WORKSITEEMERGENCYRESPONSEPROCEDURE
___________________________________________________________________
E1
IssueforConstruction
DMaughan
BDennis
DMaughan
MKawaguchi/RBianciotto
24Nov‘05
MARK
DESCRIPTION
BY
CHKD
APV
APVD
DATE
REVISIONS
CLIENT
:
QatarLiquefiedGasCompanyLimited(II)
PROJECT
:
QatargasIIDevelopmentProject
JOBNO.
:
DOCNO.
:
QGX/20/00/SA/PC/NA/114
(1/20)
CONTENTS
SectionPage
1.PURPOSE4
2.SCOPE4
3.DEFINITIONS5
4.ORGANIZATIONANDRESPONSIBILITIES5
3.1Organization5
3.2RolesandResponsibilities6
5.IDENTIFICATIONOFPOTENTIALINCIDENTSANDASSOCIATEDACTIONPLANS9
4.1IdentificationofPotentialIncidents9
4.2EmergencyResponse9
4.3EmergencyResponseInstruction10
4.4EmergencyResponseClassification10
4.5InjuryAccidentResponseInstructions11
4.6ActionPlansofEmergencyCommunication11
6.RESPONDERANDNON-RESPONDERFOREMERGENCYRESPONSETRAINING14
5.1EmergencyResponseTrainingforResponder14
5.2EmergencyResponseTrainingforNon-Responder14
7.DRILLS14
8.REQUIREDLIFESAVINGEQUIPMENTANDTRANSPORTATIONSYSTEM15
7.1EquipmentforEmergencyUse15
7.2TransportationSystemforEmergency15
9.MUSTERAREAS,METHODSOFACCOUNTINGFORPERSONNEL,ANDASSOCIATEDPROCEDURES16
8.1DesignatedEvacuationRouteandAssemblyArea16
8.2RegisterofPersonnel16
10.EMERGENCYALARMSYSTEM16
11.NOTIFICATIONANDREPORTING17
12.EMERGENCYEGRESSROUTES17
13.PROVISIONOFONSITECERTIFIEDMEDICSANDMEDICALFACILITIES/EQUIPMENT17
14.EMERGENCYTRANSPORTATIONTOPROFESSIONALMEDICALFACILITIES17
15.INTERNALANDEXTERNALCOMMUNICATIONS18
16.ACTIONSTOTAKEINTHELNGTANKAREAINTHEEVENTOFANEMERGENCY18
17.ACTIONSTOTAKEINTHECAMPAREAINTHEEVENTOFANEMERGENCY19
18.ACTIONSTOTAKEINTHETSFAREAINTHEEVENTOFANEMERGENCY19
19.ATTACHMENTS20
PURPOSE
ThepurposeofthisprocedureistoprovideclearandconcisecommunicationoftheEmergencyEvacuationPlanfortheQatarGasIIDevelopmentProject(hereinaftercalled“TheProject”).Inthisprocedureisidentifiedtheresponse,actionandresponsibilitiesforeffectivemanagement,therecoveryfromemergenciessuchasfire,explosions,leakoftoxicorflammablegasorliquid,equipment/facilitiesfailureandnaturaldisasters.However,thisproceduredoesnotaddresstheemergencyresponsestoemergenciessuchas;riot,terroristactions,bombthreat,civilunrestetc.
Inaddition,italsoidentifiesthenecessaryprocedurestoeffectivelymaintaintheaccessandegresspointstotheProjectsiteinordertosafelyevacuatetheemployeesofCONTRACTORandSubcontractor,andtheotherpersonnelfromtheProjectsitetothedesignatedemergencyevacuationpointsintheRasLaffanIndustrialarea.
SCOPE
Thisprocedurecoverstheorganization,individualrolesandactivities,andevacuationduringanemergencyeitherasaresultofconstructionactivitiesorresultingfromplantoperations.
TheEmergencyandEvacuationPlansetupatbeginningoftheworkshallapplytotheconstructionsite,includingoffplotareassuchasTSF,Camps,Tanks,Portetc.an“OutlineofEmergencyResponsePlan”isfoundinAttachment-1.ForincidentsoccurringwithintheoperatingplantQGprocedureswillapply.
Measurestopreventanemergency,suchasaFirePreventionandFireProtectionProcedure,provisionofflammablegasdetectors,firewalls,etc.arehandledseparatelyfromthisprocedure.
CTJVresponsetoincidentsontheconstructionsitesandcampsundertheircontrolwillbeconfinedto,thoseTier1incidentswhichcanbereasonablyforeseenduringconstructionactivities,uptobutnotincluding,precommissioningandcommissioningactivities.Suchincidentsarebydefinitionminor;fires,industrialaccidents,orspillagesofhazardousmaterials,witharemotepotentialforescalationandwhichposeaminimumthreattosafetyandtheenvironment.
IntheunlikelyeventofamoreseriousTier2orTier3incidentoccurringwithintheCOMPANYboundarythenQGemergencyserviceswouldbecontactedtoprovideassistance.ShouldsimilarincidentsoccuroutsideoftheCOMPANYboundaryfence;TSF,Camps,Tanks,Jetty,thenRLCwouldbecontactedforemergencyassistance.InallcasesCONTRACTORwillretaincontroloftheincident.
Tokeepcurrentwithsiteactivitiesthisprocedurewillbereviewedonathreemonthlybasisasaminimum.
DEFINITIONS
OperatingPlantQG
COMPANY:
QGII
CONTRACTOR:
CTJV
RasLaffanIndustrialCityRLC
ORGANIZATIONANDRESPONSIBILITIES
3.1Organization
TheSiteManagershallestablishanEmergencyOrganizationandEvacuationPlanconsistingofCONTRACTORandSubcontractors’staff.TheEmergencyOrganizationseeAttachment-2“EmergencyResponseOrganization”shallconsistof:
(1)EmergencyControlCenter(hereinaftercalled“ECC”):
∙TocontroloverallactivitiesunderthedirectionoftheSiteManager.
∙Coordinateinternalandexternalemergencyactivitiesandcommunication.
(2)EmergencyMedical/FirstAidCenter:
∙Toattendtotheinjuredandreferthemtodesignatedhospitals.
∙Toprovidefirstaidandambulanceservice.
(3)InformationSupportTeam:
∙TocollectinformationfromallsourcesandinformthenecessarypersonnelsuchasCONTRACTORandSubcontractorManagement,LocalAuthorities,COMPANY,aswellasProjectManagementandCONTRACTOR’sHSEManagement(HomeOffices).
∙Toprovideinformationonplantlayout,dangerouschemicalsandsubstances,potentialhazards,etc.
(4)LogisticSupportTeam:
∙Toprovidemanpowerandequipmenttofacilitateemergencyresponseactions.
∙Toprovidemanpower,equipment,facilitiesandutilitiessupport.
(5)EmergencyActionTeam:
Tocontrolthespreadofanyemergencyanddirectthesearchandrescue,firefighting,andcrowdcontrolactivities.
TheCONTRACTORSiteSHESManagershallorganizeasiteemergencyresponseteamcomprisingpeoplewithknowledgeandexperiencetocopewith;medicalincident,fire,chemicalspillsandrescuetechnique.
Whereappropriatesubcontractorstaffwithparticularskillswillbesecondedintotheteam.
a)SearchandRescueGroup;
∙Toconductsearchandrescueoperationforknownvictimstrappedormissing.
∙Thiscoregroupwillcompriseateamof6membersoftheCONTRACTORHSEteamselectedfortheirexperienceandabilitiesinthissortofwork.
∙TheCONTRACTORSiteSHESManagerisresponsibleforprovidingthemembersoftheEmergencyResponseTeamwithinitialandrefreshertraining:
ineffectiveuseoftelecommunications;emergencydrivingtechniques;primaryfirstaid;firefighting;rescuefromheight;rescuefromConfinedSpaceandanyothertrainingwhichisdeemednecessaryonanasneededbasis.
b)FireFightingGroup:
∙Tofightfirestotheextentofitscapability,cooperatingwiththeCOMPANY'sand/orRLICFireBrigadeinmoreseriousincidents.
∙ThefirefightinggroupwillbeledbyCONTRACTORHSESupervisor.
(6)PreventionTeam:
∙Totakepreventivemeasurestopreventtherecurrenceorspreadoftheincident.
∙Toensureallpersonnelonsiteevacuatetoadesignatedsafeplace.
3.2RolesandResponsibilities
1)SiteManager
SiteManagershallhaveoverallresponsibilitiesduringEmergencies,heshalldirecthisstafftotakeallnecessaryprecautionstopreventanemergency.DuringtheabsenceoftheSiteManager,theConstructionManagershallbedeputizedtoserveinthisposition.
Hismajordutiesandresponsibilitiesareto:
∙EstablishandmakepublicanEmergencyPlanandanEvacuationPlan.
Whenestablishingtheseplans,heshallobtaininformationonCOMPANY'srequirementsandsystemforemergenciesandevacuation.
∙DirectthestaffofEmergencyControlCentre.
∙IssuetheEmergencyAlertaccordingtothealertsystem.
∙Issuetheevacuationordertoallpersonnelonthesite.
∙Issuethe“AllClear”afterconfirmingitwithCOMPANY.
∙LiaisecloselywithCOMPANYduringanemergency.
∙EnsurefirefightingandevacuationtrainingincludingElevatedWorkRescueTechniquesarepracticed.
∙ReportemergenciesinatimelymannertoProjectManagerandtoCONTRACTOR’sHSEManagementOffice(HomeOffice).
∙Participationinpostincidentdebriefing.
2)SiteSHESManager
SHESManagershallassistandadviseSiteManagerintheEmergencyControlCentretocoordinateemergencyactivitieswithallemergencyteamsasstipulatedin3.1.
IntheabsenceofSHESManager,SHESSeniorSuperintendentshallassumehisresponsibilities.
Hismajordutiesandresponsibilitiesareto:
∙PreparetheEmergencyandEvacuationPlansonbehalfofSiteManager.
∙PlanandconductTrainingandDrillsforfirefighting,rescueandevacuationatleasttwiceayear.
∙Prepareequipmentforemergencyuse.
∙InstructnewstaffandworkersduringtheHSEInductiontrainingregardingtheEmergencyCommunicationSystem,howtorespondduringemergenciesandhowtocarryoutevacuations.
∙CoordinateresponsesbetweenOnplotandOffplot.
∙IntheeventofanyincidentprovideanimmediatereportofknownfactstoCOMPANYHSErepresentative.
∙Determineifincidentisreportabletolocalauthorities.
∙Whensituationisstabilized,conductaninvestigationofthecauseseffectsandresponsetotheemergency,andprepareawrittenreport,highlightingconclusionsandrecommendations.
∙Ensurethatallrecommendationsareclosedoutinatimelyfashionbytheappointedactionees.
3)SeniorSHESSuperintendent
SeniorSHESSuperintendentshallassistSHESManager.
Hismajordutiesandresponsibilitiesareto:
∙DirecttheE
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- qcs5000sapcna914e11
![提示](https://static.bdocx.com/images/bang_tan.gif)