DeskStudyandFieldAssessmentReport02FinalwithMSreview
Client:
GuangdongLNGTerminalandTrunklineProject–JointExecutiveOffice
Project:
GuangdongLNGTerminalandTrunklineProject,China
Title:
PreliminaryLandslideRiskAssessmentofProposedPipelineRoutesBasedonDeskStudyandSelectedFieldVisits
DocumentReference:
5001585/GTG.2001334/DeskStudyandFieldAssessmentReport(02Final)
02
Final
JHC
EML
SPP
PGF
MS
13/02/2003
01
Draftforreviewby:
Client,
Prof.P.G.Fookes,
MrM.Sweeney
JHC
EML
SPP
DTS
DTS
20/12/2002
Revision/Status
Purpose/Description
Originated
Checked
Reviewed
Authorised
Date
CONTENTS
EXECUTIVESUMMARY1
1.INTRODUCTION3
1.1Background3
1.2SubsequentWorkonLandslideRisk4
1.3Scopeofwork5
1.4Programme6
2.REGIONALSETTING9
2.1GeologyandTerrain9
2.2ClimateandWeathering10
2.3KeyTerrainIssues10
2.3.1SlopeProcesses10
2.3.2Otherissues11
3.LANDSLIDEHAZARDANDRISK13
3.1Introduction13
3.2NaturalTerrainLandslidinginHongKong15
3.3ApplicabilityofHongKongLandslideStatisticstotheGuangdongArea17
3.4CutSlopeFailuresinHongKong18
4.LandslideRiskAssessmentfortheProposedPipelineRoute21
4.1Introduction21
4.2NaturalTerrainLandslides22
4.2.1OverallRisk22
4.2.2RelativeRiskwithinLandslideProneLengthsoftheRoute24
4.3Man-madeCutSlopes26
4.3.1Introduction26
4.3.2AssessmentoftheProposedPipelineRoute26
4.4CombinedNaturalTerrainandCutSlopes30
4.5Summary31
4.6ComparisonofRiskwithOtherPipelines33
5.OPTIONSFORTHEMITIGATIONOFLANDSLIDERISK34
5.1Introduction34
5.2‘RidgeandSpur’Alignments35
5.3Engineeringthepipelinetoisolateitfromexistingandpotentiallandslideanderosionprocesses36
5.4ManagementofSpoil36
5.5ManagementofSurfaceWater37
5.6Summary38
6.FIELDASSESSMENTOFVISITEDAREAS39
6.1StakeNos.B084toC007-2(seeTerrainMapNo.11)43
6.2StakeNos.B072-1toB083(seeTerrainMapNo.12)44
6.3StakeNos.B048toB055-1(seeTerrainMapNo.13)45
6.4StakeNos.B030-1toB039(seeTerrainMapNo.13)46
6.5StakeNos.B002toB012-1(seeterrainMapNo.14)47
6.6StakeNos.A001toA016(seeTerrainMapNo.14)48
6.7StakeNos.A034-1toA039-1(note:
noTerrainMapproducedforthisarea)49
6.8StakeNos.1001to1032(seeTerrainMapNo.15)50
6.9StakeNos.1123to1131(seeTerrainMapNo.16)51
6.10StakeNos.2015to3006(seeTerrainMapNo.17)52
6.11StakeNos.3031to3042(seeTerrainMapNo.18)53
6.12StakeNos.3060to3068(seeTerrainMapNo.18)54
7.CONCLUDINGREMARKS55
7.1LandslideRisk55
7.2OtherTerrainIssues58
7.3TheWayForward58
8.References60
TABLES(inthetext)
Table1FieldVisitProgramme.
Table2SummaryGeologyofGuangdongProvince.
Table3RiskAssessmentDefinitions(fromRoyalSociety,1992;CrudenandFell1997).
Table4RainfallThresholdsforLandslideActivityinHongKong(Evans,1997;Evansetal.,1997).
Table5WidthClassesofRelictandRecentLandslidesintheNaturalTerrainLandslideInventoryforHongKong(fromEvansetal.,1997).
Table6LandslidesinHongKongRecordedbytheGeotechnicalEngineeringOffice(fromFelletal.,1996).
Table7SlopeApproachClasses(OrientationofthePipelineRelativetotheSlope).
Table8NaturalTerrainRiskAssessment:
SummaryStatistics.
Table9SummaryofNaturalTerrainLandslideSusceptibilityClassesforSelectedHongKongBedrocks(adaptedfromEvansandKing,1997).
Table10NaturalTerrainLandslides:
RelativeRiskClasses.
Table11NaturalTerrainLandslides:
SummaryoftheLengthsAssociatedwitheachRelativeRiskClass.
Table12Example1,aFullyEngineeredandMaintainedCutSlopes:
AssessmentoftheProbabilityofCutSlopeFailure(basedonFindlayandFell,1995).
Table13Example2,MinimallyEngineeredCutSlopes:
AssessmentoftheProbabilityofCutSlopeFailure(basedonFindlayandFell,1995).
Table14LandslideRiskAssessmentfortheAugust2002PipelineRoute:
SummaryStatistics.
APPENDICES
AppendixAPreliminaryNaturalTerrainLandslideRiskAssessment
AppendixBPreliminaryCutSlopeLandslideRiskAssessment
AppendixCPreliminaryCombinedLandslideRiskAssessment
AppendixDTechnicalPaper:
FrameworkforAssessingtheProbabilityofSlidingofCutSlope(fromFelletal.,1996)
AppendixELocationofWaypointsandPhotographs
AppendixFSummaryofGeologyoftheGuangdongProvince
FIGURES
Figure1RegionalContextandKeyMapofGuangdongProvince
Figure2LandslidesRupturesFrequencies
Figure3aScaleofWeatheringGradesofRockMass
Figure3bModelsofWeatheringinGranite
Figure4TypicalShallowHillsideFailure
Figure5ProblemsAssociatedwithRoutingAcrossDeepGullysandSpurs
Figure6TypeofLandslidesonCutSlopes
Figure7EventTreeIllustratingPotentialPipeRuptureScenariosAssociatedwithCutSlopeFailures
Figure8FlowchartforCutSlopeInstabilityRiskAssessment
Figure9ASummaryoftheCombinedRiskAssessmentApproach
Figure10PipelineConstructiononSideSlopes
Figure11PipelineConstructionalongNarrowRidges
Figure12PipelineConstructiononSteepSlopes
Figure13SecuringthePipelineonNarrowRidgeLines
Figure14EarthworksonMountainpipelines:
SpoilManagementStrategies
Figure15DiversityofRestorationWorksonSteepSlopes
(Figure2andFigures10to15havebeenprovidedbyBP).
PLATES
Plate1NaturalTerrainLandslides:
RelativeLandslideRisk
PHOTOGRAPHS
ThephotographsareincludedindigitalformatonaCDattheendofthisreport.
DRAWINGS
5001585/GTG.2001334/100to119Rev.APreliminaryNaturalTerrainLandslideRiskAssessment–Sheets1to20
5001585/GTG.2001334/120Rev.AKeyMapforLandslideRiskAreas
5001585/GTG.2001334/010to018Rev.ATerrainMaps–Sheets1to9
5001585/GTG.2001334/021to028Rev.APreliminaryLandslideMapofAreasCoveredbytheTerrainMaps–Sheets1to8
PleasenotethatallthedrawingsarereproducedindigitalformatonaCDincludedattheendofthisreport.
EXECUTIVESUMMARY
TheproposedGuangdongLNGpipelinepassesthroughapproximately60kmofdissected,hillyterrain.Thesehillsareparticularlypronetolandslidingbecauseofthecombinationoflong-termdeeptropicalweatheringandthefrequenthighintensityrainstorms.Themajorityofthesenaturalterrainlandslidestendtooccurwithintheweatheredresidualsoilsthatmantlemuchoftheterraintodepthsofover25m.AspartoftheNovember2002fieldvisitweinspectedaround30kmofthemostseverehillyterrain.Ourobservationsduringthevisithaveindicatedthatexcavationofa12mwideplatformforthepipelineright-of-wayisunlikelytoexposeindurated‘rock-like’materials.Asaresult,thepipelinewillbeatriskfromlandslidesthatmayoccurwithintheweatheredsoilsandrocksandoverlyingcolluvium.
Constructionofthepipelinealongtheproposedalignment,whichcrossessignificantlengthsofsidelongground,wouldrequireextensivecuttingintothehillslopestocreatearight-of-wayplatform.Failureofcutslopesalsopresentsasignificanthazardtothepipeline.
TheobjectiveoftheNovember2002fieldvisitwastoprovideanindicationofthenatureandscaleofthelandsliderisktotheproposedroute(asofAugust2002)andtoadviseontheoptionsavailableforreducingtheserisks.TheworkpresentedinthisReportprovidesanindicationoftheleveloflandslideriskthatshouldbeexpectedalongtheproposedroute.Ascenariohasbeenassessedthatconsidersthecurrentroutealignmentwithnolandslidepreventativemeasuresorslopemaintenance.
Thelandslideriskreflectsacombinationofthethreatpresentedbybothnaturalterrainlandslidesandcutslopefailures.ThesetwoissueshavebeenconsideredseparatelyintheReport.Ofparticularnote,theestimatedriskassociatedwithman-madecuttingscanbehigherthanthatresultingfromnaturalterrainlandslides.ThisisconsistentwithexperienceinneighbouringHongKong.Pipelinedamagecausedbylandslidestendstoinvolvecatastrophicfull-borerupture.
Ourbestestimateofthelandslide-triggeredrupturerateisintherangefrom0.38to0.042peryearforthe300kmlengthofpipelineroute.Thisisequivalentto1.27to0.14ruptures/1000km/year.Consideringjustthe60kmtotallengthoflandslideprone(hilly)terrain,theequivalentfigurebecomesaround6.4to0.7ruptures/1000km/year.
Anumberofoptionsareavailableformanagingthepotentiallandslideproblems,including:
∙Adoptingalignmentsthatavoidsectionswherethepipewouldbeexposedtohighlevelsoflandslideriski.e.avoidsidelonggroundandsteep-sidedgulliesorravines;
∙Ensuringthatallcutslopesaredesigned,constructedandstabilisedtoahighstandard.Thisoptionneedstobeaccompaniedbyaprogrammeofon-goingmaintenance,repairandclean-upoperations.
Ahighstandardofdesignandconstruction,includingdetailedstabilisationworksforthecuttings,canprobablydeliversignificantriskreduction.However,itwillbeatamajorcostandwillrequirealong-termcommitmenttomaintenance,repairandclean-upoperationstoensurethatwhencutslopefailuresoccurtheyarenotallowedtodeterioratetoapointwheretheycanleadtopiperupture.Iftheseoperationsaresub-standardorreduced,thelandslideriskassociatedwithcutslopefailureswouldbeincreased.
Experiencehasshownthatthemostcost-effectiveapproachtoreducinglandslideriskistoadoptaroutingstrategythatminimisesthenecessityforconstructiononsidelongground(sideslopes)andcrossingsofsteepcatchments.Alternativeroutingcanbebasedonth
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- Desk Study and Field Assessment Report 02 Final with MS review
链接地址:https://www.bdocx.com/doc/24444099.html