《广联达培训楼工程量计算Word文件下载.docx》由会员分享,可在线阅读,更多相关《广联达培训楼工程量计算Word文件下载.docx(26页珍藏版)》请在冰豆网上搜索。
(6-0.25×
0.5×
0.12×
2=1.1m3
②③2JL3
(2):
[(3.3-0.25-0.2)+(2.1-0.25-0.2)]×
0.4×
0.2×
2=0.816m3
AC2JL1(3):
[(3.3-0.25-0.2)×
2(4.5-0.2-0.2)]×
2=1.96m3
BJL4(4.5-0.2-0.2)×
0.2=0.328m3
V梁=1.1+0.816+1.936+0.328=4.204m3
V总25.128+4.204=29.332m3
基础模板:
m2
V=(11.6+0.25×
2+6.5+0.25×
0.2=7.64m2
梁的模板:
①④2JL2
(1):
2=4.4m2
2=4.08m2
2=7.84m2
2=1.64m2
S=4.4+4.08+7.84+1.64=17.96m2
C30砼框架柱(-1.2~±
0.00):
4Z1=0.5×
4=1.2m3
4Z2=0.5×
4=0.96m3
2Z3=0.4×
2=0.384m3
C30砼框架柱的总体积=1.2+0.96+0.384=2.544m3
C25砼框架柱(±
0.00~7.17):
7.17×
4=7.17m3
4=5.736m3
2=2.2944m3
C25砼框架柱的总体积=7.17+5.736+2.2944=15.2004m3
框架柱的模板(-1.2~7.17):
4×
(1.2+7.17)×
4=66.96m2
4Z2=(0.5+0.4)×
4=60.264m2
2=26.784m2
小计:
66.96+60.264+26.784=154.008
首层梁与柱交叉部分模板的面积:
4Z1=0.37×
4=1.48m2
4Z2=(0.37×
2+0.24×
0.5)×
4=1.96m2
2Z3=0.24×
3×
2=0.72m2
1.48+1.96+0.72=4.16m2
二层梁与柱交叉部分模板的面积:
0.65×
4=1.924m2
4=2.404m2
4=0.72m2
1.924+2.404+0.72=5.048m2
框架柱的模板=154.008-4.16-5.048=144.8m2
C25砼女儿墙构造柱:
4Z–=(0.24×
0.24×
0.54+0.24×
0.03×
0.54×
4=0.156m3
4Z∟=(0.24×
V总=0.156+0.156=0.312m3
模板的面积:
4Z–=(0.24+0.006×
4=1.555m2
4Z∟=(0.24+0.006)×
4+0.006×
S总=1.555+1.555=3.11m2
3.57mC25砼框架梁m3
①④2KL2
(1):
0.37×
2=1.628m3
②③2KL4
(2):
2-0.4)×
2=0.979m3
A2KL3(3):
(11.1-0.25×
2-0.4×
0.4=1.4504m3
C2KL1(3):
BKL5
(1):
(4.5-0.2×
0.4=0.394m3
1.628+0.979+1.4504+1.4504+0.394=5.901m3
模板:
(0.5+0.4+0.37)×
2=13.97m2
(0.4+0.4+0.24)×
2=10.608m2
2)=12.446m2
BKL5
(1)(0.4+0.4+0.24)×
2)=4.264m2
13.97+10.608+12.446+12.446+4.264=53.734m2
7.17mC25砼框架梁:
0.55×
2=2.2385m3
0.55=1.9943m3
0.4=0.3936m3
2.2385+0.979+1.9943+1.9943+0.3936=7.599m3
(0.65+0.55+0.37)×
2=17.27m2
2)=15.386m2
17.27+10.608+15.386+15.386+4.264=62.914m2
C25砼框架梁m3V总=5.901+7.5999=13.5009m3
框架梁的模板m2S总=53.734+62.914=116.648m2
3.57mC25砼平板:
V1=11.6×
6.5×
0.1=7.54m3
楼梯间=(4.5-0.12×
(2.1-0.12×
0.1=0.792m3
柱=(0.5×
4)+(0.5×
4)+(0.4×
2)=0.212m3
V=7.54-0.792-0.212=6.536m3
2S1=(3.3-0.12×
(6-0.12×
2=35.2512m2
S2=(4.5-0.12×
(3.9-0.12×
2)=15.5916m2
35.2512+15.5916=50.8428m2
7.17mC25砼平板:
柱:
(0.5×
V=7.54-0.212=7.328m3
S3(4.5-0.12×
2)=7.9236m2
35.2512+15.5916+7.9236=58.7664m2
C25m3V总=6.536+7.328=13.864m3
平板模板m2S总=50.8428+58.7664=109.6092m2
C25砼阳台平板m3
V=4.56×
0.1=0.5472m3
模板
S=4.56×
1.2=5.472m2
C25砼拦板m3
L=(1.2-0.03)×
2+(4.5-0.03×
2)=6.84m
V=6.84×
0.06×
0.9=0.37m3
S=6.84×
0.9×
2=12.312m2
挑檐:
底板V=(11.6+0.6×
2+6.5)×
0.6×
0.1+4.56×
0.1=2.5896m3
上卷V=[11.6+0.6×
2+6.5+(0.6-0.06)×
0.2+0.6×
2=0.504m3
V总=2.5896+0.504=3.0936m3
S=3.0936m2
C25砼楼梯(按水平投影面积算):
S=(1.02-0.12+2.43+0.24)×
(0.99×
2+0.12-0.12×
2)=6.6402m2
模板m2
S=6.6402
C25砼平台m3
V=(1.05-0.12-0.24)×
0.1=0.128m3
S=(1.05-0.12-0.24)×
2)=1.28m2
C25砼预制过梁m3
GL24M—1:
(2.4+0.5)×
0.37=0.258m3
GL124M—2:
(0.9+0.5)×
4=0.161m3
GL122M—3:
(0.9+0.5)×
2=0.081m3
GL188C—1:
(1.5+0.5)×
0.18×
8=1.066m3
GL182C—2:
(1.8+0.5)×
2=0.306m3
GL24MC—1:
过梁安装:
0.258+0.161+0.081+1.066+0.306+0.258=2.13m3
预制过梁制作:
2.13×
1.015=2.162m3
预制过梁运输:
2.162m3
模板S=2.162m2
M5水泥砂浆砌砖基础(-1.000~±
0.000):
L外=(11.1-0.25×
2)×
2+(6-0.25×
2=30.6m
L内=(6-0.25×
2-0.4)×
2+(4.5-0.2×
2)=14.3m
V外=30.6×
0.365×
1=11.169m3
V内=14.3×
1=3.432m3
V砖基=11.169+3.432=14.601m3
M5混合砂浆砌砖墙(±
0.000~7.17m):
首层3.57m:
V外1=30.6×
(3.57-0.5)=34.29m3
V内1=14.3×
(3.57-0.5)=10.54m3
4C—1=1.5×
1.8×
4=3.94m3
C—2=1.8×
0.365=0.99m3
M—1=2.4×
2.7×
0.365=2.37m3
2M—2=0.9×
2.4×
2=1.04m3
M—3=0.9×
2.1×
0.24=0.45m3
V外=34.29-3.94-0.99-2.37=26.99m3
V内=10.54-1.04-0.45=9.05m3
二层7.17m:
V外2=30.6×
(7.17-3.57-0.65)=32.95m3
V内2=14.3×
(7.17-3.57-0.65)=10.64m3
V外=32.95-3.94-0.99-2.37=25.65m3
V内=10.64-1.04-0.45=9.15m3
首层和二层的外墙过梁=0.258+1.066+0.306+0.258=1.888m3
首层和二层的内墙过梁=0.161+0.081=0.242m3
V外=26.99+25.65-1.888=50.752m3
V外=9.05+9.15-0.242=17.958m3
M5混合砂浆砌女儿墙:
L=(11.6+6)×
2=35.2m
女儿墙构造柱的体积=0.312m3
V=35.2×
0.54-0.312=4.25m3
C25砼压顶m3
0.3×
0.006=0.63m3
模板:
S=0.63m2
基础的墙拉筋A6@500(h=1m)
外墙L=(1×
2+0.37-0.005+12.5×
0.006)×
16=76.8m
内墙L=(1×
2+0.24-0.05+12.5×
10=42.425m
基础的墙拉筋=76.84+42.425=119.265m
首层的墙拉筋(h=3.57-0.5=3.07m)
外墙AC轴
C—1、C—2窗上下墙拉筋:
L=(1×
2+0.37-0.05+12.5×
10=72.04m
C—1窗口处墙拉筋:
L1=[(0.9-0.25-0.025)×
0.006]×
4=19.815m
L2=[(0.9-0.2-0.025)×
4=21.015m
C—2窗口处墙拉筋:
2=14.408m
M—1门上墙拉筋:
1×
2=4.83m
M—1门口处墙拉筋:
L=[(1.05-0.2-0.025)×
5×
2=20.513m
①④轴L(1×
6×
4=57.63m
小计:
72.04+19.815+21.015+14.408+4083+20.513+57.63=209.224m
内墙:
m
7=95.393m
M—2、M—3上的墙拉筋:
3=6.814m
小计:
95.393+=102.207m
首层墙拉长筋=209.224+102.207=311.431m
二层的墙拉筋
外墙:
(h=7.17-3.57-0.65=2.95m)
C—1、C—2窗下墙拉筋:
10=48.025m
4=21.015m
MC—1窗下墙拉筋:
0.006)=4.803m
MC—1窗口处墙拉筋:
m
L1=[(1.05-0.2-0.025)×
0.006]×
2=12.308mL2=[(1.05-0.2-0.025)×
1=4.103m
AC轴墙拉筋L=(1×
20.37-0.05+12.5×
4=48.025m
48.025+19.815+21.015+14.408+4.803+12.308+4.103+48.025=172.502m
内墙:
(h=7.17-3.57-0.5=3.1m)
7=95.393m
M—2、M—3门上墙拉筋:
3=7.204m
二层的墙拉筋=172.502+95.393+7.204=274.709m
墙的总拉长筋=119.265+311.431+274.709=705.405m
吨数=705.405×
0.261÷
1000=0.184吨
M—1:
木门框的制作=(2.38+2.69)×
2=10.14m
安装=(2.38+2.69)×
木门扇的制作1.986×
2=3.972m2
安装1.986×
亮子的制作=1.986×
0.603=1.198m2
安装=1.986×
小五金:
65颌:
4个×
0.46100颌:
2.1
75插销:
1个×
75/65×
0.321个×
0.45暗插销:
2个×
15
75拉手:
0.45125拉手:
0.65
油漆=2.38×
2.69=6.402m2
木门运输=2.38×
门锁:
1把
4M—2
木门框的制作=(0.88+2.39)×
4=26.16m
安装=(0.88+2.39)×
木门扇的制作=0.786×
1.938×
4=4.396
安装=0.786×
亮子的制作=0.786×
4=1.148m2
2×
4=8个×
0.46100插销:
4=4个×
0.32插销:
0.45
油漆=0.88×
2.39×
4=8.413m2
木门运输=0.88×
4=4把
2M—3
木门框的制作=(0.88+2.09×
2=10.12m
安装=(0.88+2.09×
2.038×
2=3.204m2
100颌2×
2=4个×
2.1100插销1×
2=2个×
125拉手2×
2.09×
2=3.678m2
1×
2=2把
8C—1塑钢窗=1.5×
8=21.6m2
2C—2塑钢窗=1.8×
2=6.48m2
MC—1塑钢窗=1.5×
1.8=2.7m2;
塑钢门=0.9×
2.7=2.43m2
装饰装修:
地25A:
接待室m2
1、9.5厚硬实木复合地板
2、35厚C15细石砼随打随抹平
3、1.5厚聚氨酯涂膜防潮层(上卷150mm,门口300mm)
4、50厚C15C15细石砼随打随抹平
5、150厚3:
7灰土
6、素土夯实,压实系数0.90(素土厚度204mm)
接待室=(4.5-0.24)×
(3.9-0.24)=15.59m2
1、素土垫层=15.59×
0.204=3.18m3
2、150厚3:
7灰土垫层=15.59×
0.15=2.34m3
3、50厚C15细石砼找平=15.59m2
4、1.5厚聚氨酯涂膜防水(上卷150mm,门口300mm):
上卷=(4.26+3.66)×
0.15=2.376m2
门口=2.4×
0.15+0.9×
2+0.9×
0.15=0.765m2
防水=15.59+2.376+0.765=18.73m2
5、35厚C15细石砼找平=15.59m2
6、9.5厚硬实木复合地板:
0.185+0.9×
0.12=0.768m2
9.5厚硬实木复合地板=15.59+0.768=16.358m2
地9:
图形培训室、钢筋培训室m2
1、10厚铺地砖,细水泥浆擦缝
2、6厚建筑胶水泥砂浆粘结层
3、20厚1:
3水泥砂浆粘结层
4、素水泥结合层一道
5、50厚C10砼
6、150厚3:
7、素土夯实,压实系数0.90(素土厚度214mm)
图形培训室、钢筋培训室=(303-0.24)×
(6-0.24)×
2=35.25m2
1、素土垫层=35.25×
0.214=7.54m3
7灰土垫层=35.25×
0.15=5.29m3
3、50厚C10砼垫层=35.25×
0.05=1.76m3
4、20厚1:
3水泥砂浆找平=35.25m2
5、10厚铺地砖:
门口=0.9×
2=0.216m2
铺地砖=35.25+0.216=35.466m2
地3A:
楼梯间m2
1、20厚1:
2水泥砂浆抹面压实赶光
2、素水泥一道
3、50厚C10砼
4、150厚3:
5、素土夯实,压实系数0.90(素土厚度230mm)
楼梯间=(4.5-0.24)×
(2.1-0.24)=7.92m2
1、素土垫层=7.92×
0.23=1.82m3
7灰土垫层=7.92×
0.15=1.19m3
3、50厚C10砼垫层=7.92×
0.05=0.40m3
2.5水泥砂浆抹面压实赶光=7.92m2
二层
地8D:
会客厅、阳台
3、素水泥浆一道
4、35厚C15细石砼找平层
5、素水泥浆一道
会客厅=(4.5-0.24)×
(3.9-0.24)=15.59m2
1、35厚C15细石砼找平层
2、10厚铺地砖:
0.12=0.49m2
铺地砖=15.59+0.49=16.08m2
阳台=(4.56-0.06×
(1.2-0.06)5.