电气安装工程电气管线敷设施工工艺
电气安装工程
(HFWX²QB/1-6-001-2004)
(一)硬质阻燃塑料管(PVC)明敷设施工工艺标准................................5
4.2一般项目.................................................................9
4.3允许偏差项目.............................................................9
7.1阻燃型(PVC)塑料管及其附件检定测试报告单和产品出厂合格证。
.............10
7.3设计变更洽商记录、竣工图。
..............................................10
(二)硬质阻燃型塑料管(PVC)暗敷设.........................................11
2、施工准备.................................................................11
2.1材料要求................................................................11
2.2主要机具................................................................11
2.3作业条件................................................................12
3.1工艺流程................................................................12
3.2弹线定位................................................................12
3.3加工管弯................................................................12
3.4稳埋盒、箱..............................................................13
3.5暗敷管路................................................................14
3.6扫管穿带线..............................................................15
4、质量标准.................................................................15
(三)钢管敷设施工工艺标准.................................................17
3.6.1稳注盒、箱:
..........................................................20
3.6.2托板稳注灯头盒:
......................................................20
3.7.1管路连接方法:
........................................................20
3.7.2管与管的连接..........................................................21
3.7.3管进盒、箱连接:
......................................................21
4、质量标准.................................................................25
4.1主控项目................................................................25
4.2一般项目................................................................25
4.3允许偏差项目............................................................26
(四)硬母线安装施工工艺标准................................................29
3.6.1母线的焊接:
..........................................................31
3.6.2母线的螺栓连接:
......................................................31
4.1主控项目:
..............................................................35
4.2一般项目................................................................35
4.3母线安装的允许偏差、弯曲半径和检验方法应符合表2-18规定................36
6.1母线安装应注意的质量总是见表2-19。
....................................37
(五)塑料线槽配线安装施工工艺标准..........................................38
4.1主控项目................................................................41
4.2一般项目................................................................41
4.3允许偏差项目............................................................42
(六)管内穿线绝缘导线安装施工工艺标准......................................43
3.1工艺流程................................................................44
3.2选择导线................................................................44
3.3清扫管路................................................................44
3.4穿带线..................................................................45
3.5放线及断线..............................................................45
3.6导线与带线的绑扎........................................................45
3.7管内穿线................................................................46
3.8导线连接................................................................46
3.8.1导线连接的要求:
......................................................46
3.8.2剥削绝缘使用工具及方法:
..............................................46
3.8.3单芯铜导线的直线连接:
................................................47
3.8.4单芯铜线的分支连接:
..................................................47
3.8.5多芯铜线直接连接:
....................................................47
3.8.6多芯铜导线分支连接....................................................48
3.8.7铜导线在接线盒内的连接:
..............................................48
3.8.8套臂压接:
............................................................50
导线与平压式接线柱连接:
.............................................51
导线与针孔式接线桩连接(压接):
......................................51
3.9线焊接..................................................................51
3.10导线包扎...............................................................52
3.11线路检查及绝缘摇测.....................................................52
4、质量标准.................................................................52
4.2一般项目................................................................53
(七)封闭插接母线安装施工工艺标准..........................................55
3.1工艺流程................................................................56
3.2设备点件检查............................................................56
3.3支架制作和安装应按设计和产品技术文件的规定制作和安装,如设计和产品技术文件无
规定时,按下列要求制作和安装;..............................................56
3.4封闭式母线的安装........................................................57
3.5试运行验收..............................................................57
4.1主控项目................................................................58
4.2一般项目................................................................58
4.3允许偏差项目见表2-20..................................................58
(八)电缆敷设施工工艺标准..................................................59
2、施工准备.................................................................60
2.1设备及材料要求..........................................................60
2.2主要机具................................................................60
2.3作业条件................................................................60
3、操作工艺.................................................................61
3.1工艺流程................................................................61
3.2准备工作................................................................61
3.3直埋电缆敷设............................................................62
3.4电缆沿支架、桥架敷设....................................................62
3.5挂标志牌................................................................63
4.1主控项目................................................................63
4.2一般项目................................................................63
4.3电缆最小弯曲半径和检验方法应符合表2-1的规定。
.........................63
7.1质量保证资料............................................................65
7.2施工记录................................................................65
(一)硬质阻燃塑料管(PVC)明敷设施工工艺标准
l、范围
本工艺标准适用于室内或有酸、碱等腐蚀介质的场所照明配线敷设安装(不得在40℃以上易受机械冲击、碰撞摩擦等场所敷设)。
2、施工准备
2.1材料要求
2.1.1凡所使用的阻燃型(PVC)塑料管,其材质均应具有阻燃、耐冲击性能,其氧指数不应低于27%的阻燃指标,并应有检定检验报告单和产品出厂合格证。
2.1.2阻燃型塑料管、其外壁应有间距不大于lm的连续阻燃标记和制造厂厂标.管里外应光滑,无凸棱、凹陷、针孔、气泡;内外径尺寸应符合国家统一标准,管壁厚度应均匀一致。
2.1.3所用阻燃型塑料管附件及明配阻燃型塑料制品,如各种灯头盒、开关盒接线盒、插座盒、管箍等,必须使用配套的阻燃型塑料制品。
2.1.4粘合剂必须使用与阻燃型塑料管配套的产品。
粘合剂必须在使用限期内使用。
2.2主要机具
2.2.1铅笔、皮尺、水平尺、卷尺、尺杆、角尺、线坠、小线、粉钱袋等。
2.2.2手锤、錾子、钢锯、锯条,刀锯、半圆锉、活扳子、灰桶、水桶等。
2.2.3弯管弹簧(简称弯簧)、剪管器,手电钻、钻头.压力案子、台钻等。
2.2.4电锤.热风机、电炉子、开孔器、绝缘手套.工具袋工具箱、煨管器,高凳等。
2.3作业条件
2.3.1配合混凝土结构施工时,根据设计图在梁、板、柱中预下过管及各种埋件。
2.3.2在配合砖结构施工时,预埋大型埋件、角钢支架及过管。
2.3.3在装修前根据土建水平线及抹灰厚度与管道走向,按设计图进行弹线浇注埋件及稳装角钢支架。
2.3.4喷浆完成后,才能进行管路及各种盒、箱安装,并应防止管道污染。
3、操作工艺
3.1工艺流程
预制支、吊架铁件及管弯→测定盒箱及管路固定点位置→管路固定→管路敷设→管路入盒箱→变形缝做法
3.2按照设计图加工好支架,吊架、抱箍、铁件及管弯。
预制管弯可采用冷煨法和热煨法。
3.2.1阻燃塑料管敷设与煨弯对环境温度的要求如下:
阻燃塑料管及其配件的敷设,安装和煨弯制作,均应在原材料规定的允许环境温度下进行,其温度不宜低于-15℃。
3.2.2冷煨法:
管径在25mm及其以下可以用冷煨法。
(1)使用手扳弯管器煨弯,将管子插人配套的弯管器内,手扳一次煨出所需的弯度。
(2)将弯簧插入(PVC)管内需煨弯处,两手抓住弯簧两端头,膝盖顶在被弯处,用手扳逐步煨出所需弯度,然后抽出弯簧(当弯曲较长管时,可将弯簧用铁丝或尼龙线拴牢上一端,待煨完弯后抽出)。
(3)热煨法:
用电炉子、热风机等加热均匀,烘烤管子偎弯处,待管被加热到可随意弯曲时立即将管子放在木板上,固定管子一头,逐步煨出所需管弯度,并用湿布抹擦使弯曲部位冷去定型,然后抽出弯簧.不得因煨弯使管出现烤伤、变色、破裂等现象。
3.3测定盒、箱及管路固定点位置
3.3.1按照设计图测出盒、箱、出线口等准确位置。
测量时,应使用自制尺杆,弹线定位。
3.3.2根据测定的盒、箱位置,把管路的垂直点水平线弹出,按照要求标出支架、吊架固定点具体尺寸位置。
3.4管路固定方法
3.4.1胀管法:
先在墙上打孔,将胀管插人孔内,再用螺丝(栓)固定。
3.4.2木砖法:
用木螺丝直接固定在预埋木砖上。
3.4.3预埋铁件焊接法:
随土建施工,按测定位置预埋铁件.拆模后.将支架、吊架焊在预埋铁件上。
3.4.4稳住法;随上建砌砖墙,将支架固定好。
3.4.5剔注法:
按测定位置,剔出墙洞(洞内端应剔大些)。
用水把洞内浇湿,
再将合好的高标号砂浆填入洞内、填满后,将支架、吊架或螺栓插人洞内、校正理人深度和平直,无误后,将洞口抹平。
3.4.6抱箍法.按测定位置,遇到梁柱时,用抱箍将支架.吊架固定好。
3.4.7无论采用何种固定方法,均应先固定两端支架、吊架,然后拉直线固定中间的支架、吊架。
3.5管路敷设
3.5.1断管:
小管径可使用剪管器、大管径使用钢锯锯断,断口后将管口锉平齐。
3.5.2敷管时,先将管卡一端的螺丝(栓)拧紧一半,然后将管敷设于管卡内,逐个拧紧。
3.5.3支架、吊架位置正确、间距均匀、管卡应平正牢固;埋人支架应有燕尾,埋人深度不应小于120mm,用螺栓穿墙固定时,背后加垫圈和弹簧垫用螺母紧牢固。
3.5.4管水平敷设时,高度应不低于2m,垂直敷设时,不低于1.5m(1.5m以下应加保护管保护)。
3.5.5管路较长敷设时,超过下列情况时,应加接线盒;
(1)管路无弯时,30m;
(2)管路有一个弯时,20m;
(3)管路有二个弯时,15m;
(4)管路有三个弯时;8m;
(5)如无法加装接线盒时,应将管直径加大一号。
3.5.6支架、吊架及敷设在墙上的管卡固定点及盒,箱边缘的距离为150~300mm,管路中间距离见表3-1所示。
3.5.7配线与管道间最小距离见表3-2所示。
管路中间固定点间距
表3-1
配线与管道单间最小距离
表3-2
注:
1)表2)达不到表中距离时,应采取下列措施:
(1)蒸汽管——在管外包隔热层后,上下平行净距可减至200mm。
交叉距离须考虑便于维修,但管线周围温度应经常在35℃以下。
(2)暖、热水管——包隔热层。
3.5.8管路连接:
(1)管口应平整光滑;管与管、管与盒(箱)等器件应采用插人法连接,连接处结合面应涂专用胶合剂,接口应牢固密封。
(2)管与管之间采用套管连接时。
套管长度宜为管外径的1.5~3倍,管与管的对口应位于套管中处对平齐。
(3)管与器件连接时,插入深度宜为管外径的1.1~1.8倍。
3.5.9管路敷设:
(1)配管及支架、吊架应安装平直、牢固、排列整齐、管子弯曲处、无明显折皱、凹扁现象。
(2)弯曲半径和弯扁度应符合规范规定。
,补偿装置接头的大头与直管套入并粘牢,另一端(PVC)管套上一节小头并粘牢。
然后将此小头一端插入卡环中,小
头可在卡环内滑动。
补偿装置安装示意图。
(PVC)管引出地面一段,可以。
使用一节钢管引出,需制做合适的过渡专用接箍,并把钢管接箍埋在混凝土中,钢管外壳做接地或接零保护。
(PVC)管与钢管连接。
3.6管路入盒、箱一律采用端接头与内锁母连接,要求平整、牢固。
向卜方管管口采用端帽护口,防止异物堵塞管路。
3.7
4
、质量标准
4.1主控项目
阻燃型塑料管及其附件材质应符合规定;阻燃型塑料管不得在室外高温和易受机械损伤声场所明敷设。
检查方法:
检查测试资料,观察检查。
4.2一般项目
4.2.1管路连接时,使用胶粘剂连接紧密、牢固;配管及其支架、吊架应平直、牢固、排列整齐;管子弯曲处,无明显折皱、凹扁现象。
4.2.2盒、箱设置正确,固定可靠,管子插人盒,箱时,应用粘结剂,粘接严密、牢固。
采用端接《与内锁母时,应拧紧盒壁不松动。
检查方法:
观察和尺量检查。
4.2.3管路保护应符合以下规定:
穿过变形缝处有补偿装置,补偿装置能活动自如;穿过建筑物和设备基础处,应加保护管;补偿装置平正,管口光滑、内锁母与管子连接可靠;加套保护管在隐蔽工程纪录中标示正确。
检查方法:
观察检查和检查隐蔽工程记录。
4.3允许偏差项目
硬质(PVC)塑料管弯曲半径安装的允许偏差和检验方法应符合表3-3规定。
硬质塑料管(PVC)安装保护管弯曲半径允许偏差和检验方法
表3-3
注:
D为管子外径。
5、成品保护
5.1敷设管路时,保持墙面、顶棚、地面的清洁完整。
修补铁件油漆时,不得污染建筑物;
5.1.1施工用高凳时,不得碰撞墙、角、门、窗;更不得靠墙面立高凳;高凳脚应有包扎物。
既防划伤地板,又防滑倒。
5.1.2搬运物件及设备时不得砸伤管路及盒、箱。
6、应注意的质量问题
6.1套箍偏中,有松动,插不到位,胶粘剂抹得不均匀,应用小刷均匀涂抹配套供应的胶粘剂。
插入时用力转动插入到位。
6.2大管煨弯时,有凹扁、裂痕及烤伤、烤变色现象。
因烤烘面积小,加热不均匀,应灌砂用电炉间接烤或用水烤。
面积要大,热要均匀,并有型具一次煨成。
6.3管路敷设出现垂直与水平超偏、管卡间距不