英文产品说明书.docx
- 文档编号:24433242
- 上传时间:2023-05-27
- 格式:DOCX
- 页数:19
- 大小:846.83KB
英文产品说明书.docx
《英文产品说明书.docx》由会员分享,可在线阅读,更多相关《英文产品说明书.docx(19页珍藏版)》请在冰豆网上搜索。
英文产品说明书
Spiralchute
1、productdescription
Spiralchuteisintegratedspiralseparator,spiralchute,shaker,centrifugalconcentrationmachinecharacteristicsoftheequipment,mining,mineralprocessingisthebestequipment,especiallytheseaside,riverside,sandbeach,thestreamofplacerminingismoreideal.Theproducthastheadvantagesofreasonablestructure,simpleinstallation,coversanareaofsmall,simpleoperation,stableorebeneficiation,clear,largeprocessingcapacity,highefficiencyenrichmentratiohigh,highrecoveryrate,reliableoperationcharacteristics.Haveweightlight,moisture-proof,rust-proof,corrosionresistance,ofthefeedingquantityandconcentration,particlesize,qualityofvolatilityadaptabilityisstrong,nonoise.
2、Separationprinciple
Spiralchuteisamembraneflowgravityseparationequipment,theselectionprincipleistheuseofusefulmineralsandgangueinproportion,particlesize,shapedifferences,inrotatinginclinedflowbygravity,centrifugalforce,hydrodynamicpressureandfrictionforcewithdifferentgrooveface,realizetheusefulmineralsandganguestratification,branchtapesorting.Heavy,coarsegranularity,fastsedimentationofparticlesgraduallymovedtowardsthespiralgrooveinneredge,theproportionofsmall,fineparticlesize,particlesedimentationslowgraduallymovedtothespiralgrooveedge,graduallybanding,
culminatinginthespiralgrooveendbycuttingoretankisrespectivelyconnectedout,torealizeseparation.
3、Application
Thesortingequipmentforgrainsizemmfineironore,titaniumore,chromite,pyrite,zircon,monazite,rutile,phosphorusore,tungsten,tin,Bmineoftantalumniobiumorewiththedifferenceofspecificgravity,andothernon-ferrousmetals,raremetalsandnon-metallicmineral.Thesortingprocesswithastable,easytocontrol,toallowchangestothemineralconcentrationrange,highenrichment,highrecoveryrate,smalloccupationarea,littlewaterconsumption,simplestructure,noneedofpower,largeprocessingquantity,simpleinstallation,convenientoperation,smallinvestment,quickadvantages.
4、Themethodofuse
Thespiralchuteiserected,calibratedverticalline,withmetalorwoodfixedinposition,bythesandpumpwilloretospiraltoptwoinlet,addingsupplementalwater,mineraloreconcentrationregulationpaddle,paddledownnaturallyfromhighswirl,inrotatinginclinedflowproducesakindofinertialcentrifugalforce,withoreproportion,particlesize,shapedifferences,swirlthroughtheactionofgravityandcentrifugalforce,willbemineandsandseparating,concentrateintotheconcentratepipeconnectedwithahopper,tailingsintotailingbucketapipelineisconnectedtoasandpool,thenthepumpdischarge,finishedprocessingthewholeprocess.
五、Structureandtechnicalparameter
Mainlybytheoreseparator,cross,tominegroove,helicalgroove,cuttingtrough,pickorebucketandslotpillarofsevencomponents.Thehelicalgrooveisspiralchuteofthemaincomponents,eachspiralchuteis2--4headspiralgroove,eachheadspiralgrooveiscomposedof5spiralplates(accordingtomineralpropertiesandbeneficiationprocessneed,aftertestsalsoconsider4circles,inordertoreducetheequipmentheight)spiralplatebyboltsarefixedtogether,spiralsheetismadeofglassfiberreinforcedplastic(FRP)made,lightweight,anti-corrosion,moisture-proof,antideformationandstrength.
六、Installation
Spiralchuteinstallationproceduresandrequirements:
1)Firstchecktheglasssteelspiralslicequality(especiallytheworksurfacequality),sizeandshapetomeettherequirementsforassembly
2)Screwplateconnectingboltholebythegeneralfactoryinadvancewithadrill.Ifthe
manufacturerhasnoprocessingisrequired,accordingtothesametemplatedrilling,inordertoensuregoodinterchangeability.
3)Boltthefivecoilsheetareconnectedintoagroupofspiralgroove,levelset,twoadjacentflangeconnectionwithinthesurfacesmoothtransitionisconnected,specialattentionshouldbepaidonthesurfacemaynotbelowerthanthecorrespondinglowersheetsurface.Alongthediameterdirection.(theslotwidthdirection)toedgealignmentasthestandard,donotallowplateriminside,sotheinstallationisintendedtopreventtheoccurrenceoforefluidsplash.Jointgap,withputty.
4)Thecoupledfiveofagroupoffour(ortwoorthree)spiralgrooverotatingtogetherintoadesiredshape,distribution.
5)Thefourroots(three)columnisrespectivelyarrangedinfour(orthree,two)spiralgroove,boltthespiralgrooveandthepillarisfixed,theninstallthecross(tripod),sothateachspiralalongtheparkarecloth,thenallbolts.Afterinstallation,spiralplatetomaintainthenaturalshape,withnoobviousvariant.
6)Wouldgiveminegrooveandproductinterceptiongroovearerespectivelyarrangedinthespiralgrooveoftheheadendandthetailendtoensurethattheconnectionofclosewaterleakage.Ifthereisagap,bycoatingsealing.Toensurethesmoothtransitionofgroovesurface.
7)Tomineevendividerandproductassemblebucketandtheslotbracketisnotconnected,freeplacedonthebracket,theinstallationshouldpayattentiontointhechartareposition.Eachrowoftubetodistributorarerespectivelyalignedwithcorrespondingtotheoretank.
6-Sshakingtable
一、Application
The6-Sshakingtableisoneofthemainequipmentofgravityconcentration,itiswidelyusedinseparatingtungsten,tin,tantalum,niobium,goldandotherraremetalsandpreciousmetalore.Canbeusedforroughing,concentration,scavengingdifferentoperations,separatingcoarsesandfinesand,clay(-ofdifferentgraingradeItcanalsobeusedtoseparateiron,manganeseoreandcoal.Whenprocessingtungsten,tinore,thetableeffectiverecyclingparticlesizerangeforthemm.
二、Performance
Theshakingtableisinthebeneficiationprocessiscomplexatiltbedplane,oreparticleswarmfromthebedsurfaceangletothetroughinto,atthesametimebylateralflushingwatersupplytothewatertank,andthemineralparticlesingravity,lateralflowmomentum,bedreciprocatingasymmetricmotionproducedbytheinertiaandfrictioneffectsnext,accordingtotheproportionandhierarchicalgranularity,andalongthebedsurfaceforlongitudinalmovementalongtheinclinedbedsurfaceandtransversemotion.Therefore,specificgravityandparticlesizeofdifferentmineralparticlesalongthedirectionofmovementoftherespectivegraduallybytheAsidetosideBfan-shapedshed,concentrateandtailingsfromtheendsideofthedischargingendisdividedinto
different,concentrate,middlingandtailings.
6-shasadoublehighrichoreratio,highseparationefficiency,safeguardseasily,convenientforadjustingthestroke.Inchangecrossfallandstrokeisstillmaintainthesurfaceofbedmovementbalance,thespringisplacedintheboxbody,compactstructure,andcaninturndrawfinalconcentrateandtailings.
3、Classification
1)Accordingtothedifferentpositionofore,shakercanbedividedintorightandlefttypecradletypecradletwoforms.Therighttypecradlefortheorelocationfortherockingmechanismisontherightside,lefttypecradletomineislocatedintheleft.
2)6-Sshakercanbedividedintofixedshakingtable,channelbarshakingtable,bigchannelsteelshakingtable.
3)Accordingtotheconcentrationparticlesize,dividedintocoarsesandtable,sandtableandslimmerthree.
4、Structure
Thistableismainlycomposedofabedhead,motor,adjustableslope,thebedsurface,mineshafts,sink,andreflexandlubricationsystemofeightcomponents.
Thesurfaceofbedlongitudinalreciprocatingmotionthroughacrankconnectingrodtypedrivingmechanismtorealize.Theelectricmotorthroughthebeltdrivetomakethebigbeltwheeldrivesthecrankshafttorotate,therockermadesubsequentlymovesupanddown,rockerdownwards,elbowboarddriverearaxleandthereciprocatingrodmovesbackwards,thespringbeingcompressed.Thebedsurfaceisthroughlinkageseatandareciprocatingleverconnected,sothisisalsosothebedsurfaceforbackwardmovement,whentherockerupwardmovement,duetothetensionspringdrive,thebedsurfacewillmoveforward.
5、Specification
6、Installationandcautions
1)Onthebasisofdrawing,reservedanchorscrewholesorpouringgoodfoundationplate,drilling,holeexpansion,theconstructionofconcretefoundation.
2)Theshakerframeplacedonthebasis,makeeachplace,calibrationandpadframebeamlevel.
3)TheDepartmentofanchorscrewstightening,thecradleisfixedonthebasisof.
4)Mountedonthedragdevice,bedsurface,bedsideandbedandthebedsurfaceconnectingrod,attentionshouldbetothefronttobedsideflywheel.
5)Connecttheswitchofthemotorinsurance,checkwhetherthemotorleakage,andthengoodmotorwire.
6)Thebedsurfaceisnotstrongbeat,collision;notinhightemperatureandheavypressure;avoidoil
pollutionandsunandrain,preventdegeneration.
7)Aftertheinstallation,adetailedexamination,theconfirmation,removalofequipmentandsurroundingsundries.
8)Rollerwith10-20Goil,nottosplashaswell.Theseatslidingrackinjectionoiltodrowntheslidingbearingandthelowerbearingcontactfit;levertyperockingframebearinghasbeenmanufacturedwithgoodlithiumgrease.
9)Putthewashingwaterairmachinetestmachineoperation,observationandexamination:
startingandoperation,themovingpartsarenotloosefeverorunusualsounds.
10)Emptytestmachinetonormal,canloadtestmachine,accordingtotheselectedminerals,inspectionandadjustmentofthestroke,stroke,springs,bedlongitudi
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 英文 产品说明书