Quality requirements for construction projects建设项目质量要求英文版.docx
《Quality requirements for construction projects建设项目质量要求英文版.docx》由会员分享,可在线阅读,更多相关《Quality requirements for construction projects建设项目质量要求英文版.docx(72页珍藏版)》请在冰豆网上搜索。
Qualityrequirementsforconstructionprojects建设项目质量要求英文版
GENERALREQUIREMENTSDIVISION1-PAGE1
SECTION01000GENERAL
1.01CONDITIONSANDREQUIREMENTS
Division1-GeneralRequirementsshallgovernworkunderallDivisionsoftheSpecifications.
1.02SPECIFICATIONLANGUAGEEXPLANATION
Specificationsareofabbreviated,simplifiedorstreamlinedtypeandincludeincompletesentences.Omissionsofwordsorphrasessuchas"theContractorshall,""inconformitytherewith,""shallbe,""asnotedontheDrawings,""a,""the"areintentional.Supplyomittedwordsorphrasesbyinferenceinsamemannerastheyarewhen"NOTE"occursonDrawings.Supplywords"shallbe"or"shall"byinferencewhencolonisusedwithinsentencesorphrases.Supplywords"ontheDrawings"byinferencewhen"asindicated"isusedwithsentencesorphrases.
Wherereferenceismadetospecifications,societies,institutes,orassociationsormanufacturer'sdirections,theyare,exceptasmaybeinconsistentherewith,madepartofspecifications,tosameextentasifwrittenoutinfullherein.Uselatestedition,attimeofbidding,ifadateisnotgiven.
1.03SUBMITTALS
A.PreparedataforusebytheUniversityofColorado,FacilitiesManagementpersonnel.
B.Format:
1.SubmitelectronicallyinPortableDocumentFormat(PDF)formatasonedocument,OCR(OpticalCharacterRecognition)searchable,bookmarkedaccordingtotheConstructionSpecificationsInstitute(CSI)standards.
2.Titleshallbe"SPECIFICATIONS",andshallinclude:
a.Nameofprojectandsubmittalstageanddateofsubmittal(month,day,andyear).
b.UniversityofColoradoProjectnumber(Includeoncoverandinheaderorfooterofeachpage)
1.04CONTENTOFMANUAL
A.Anelectronically-writtentableofcontentsshallbeprovidedforeachvolume,arrangedaccordingtoCSIstandards.
Includethefollowing:
1.Nameofresponsibleinstallingprincipalcontractor,address,andtelephonenumber.
1.05ABBREVIATIONS
ReferencesinContractDocumentstotradeassociations,technicalsocieties,recognizedauthoritiesandotherinstitutionsincludefollowingorganizations,whicharesometimesreferredtoonlybycorrespondingabbreviations:
AAAluminumAssociation
AAMAArchitecturalAluminumManufacturer'sAssociation
ACIAmericanConcreteInstitute
GENERALREQUIREMENTSDIVISION1-PAGE2
SECTION01000GENERAL
AIMAAcousticalandInsulatingMaterialsAssociation(successortoAMAandIBI)
AISCAmericanInstituteofSteelConstruction
AISIAmericanIronandSteelInstitute
AITCAmericanInstituteofTimberConstruction
AMAAcousticalMaterialsAssociation
ANSIAmericanNationalStandardsInstitute(successortoUSASIandASA)
APAAmericanPlywoodAssociation
ASHRAEAmericanSocietyofHeating,RefrigeratingandAirConditioningEngineers
ASTMAmericanSocietyforTestingMaterials
AWIArchitecturalWoodworkInstitute
AWPAAmericanWoodPreserversAssociation
AWSAmericanWeldingSociety
CDACopperDevelopmentAssociations,Inc.
CM/GCConstructionManager/GeneralContractor
CRACaliforniaRedwoodAssociation
CRSIConcreteReinforcingSteelInstitute
CSCommercialStandard(U.S.DepartmentofCommerce)
DFPADouglasFirPlywoodAssociation
EPAEnvironmentalProtectionAgency
FGMAFlatGlassMarketingAssociation
FIAFactoryInsuranceAssociation
FMFactoryMutualEngineeringDivision
FSFederalSpecification
MIAMarbleInstituteofAmerica
MILMilitarySpecification
MILMAMetalLathManufacturer'sAssociation
NAAMMTheNationalAssociationofArchitecturalMetalManufacturers
NBFUNationalBoardofFireUnderwriters
NBSNationalBureauofStandards
NCMANationalConcreteMasonryAssociation
NECNationalElectricCode(ofNBFU)
NEMANationalElectricalManufacturers'Association
NFPANationalFireProtectionAssociation
NIOSHNationalInstituteofOccupationalSafetyandHealth
NMWIANationalMineralWoolInsulationAssociation
NPVLMANationalPaint,VarnishandLacquerManufacturers'Association
NTMATheNationalTerrazzoandMosaicAssociation
OSHAOccupationalSafetyandHealthAdministration
PCAPortlandCementAssociation
PCIPrestressedConcreteInstitute
PEIPorcelainEnamelInstitute
PSProductStandard(U.S.DepartmentofCommerce)
SCPIStructuralClayProductsInstitute
SDISteelDeckInstitute
SJISteelJoistInstitute
SMACNASheetMetalandAirConditioningContractor'sNationalAssociation
SPASouthernPineAssociation
SPITheSocietyofPlasticIndustry,Inc.
SPRSimplifiedPracticeRecommendation(U.S.DepartmentofCommerce)
SSPCSteelStructuresPaintingCouncil
SWISteelWindowInstitute
GENERALREQUIREMENTSDIVISION1-PAGE3
SECTION01000GENERAL
TCATileCouncilofAmerica
ULUnderwriters'Laboratories,Inc.
WCLAWestCoatLumbermen'sAssociation
WRIWireReinforcementInstitute
WWPAWesternWoodProductsAssociation
1.04LAYINGOUTWORK
TheContractorwillfurnishreferencebenchmarkandmaintainbenchmarkandallothergrades,lines,andlevelsanddimensionsasindicatedintheContractDocuments.ReportanyerrorsorinconsistenciesinabovetoOwnerbeforecommencingwork.
Exceptasdelegatedbysubcontractornormaltradepractice,theContractorwillberesponsibleforalllines,elevations,andmeasurementsofworkindicated.
1.05EXAMINATIONOFSITE
FailuretovisitthesitewillinnowayrelieveanyContractorfromthenecessityoffurnishingmaterialsorperformingworkthatmayberequiredtocompleteworkinaccordancewiththeContractDocumentswithoutadditionalcosttoOwner.
ENDOFSECTION
GENERALREQUIREMENTSDIVISION1-PAGE1
SECTION01010SUMMARYOFWORK
PART1-GENERAL
1.01SCHEDULEOFDRAWINGS,SPECIFICATIONSANDADDENDA
ThefollowingDrawings,ProjectManual,andAddendafromtheContractDocuments.
A.Set(s)ofDrawings&projectmanualsdated_________________..Drawinglistisasfollows:
SheetNo.Titled
SheetIndex:
B.ProjectManualtitles:
____________________________dated__________.
C.Addenda:
AllAddendaissuedpriortobidding.
1.02WORKCOVEREDBYCONTRACTDOCUMENTS
A.Workcovered:
Workunderthiscontractincludesallmaterials,equipmentandlabornecessarytocompletetheworkindicatedonthedrawings,describedinspecifications,addendaorreasonablyinferred.
1.03CONTRACTORS
AllworkwillbeexecutedunderoneprimeconstructioncontractbetweentheOwnerandtheContractor.
Exceptasindicatedotherwise,allworkunderthiscontractwillbeunderthedirectionoftheprimecontractor.
ProjectManager:
Listalso,workunderseparatecontract,workbyOwner,worktobeprovidedlaterand/oritemssuppliedbyOwner,installedbyContractor,etc.here.
1.04JOBCONDITIONS
ProjectManager:
Modifytofitspecificjob.
A.Areasofthebuildingimmediatelyadjacenttoareasunderconstructionwillbeoccupiedbythepublicduringtheworkofthisproject.ConducttheworkofthisprojectinamannerthatwillminimizedisruptionoftheOwner'soccupancyofadjacentareas.
Chooseone:
Lastsentenceaboveorsentencebelow.
LimitconstructionoperationstothosemethodsandprocedureswhichwillnotadverselyandundulyaffecttheOwner'soccupiedspacesinclusiveofparkingfacilities.
GENERALREQUIREMENTSDIVISION1-PAGE2
SECTION01010SUMMARYOFWORK
B.Donotinterruptbuildingaccessanduse,exceptaspermittedbytheOwner.
Provideeight(8)workdaysnoticetotheOwnerofconstructionactivitieswhichwillseverelyimpacttheoccupancyanduseofadjacentareas.
C.Providetemporarybarriersand/orpartitionsasrequiredtoprotecttheoccupantsofthebuildingandthegeneralpublicfrominjuryduetotheworkofthisproject;and/ortoprotectadjacentareasofthebuildingfromthespreadofdustanddirtcausedbytheworkorthisproject.
RemovetemporarybarriersandpartitionsuponcompletionoftheProject.
1.Temporarypartitionsshallbeconstructedof1/2"plywoodontheconstructionfacenominal2"X4"woodstudsand1/2"gypsumwallboardonthepublicoccupiedface.
D.Donotinterruptpower,lighting,plumbing,telephoneandHVACservicestooccupiedareaswithoutOwner'sapproval.Suchinterruptionsmustbescheduledatleasteight(8)workdaysinadvanceandhaveOwner'sapproval.
ADDspecialrequirementsofsequencingofthework,specialrestrictionsonhoursofoperations,limitationsondaysofwork,etc.
1.05PROTECTIONOFWORKANDADJACENTPROPERTY
A.Buildingsandpropertyadjacenttoworkincludedinthisprojectmaybesubjecttodamageduetoconstructionoperations.
PriortothestartoftheworkincludedinthisContractengagetheservicesofaphotographertorecordtheexistingconditionofadjacentstructuresandproperty.Contractorshallprovideonesetof3"X5"printsorasetondisktotheOwnerandretainnegativesandonesetofprintsfortheirrecords.Sufficientphotoswithadequatedetailtothoroughlydocumenttheconditionssurroundingtheworkshallbeprovided.
B.Atthecompletionoftheproject,Contractorshallrestoreexistingbuildings,landscaping,parkingfacilitiesandpropertytosameconditionaspriortothestartofthework.
ProjectManageradjusttofitspecificjob.Expandabovetosuitindividualprojectneedsorrequirements.
C.InadditiontotherequirementsoftheGeneralConditionsoftheContractforConstruction,theContractorshall:
1.Notify,inwriting,theOwnerofUniversityorprivatepropertywhichinterfereswiththeworkandarrangewiththemfordispositionofsuchproperty.
2.Provideandmaintainpropershoringandbracingtoprevent
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- Quality requirements for construction projects 建设项目质量要求英文版 建设项目 质量 要求 英文
链接地址:https://www.bdocx.com/doc/3537925.html