel.
4.3Placingthecablesonthereel
AdjusttherubberringinthestuffingboxscrewingTLtotheactualcableouterdimension.
Thecableend,comingfromthedispatchreelordispatchring,ispushedontothereelsheathbetweenthereelshields(figure2and3).
Whenthecableisledthroughthecableendprojectsfromthereelwheel.Fromthereleadthecabletotheguideangleandscrewitwiththecablecollar.Thenleadthecableendthroughthestuffingboxscrewing(break-outrubberring)andleadthehollowshaftofthegearunittothefarthestconnectionpointoftheslipringbody.Ifthereisarampthecablemustbeledoutofthewindingareabeforethisramp.
PriortotighteningthestuffingboxscrewingTlitisrequiredtocheckonceagainthatthenon-strippedpartofthecableisinsi
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BAL71000007E Drum body spiral divided design on gear
链接地址:https://www.bdocx.com/doc/4660495.html