OverallConstructionScheme......................................................................7
5.2施工程序
ConstructionProcedures..............................................................................8
5.3定位放线、高程控制
PositioningandPay-offandElevationControl...........................8
5.4土方开挖
Earthexcavation............................................................................................9
5.5截桩头
Breakingthepiles.......................................................................................10
5.6垫层施工
Leanconcrete.......................................................................................................10
5.7脚手架工程.................................................................................................10
5.8钢筋工程
Rebar......................................................................................................................12
5.9模板工程Formwork........................................…...............................................................16
5.10混凝土工程Concreting.......................................................................................................19
5.11预留孔及设备基础二次灌浆Grouting..............................................................................................................27
5.12土方回填
Backfill.............................................................................................................27
6、质量标准及要求
Qualitystandard&
requirement...............................29
7、安全文明施工
Safeandcivilizedconstruction..........................29
附图一燃机基础施工平面布置图
Atech1:
constructionlayout
附表一燃机基础施工进度横道图
Atech2:
constructionprogressplan
ProjectOverviewandFieldConditions
1.1工程概况
ProjectOverview
赫维利1230MW燃气联合循环电站项目将包括两个燃气轮机余热锅炉,和一个汽轮机,装机容量1230MW。
该电站使用再气化液化天然气(RLNG)作为主要燃料,使用高速柴油(HSD)作为备用燃料油。
生产的电力将通过500kV电网近距离输送。
电厂距离TobaTekSingh47公里,毗邻TS(Trimmu-Sidhnai)运河。
项目地点距离铁路线约5.5公里。
TheHaveliBahadurShahCombinedCyclePowerPlantwillcompriseoneblockwithtwogasturbines,twoHRSGs,andonesteamturbineinamultishaftarrangement.Theelectricalgrosspoweroutputwillbe1230MWatISO.ThepowerplantwillbefiredwithRe-gasifiedLiquefiedNaturalGas(RLNG)asmainfuelandhighspeeddiesel(HSD)oilasback-upfuel.Theelectricpowerwillbeevacuatedviathe500kVgridinclosedistancetotheplant.Thesiteislocatedabout47kmfromTobaTekSinghandisadjacenttoTS(Trimmu-Sidhnai)LinkCanal.Railwaylineisapproximately5.5kmfromthesite.
1.1.2燃机基础布置于联合厂房房区域轴线4~5轴交H~G轴之间,南北向长41.14m,东西向宽10.1m,南侧长15.552m厚度为7.3m,北侧25.588m厚度为2.8m,呈阶梯型布置,基底标高-2.8m。
ThegasturbinefoundationisarrangedintheGT&
STcombinehallareaAxis4-5/H-GAxis,41.14mlongfromsouthtonorth,and10.1mwideineast-westdirection,withlengthof15.552mandwidthof10.1m,thicknessis7.3m.Andwithlengthof25.588mandthicknessof2.8monthenorthernside,itisarrangedinaladdertypewiththefoundationelevationof-2.8m.
1.1.3燃机基础承载在23根直径800的钢筋混凝土灌注桩上,整个基础砼强度C50,垫层C20素混凝土;
基底砼保护层为75mm,其它部分为40mm;
钢筋采用ASTMA615MGR60,FY=420MPa;
直径大于16的均为螺纹钢。
本工程±
0.00m相当于当地高程系统147.85m。
Thegasturbinefoundationiscarriedonthebasisof23reinforcedconcretepilewithdiameterof800.AndtheentireconcretestrengthoffoundationisC50,withC20cushionplainconcrete.Theconcretesubstrateprotectivelayeris75mmwhiletheotherpartis40mm.ThesteelrebarshallbeusingASTMA615MGR60,FY=420MPa,sizeoverΦ16shallbedeformedbar.and±
0.00mofthissystemisequivalentto147.85mofthelocalelevationengineeringsystems.
1.1.4基础设有大量的预留二次浇灌孔、买件,根据结构尺寸属于大体积混凝土。
IntheFoundation,thereisalotofreservingsecondgroutingholes,whichbelongstomassconcreteaccordingtostructureandsize.
MainQuantities
整个燃机基础混凝土浇筑方量约为660m3。
基础钢筋用量约110t。
Theconcretepouringvolumeforthewholegasturbinefoundationisabout660m3,whiletheamountofsteelrebaroftheFoundationisabout110t.
FieldConditions
目前燃机基础桩基,土方开挖,凿桩头处理施工完毕,可以进行地基平整、桩头的清理及垫层混凝土施工。
Atpresent,gasturbinepilefoundation,earthexcavation,cuttingpileheadhascompleted,andarereadytolevelthefoundation,cleanpileheadandconstructbeddingconcrete.
2、编制依据
Reference
2.1、混凝土结构工程施工质量验收规范(GB50204-2002);
TestStandardforAcceptanceofConcreteStructure(GB50204-2002)
2.2、建筑施工手册(第四版),施工计算手册(第二版);
ConstructionManual(FourthEdition),ConstructionCalculationManual(SecondEdition);
2.3、燃机基础施工图F09221S-T0218;
WorkingDrawingofGasTurbineFoundationF09221S-T021;
2.4、大体积混凝土施工规范(GB50496-2009);
ConstructionSpecificationofMassConcrete(GB50496-2009)
2.5、电力建设施工质量验收及评定规程(第1部分:
土建工程DL/T5210.1-2005);
QualityAcceptanceandEvaluationProceduresofElectricPowerConstruction(Part1:
CivilEngineeringDL/T5210.1-2005)
2.6、《建筑工程施工质量验收统一标准》GB50300-2001;
"
ConstructionQualityAcceptanceUnifiedStandard"
GB50300-2001;
2.7、《施工现场临时用电安全技术规范》JGJ46-2005;
SafetyRegulationsonTemporaryElectricityUtilizationonConstructionSite(JGJ46-2005)
2.8、《电力建设安全工作规程》DL5009.1-2002;
SpecificationforSafetyOperationofElectricPowerConstruction(DL5009.1-2002)
2.9、主要设备、材料、机械的技术文件和性能资料。
Equipment,Materials,TechnicalDocumentsandPerformanceDataofMachinery
2.10、工程的标书、合同。
BidingDocumentandContractoftheProject
2.11、施工综合进度。
ConstructionSchedule
2.12、类似工程的施工方案及工程技术总结。
ConstructionSchemeandEngineeringTechnologySummaryofSimilarProjects
3、作业准备和条件
ProjectPreparationandConditions
3.1技术准备
TechnicalPreparation
3.1.1做好预埋件和预留孔洞图纸审查工作,以确保每个埋件或孔洞平面定位尺寸及高程与图纸标注一致。
Checktheembeddedpartsandreservedholeofthefoundation,toensurethatthesizeandelevationofplanarpositioningofeachpartorholeisthesameasthemarksonthedrawings.
3.1.2做好工程技术交底工作,让所有参与施工人员了解、熟悉规范,工程特点和施工部署。
Ensureengineeringdisclosureisgoingverywell,sothatallconstructionpersonnelcanunderstandandbecomefamiliarwiththespecifications,characteristicsandarrangementofthisconstruction.
3.1.3作业人员应具有施工经验,特殊工种作业人员(电焊工、起重工、电工、架子工)必须经过专业培训和考试,持有效证件上岗。
Constructionteammusthaveprofessionalexperience.Workersinvolvedinspecialtypeofwork()shallpossessrequiredworkpermitsthroughprofessionaltrainingandexamination.
3.2人员配备
Staffing
燃机基础施工人员配备见表3-1
RefertoTable3-1forGasturbineFoundationManningTable
表3-1人员配备表
Table3-1Manningtable
项目负责人
Projectmanager
1人
1person
钢筋工
SteelBender
10人
10People
技术员
Technician
木工
Woodworker
8人
8People
施工员
ConstructionCrew
2人
2People
混凝土工
Concreter
质检员
QualityManager
1人
电工
Electrician
2people
安全员
HSEManager
电焊工
Welder
3人
3people
测量员
Surveyor
普工
Worker
4人
4people
3.3机械及工器具配备
Tools&
Machinery
机械和工器具配备见表3-2
RefertoTable3-2forToolsandmachinery
表3-2机械及工器具的配备表
Table3-2ToolsandMachinery
名称
Name
数量
Quantity
钢筋切断机
RebarCutter
1台1piece
全站仪TotalStation
钢筋弯曲机
RebarBender
水平仪Gradienter
圆盘锯
CircularSaw
2台2pieces
钢卷尺(50m)
SteelTape(50m)
手电锯
HandChainsaw
角磨机
AngleGrinder
4台4pieces
手电钻
ElectricHandDrill
振捣棒
VibratingNeedle
10台10pieces
冲击电锤
ImpactHammer
振动电机
vibrationmotor
8台8pieces
电焊机
ElectricWeldingMachine
3台3pieces
20t汽车吊
20tTruckCrane
1台
1set
潜水泵
SubmersiblePump
10t平板车
1台
电子测温仪
ElectronicThermometer
1套1set
10t振动碾
混凝土搅拌车
ConcreteMixer
8台8sets
垂直振动夯机
2台
2sets
1t振动碾
1tVibro-Roller
47m混凝土汽车泵车
36m混凝土汽车泵车
36mConcretePumpTruck
1台1set
3.4物资材料供应
MaterialSupply
表3-3拟投入的主要材料和周转材料使用计划
Table3MainMaterialsandRevolvingMaterialsUsePlan
序号No.
材料名称Name
单位Unit
数量Quantity
1
钢筋rebar(steel)
t
110
2
商品混凝土
concrete(c30concrete)
m3
660
3
φ48×
3.5钢管
steeltubularscaffold
50
4
扣件couplers
个PCS
10000
5
2440×
1220×
18模板
template(playwood)
m2
500
6
50×
100木方wooden
M3
7
木跳板woodboard
块PCS
200
8
黑心棉
insulationcotton
600
3.5力能供应
ForceandEnergySupply
3.5.1施工水源
WaterSource
施工生产用水的施工水源,按甲方指定的位置引接施工用水,主管管径选DN50mm,支管采用DN25mm,埋地敷设。
Theproductionwaterweusecomesfromtheplacethat