Project,SH3503–2001
z标准规范StandardSpecification
《建筑给水排水及采暖工程施工质量验收规范》GB50242-2002
CodeforAcceptanceofConstructionQualityofWaterSupplyDrainageandHeating
Works,GB50242-2002
《工业管道工程施工及验收规范》GB50235-98
CodeforConstructionandAcceptanceofIndustrialPipingEngineering,GB50235-98
《建筑给水聚丙烯管道(PP-R)工程技术规程》DBJ/CT501-99
TechnicalSpecificationforConstructionWaterSupplyofPolypropylenePiping
Engineering,DBJ/CT501-99
z质量评定标准QualityEvaluationStandards
《建筑采暖卫生与煤气工程质量检验评定标准》GBJ302-88
CodeforAcceptanceofConstructionQualityofWaterSupplyDrainageandHeating
Works,GBJ302-88
2.给排水与采暖工程施工质量控制程序ConstructionQualityControlProcedureforWaterSupply/DrainageandHeatingWorks
序号
质量控制点
控制内容
控制方法
等级
参加单位
控制表格验收表格评定表格
备注
施工/总包商
监理
PMC
业主
政府部门
1
施工方案审查
施工承包商资质质量保证体系主要人员资质
施工工艺的科学性、可行性
施工机具、设备的正确性、有效性施工措施的合理性
执行P-CM302001
施工方案审批程序
B
X
GB50319-2000,A1,A2
A3,B1
SH3503-2001,J116
2
进场主要材料质量控制
规格、型号、数量满足设计要求质量证明文件
按比例抽检外观检查自检结果
执行P-CM305002材料设备进场检验程序
GB50319-2000
A4\A9\B1
3
管道防腐
管道防腐质量是否满足规范要求
C-024防腐工程质量检验试验计划
SH3503-2001J117
A4\A10\B1
BSC-D1
4
阀门试验检查
检查材料规格、型号是否满足设计要求试验方式、方法是否满足规范要求试验压力是否满足设计、规范要求试验比例是否满足设计、规范要求
P-CM305002材料设备进场检验程序工程施工及验收规范
C
GB50242-2002
表3.2.5
GB50235-97
表A.0.1
A4\A9\B1
C-017
5
室内给水管道安装检查
管道规格、材质检查法兰密封面的平行偏差及间距符合要求,丝扣完好;
螺栓应能在螺栓孔中顺利通过
工程施工及验收规范设计文件
C-016工艺管道安装施工质量检验试验计划
GB50242-2002,050101附录B,附录C,附录DSH3503-2001
J118
A4\A9\B1
6
室内消火栓安装检查
射程是否满足设计要求是否满足规范要求
工程施工及验收规范
设计文件
C-016工艺管道安装施工质量检验试验计划
GB50242-2002,50102附录B,附录C,附录DGB50319-2000
A4\A9\B1
7
给水设备安装检查
规格、型号是否满足设计要求土建基础交安是否满足设计、规范要求
是否按规范进行检验、试验
GB50242-2002,50103附录B,附录C,附录DGB50319-2000
8
室内排水管道安装检查
是否满足设计要求是否按规范要求进行检验、试验是否按规定进行标识
SH3503-2001,J411
GB50242-2002,050201
050202
附录B,附录C,附录DGB50319-2000
A4A9\B1
9
室内热水管道及辅助设备安装检查
GB50242-2002,050301
050302
附录B,附录C,附录DSH3503-2001,J118
10
卫生器具及给水配件安装检查
规格、型号是否满足设计要求安装是否按规范要求
GB50242-2002,050401
050402
11
室内采暖系统安装检查
是否符合设计图纸要求安装是否符合规范要求管道安装坡度检查
GB50242-2002,050501附录B,附录C,附录DGB50319-2000
12
室内采暖辅助设备及散热器及金属辐射板安装工程检查
规格、型号是否满足设计要求安装是否符合规范要求试验是否按规范要求
C-016工艺管道安装施
GB50242-2002,050502
050503,050504
13
室外给水管道安装工程检查
工质量检验试验计划
GB50242-2002,050601
050602,050603
14
室外排水管道安装工程检查
GB50242-2002,050701
050702
15
室外供热管道及配件安装工程检查
是否符合设计图纸要求;
固定支座和膨胀检查安装是否符合规范要求管道安装坡度检查
SH3503-2001,J418
GB50242-2002,050801附表B,附表C,附表DGB50319-2000
ConstructionQualityInspectionandTestPlanforWaterSupplyDrainageandHeatingWorks(Rev2).doc
16
建筑中水系统及游泳池水系统安装工程检验
GB50242-2002,050901
050902
附表B,附表C,附表DGB50319-2000
17
锅炉及辅助设备安装工程检验
是否满足设计要求安装是否符合规范要求试验是否按规范要求
GB50242-2002,051001
051002
附表B,附表C,附表DGB50319-2000,A4\A9\B1
18
分部工程质量验收
是否满足设计要求安装是否符合规范要求试验是否按规范要求分项及子分部工程质量验收是否合格
P-CM308002
机械竣工验收程序
A
附录E
2.ConstructionQualityControlProcedureforWaterSupply/DrainageandHeatingWorks
Item
No.
QualifyControlPoint
ControlContent
ControlMethod
Grade
PartiesInvolved
ApplicableForms
Contractor
SupervisionOrganization
PMC
Owner
GovernmentAgency
Reviewforconstructionprogram
Constructioncontractor’squalification
QualifyAssuranceSystem
Mainpersonnelqualification
Thescientificandfeasibilityofconstructionprocess
Thecorrectnessandeffectivenessofconstructionequipmentandimplement.
Therationalityofconstructionmeasures
P-CM302001Review/ApprovalProcedureforConstructionProgram
Qualitycontrolformainmaterialsdeliveredonsite
Specification,typeandquantityshallmeetthedesignrequirements.
Qualitycertificatedocument
Spotcheckasperratio.Visualinspection.
Selfinspectionresult
P-CM305002InspectionProcedureforMaterialsandEquipmentDeliveredonSite
Pipinganticorrosion
Thepipinganticorrosionqualityshallmeetthecoderequirements.
C-024QualityInspectionandTestPlanforAnticorrosionWorks
Valvetest
Inspectthematerialspecificationandtypetomeetdesignrequirements.
Testmodeandmethodshallmeetcode
requirements.
Testpressureshallmeetdesignandcoderequirements.
Testratioshallmeetdesignandcoderequirements.
P-CM305002InspectionProcedureforMaterialsandEquipmentDeliveredonSite.CodeforProjectConstructionandAcceptance.
Form3.2.5
FormA.0.1
Checkthe
installationofindoorwatersupplypipe.
Checkpipespecificationandmaterial.
Theparalleldeviationandpitchofflangesealfaceshallmeettherequirements.Screw
threadiscomplete.Boltscangointoholesmoothly.
CodeforProjectConstructionandAcceptance
DesignDocument
C-016ConstructionQualityInspectionandTestPlanforProcessPiping
GB50242-2002,050101
AppendixB,AppendixC,
AppendixDSH3503-2001
Checktheinstallationofindoorhydrant.
Rangeshallmeetthedesignrequirements.Meetthecoderequirement.
C-016ConstructionQualityInspectionandTestPlanforProcessPiping
GB50242-2002,50102
AppendixDGB50319-2000
installationofwatersupplyequipment
Specificationandtypeshallmeetthedesignrequirements.
Civilworkfoundationhandoverforinstallationshallmeetdesignandcoderequirements.
Inspectionandtestshallmeetthecode.
C-016ConstructionQualityInspectionandTestP
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 17 ITP for Water Supply drainage and Heating works finished
链接地址:https://www.bdocx.com/doc/19919232.html