国际BOT投资合同
AGREEMENTOFBOTPROJECT
ThisAgreementismadeandenteredintobyandbetween
Thegovernment of_____________(hereinafter called “B”) representedby________(hereinaftercalled“A”)
And__________Corporation,acompanydulyorganizedandexistingunderthelaws of the People’s Republic of China with its principal officeat___________(hereinaftercalled“C”)。
Whereas,AandCconcludedtheMemorandumConcerning__________Projectonthe____________andChadbeengivenExclusiveRightfrom B to carryoutinvestigationandimplement____________Project(hereinaftercalled“theProject”)bywayofjointfinancingbetweenCandB(socalledBOT)。
Whereas,theloanagreement,guaranteeagreement,letterofguarantee,etc.shallconstituteintegralcomponentsofthisAgreement.TheProject’sinstalledcapacityis__________.
Nowtherefore,thepartiesherebyagreeasfollows:
1.DefinitionandInterpretation
“Project” means the planning, feasibility study, design andengineering,construction,equipping,completion, testing, commissioningandoperationoftheinfrastructureproject.
“ProjectCost”meansthecostspecifiedinClause3.
“OperationPeriod”meanstheperiodspecifiedinClause10.1from thestartingdateofcommercialoperationoftheinfrastructureproject.
“CompletionDate”meansthe day upon which C certifies that theinfrastructureprojecthassuccessfully completed its testing and canstartOperationPeriod.
“ForceMajeure”shallhavethemeaningspecifiedinClause16.
“ProjectScope”meansthe scope of supply and services of C inconnectionwiththeexecutionoftheProjectasdescribedinAnnex2.
“Site” means the site for the infrastructure project including___________,specialroads,andotherareasforconstructionas specifiedinAnnex2.
“TransferDate”meansthedayfollowingthelastdayofthe OperationPeriod.
“NewCompany”meansthe Company to be established between C and________entityasspecifiedinClause5.
“InvestmentAgreement”meanstheAgreementonMutualEncouragementandProtectionofInvestmentbetweentheGovernmentofthe People’s RepublicofChinaandtheGovernmentofthe___________.
“ExclusiveRight”meansthespecialpowergrantedtoCorNew CompanyintheMemorandum,Agreementanditsannex.
“Day”meansthesolarcalendarday.
2.TheProject
2.1TheProjectshallbenamedas“________”。
2.2 The infrastructure project is intended to be located at__________.Theexact location of the infrastructure project may beadjustedatthestageofdetaileddesign in consideration of the sitecondition.
2.3TheProject shall be implemented on Building, Operation andTransferBasis.
2.4TheProjectshallbecomposedof____________________, _________,_________,thedetailsofwhichshallbeasattachedAnnex2 - Scope oftheProject.
2.5Thefinalfeasibility study report and detailed design afteracceptanceofBandCshallformbasisforthedevelopmentand completionoftheProject.
3.TheProjectCost
3.1Theprojectcostis$______,interestofthe construction periodis$______,thetotalprojectcostis $__________, and the details ofwhichareshowninAnnex3-ProjectCost.
3.2Thetotalprojectcostshall comprise but not limited to thefollowingcostsandthedetailsoftheprojectcostshallbe as attachedAnnex3-ProjectCost:
1)Costfor feasibility study, design and engineering and otherconsultingservices;
2)Costforconstructionandinstallation;
3)Costforpurchasingequipmentandmaterials;
4)Costforadministrationincludingoverseasexpenses;
5)Overheadandmiscellaneousexpenses;
6)Contingencies;
7)Interestduringtheconstructionperiod(__________%perannumplusbankcommission);
8)Premiumforconstructioninsuranceandexportcreditinsurance.
3.3TheProjectCostshallbebasedonthe feasibility study reportandincaseofasubstantialvariationininvestmentarisingfromgeologicreasons,theadditionalparttotheProjectCostshallbeapproved by B.AnadditionalinvestmentagreementorcontractshouldbeconcludedbetweenBandC.
4.ResponsibilitiesforProjectExecution
4.1Cshallberesponsibleforthe following provided that if andafterNewCompanyisestablished,responsibilitiesshallbetransferredtoNewCompanyandbesharedbythemembersofNewCompany:
1) the design and engineering, procurement, construction andcommissioningoftheProject;
2)allcostsinconnectionwiththe building of the infrastructureprojectandthearrangementofallnecessaryfunding;
3)operationoftheinfrastructureproject;
4)transferoftheinfrastructureprojecttoBontheTransferDate;
4.2Bshallberesponsiblefor:
1)thearrangementof:
the provision of all necessary development approvals, permits,consents,siteleases,accessand other rights for C or New Companytogetherwiththefulfillmentofessentialrequirements such as companyregistration,importlicenseandexemptionofcustomsdutiesandthelike;
theprovisionofallnecessaryordesirableaidsforCto obtain theloan;
obtainingofallregulatory,statutoryandotherconsents, approvals,authorizations,taxconcessionsand investment incentives as describedhereinafterwhicharenecessaryordesirablefortheimplementationoftheProject;
obtainingofallnecessarypermitsand approvals from the relevant_____________authoritiesforCorNewCompanyto repatriate capital anddividendsinUSDollarsfrom______;
obtaining of resident visas, work permits and other necessaryapprovalsfromtherelevantauthoritiesforCorNewCompany’s personnel,design,manufacturing,installationandconstructionpersonnelaswell astheirdirectrelativesincludingthetravelin___________;
theprovisionofall necessary approvals and permits relating toextensionoftheinfrastructureproject and the Project facilities inordertoincrease_________________productionifCorNewCompany intendstodoso;
theprovisionofallnecessarysecuritymeasuresforconstruction andoperationpersonnelandProjectfacilitiestilltheTransferDate;
theprovision of communications and transport facilities of theProjectconstructionandtheoperationoftheinfrastructureproject;
2)theassistanceintheoperationoftheinfrastructureproject.
3)providingCand/orNewCompanywithfreeuseoftheSite,includingbut not limited to the area of construction site, access road,transmissionlinerightofway,__________andetc.
4) the negotiation and conclusion of service agreement with___________Governmentorothercountries’governmentsjointly with C ornewCompany,thePeople’s Insurance Company of China representatives,whosepresenceinthenegotiationBshallensure, and whose approval BShallobtain;
5)theexportationof________________percentof __________ producedbytheinfrastructureprojectto__________oranythirdcountry;
6)theassignmentofits representatives at Site and to the NewCompanytoassistCorNewCompanyandmakenecessarycoordinationbetweenBandCorNewCompany.
4.3BensuresthattheOperationPeriodoftheProject shall be notlessthan_______years.HoweverifIRR(InterRate of Return) does notreach_______percent,bothpartieswilldiscussthe proper extension oftheOperationPerioduntiltheyearIRRreaches_______%.
4.4ConditionsPrecedent
Bshallberesponsiblefortheprovisionof the following documentsforCtomakeavailableanypartofthis Agreement within _______monthsfromthedateofsigningthisAgreementandsuchdocumentsshallbe validandeffectivetoNewCompany:
1) a power guarantee issued by ___________________parliamentacceptabletoCintheformdefinedinAnnex7,whichshallbereturnedtoBontheTransferDate;
2)warrantytobeissuedandloanagreementtobeconcluded with theproposalmadebyBforbearing__________percentoftheProjectCost, theBankof______________astheloaneeand__________FinanceMinistryas theguarantorandacceptabletotheBankofChinaandthe People’s InsuranceCompanyofChina,andaletterofcreditor letter of guarantee to beissuedasrequiredbytheBank of China provided that the length ofmaturityis__________yearsincludinga _______year construction periodandloaninterest is ________percent per annum; B may make earlierreimbursement;
3)loanguaranteeandwarrantyfor C’s sharing __________% of theProjectCostincludinginterestoftheconstructionperiodtobeissuedbytheBankof_____________and______________FinanceMinistryrespectively,acceptabletothePeople’sInsuranceCompanyofChinaandtheLendingBankandvaliduntiltotheTransferDate(__________),providingallnecessaryassistanceinenablingCto obtain the loan from international primebanks;
4)thelegalcertificateissuedby_____________President of SupremeCourt and the legal certificate issued by______________ ProcuratorGeneral,certifyingthatthisAgreementshall be valid and enforceableunderthelawsof_____________ineveryrespectin the form defined inAnnex 8; the certificate of approval issued by the Government of_____________,certifyingthattheProjectislawfulandlegitimate;
5)Bshallpermittheconstructionmachinery,material and equipmentnecessary for the Project to be transported into __________via_____________bysea,and/orbyroadthrough__________asWellas by air,ensuring facilities from the __________borde