《预应力施工检验试验计划ITPWord下载.docx》由会员分享,可在线阅读,更多相关《预应力施工检验试验计划ITPWord下载.docx(41页珍藏版)》请在冰豆网上搜索。
批准
Approved
总包
Contractor
业主/监理
Owner/Supervision
修改说明
Description
提交供审核
ForApproval
Item
项目
Inspection&
Testing
检查和检验
ReferenceCodes,Standards,Specifications(Min.RequirementforInspectionandTesting)
参考法规、标准、规范(检查和检验的最低要求)
AcceptanceCriteria
验收标准
InspectionFrequency
检验频率
Interventionpoints检验点
SC
CO
SV
CL
LA
Remark
备注
1
Approvals-批准
1.1
预应力混凝土墙体施工方案MSforPCWall
HNLNG-MS-HXCC-0026MSforPCWall墙体施工方案
BeforeCommenceofPCWallConstruction墙体施工前
W
R
1.2
DrawingsHandOver图纸交底
—
2
PCWallConstruction墙体施工
2.1
RebarFabrication钢筋加工
2.1.1
钢筋加工检验
RebarFabricationinspection
GB50204-2011
GB50204-20115.2.4
AllInspection
全数检查
H
RI
2.1.2
GB50204-20115.3.1
nolessthan3piecesforthesamerebarandequipementinoneworkshift
按每工作班同一类型钢筋、同一加工设备抽查不应少于3件
2.1.3
GB50204-2011table5.3.4±
10
2.1.4
20
2.2
钢筋安装RebarInstallation
2.2.1
钢筋安装检验
RebarInstallationinspection
GB50204-20115.4.1
2.2.2
GB50204-20115.5.1
2.2.3
GB50204-20115.4.3
2.2.4
GB50204-20115.4.6
typical10%
有代表性的自然抽查10%
2.2.5
GB50204-2011table5.5.2±
10mm
2.2.6
2.2.7
GB50204-2011table5.5.220mm
2.2.8
Clause2.2.1-2.2.6
2.2.9
DD-SPC-TK-CV-02-0008
DD-SPC-TK-CV-02-0008Table-6.4-150/40mm(+10mm)
typical10%有代表性的自然抽查10%
2.2.10
机械接头安装检验
MechanicalCouplerInstallationinspection
JGJ107-2010
JGJ107-2010Table6.2.1200N·
m(Dia=20mm)260N·
m(Dia=25mm)320N·
m(Dia=32mm)
2.2.11
JGJ107-2010Clause6.2.1thetypicalmechanicalcouplernomorethe2Pissuitable对于标准型接头安装不宜超过2P
AllVisualInspection
2.2.12
钢筋验收RebarInspection
GB50204-2011,JGJ107-2010&
Clause2.2.1-2.2.10
2.3
预埋件安装EmbeddedPlatesInstallation
2.3.1
EmbeddedPlatesatOuterWall外墙预埋件
BD-SPC-TK-CV-02-0008
BD-SPC-TK-CV-02-0008table13.3±
20mm
2.3.2
竖向埋件verticalembeddedplate
10mmmm
2.3.3
BD-SPC-TK-CV-02-0008table13.3+0,-1mminamin
50mmdistance最少
50mm内+0,-1mm
2.3.4
水平埋件horizontalembeddedplate
15mm
2.3.5
水平埋件horizotalembeddedplate
2.4
预应力安装Pre-stressingInstallation
2.4.1
Pre-stressingInstallation预应力安装
BD-SPC-TK-CV-02-0009
BD-SPC-TK-CV-02-0009Clause8.3±
20mm
AllInspection全数检查
2.4.2
BD-SPC-TK-CV-02-0009Clause7.8±
2.4.3
BD-SPC-TK-CV-02-0009Clause7.8noexeed20mminany2mlength任意2米内不超过20mm
2.4.4
BD-SPC-TK-CV-02-0009Clause7.8curvedductsshallfollowsmoothandcontinouscurves弧形管道应当圆顺且连续
AllvisualInspection
全数目视检查
2.4.5
BD-SPC-TK-CV-02-0009Clause6.6coversshallbefittedtotheendofallinstalledducts'
end.在所有已安装的管道末端覆盖/堵塞
2.4.6
Pre-stressingInstalltion预应力安装
BD-SPC-TK-CV-02-0009Clause7.4Allthejointsshallbesealedwithtapemastictopreventtheentryofcementmortar所有的接头都应被胶套密封以免水泥浆进入
2.4.7
BD-SPC-TK-CV-02-0009Clause8.4ensurethatthereishardenedconcreteadheringtoanchorageandgroutholeintheanchorageisnotblocked.确保锚座被坚硬的混凝土包裹且灌浆孔不会堵塞
2.4.8
Noblock无堵塞
2.5
模板安装FormworkInstallation
2.5.1
DOKAformworkassemblydrawingsDOKA装配图纸
MeettheDOKAformworkassemblydrawingsrequirements
满足DOKA装配图要求
AllInspection/VisualInspection全数检查/目视检查
2.5.2
2.5.3
MSforPCWall
MSforPCWallClause5.6.3
2.5.4
2.5.5
MSforPCWallClause5.6.6
AllInspection/Pre-concretingInspection,ConcretingInspection,Post-concretingInspection
全数检查/混凝土浇筑前、浇筑中、浇筑后的检查
2.5.6
Concretestrengthshouldnotlessthan10Mpabeforeclimbing,tighteningthefixingnutwithreversibleratchet1/2"
andboxnut41.爬升前混凝土强度不小于10Mpa
用棘轮扳手拧紧爬升锥螺母
2.5.7
GB50204-20114.2.1
2.5.8
GB50204-20114.2.2
2.5.9
GB50204-20114.2.3
2.5.10
GB50204-2011Table4.2.76mm
2.5.11
GB50204-2011Table4.2.7+4,-5mm
2.5.12
GB50204-2011Table4.2.75mm
2.5.13
GB50204-2011andDOKAworkingdrawingsDOKA施工图纸
Clause2.5.1-2.5.7
2.6
Concreteconstruction混凝土施工
2.6.1
GB50204-20117.4.5
2.6.2
BD-SPC-TK-CV-02-0006&
BSEN206-1
BD-SPC-TK-CV-02-0006Clause9.2&
BSEN206-1,table17&
19nomorethan5.5%不超过5.5%
1sample/productiondaywhenstabilised稳定后一工作天一次
2.6.3
BD-SPC-TK-CV-02-0006
BD-SPC-TK-CV-02-00069.2(4)180±
30mm
atthesametimeofconcretecubesampling(onceeach100m³
)当混凝土试块取样时(每100m³
一次);
/whennecessary如果有需要
2.6.4
GB/T50080-2002standardfortestmethodofperformanceonordinaryfreshconcrete普通混凝土拌合物性能试验方法标准
500-700mm
2.6.5
BD-SPC-TK-CV-02-00089.3(17)0-30℃
2.6.6
ConcreteConstruction混凝土施工
MSforPCWall
MSforPCWallClause5.9.2
2.6.7
GB50204-20117.4.1checkingconstructionrecord
检查施工记录
every100m3onesamplingwithin1000m3在1000立方内每100m3取样一次onesamplingshouldbenolessthan6cubics.Additionalgroupswillbemadeaccordingtositerequirement
每一次取样不少于6个试块,额外的试块将根据现场需要确定
2.6.8
GB50204-20117.4.4visualinspectionandcheckingconstructionrecord
观察,检查施工记录
2.6.9
BD-SPC-TK-CV-02-0006Clause8.4thetimebetweendeparturefromtheplantandtheendofplacingnoexceed90