Construction Technique summary文档格式.docx
《Construction Technique summary文档格式.docx》由会员分享,可在线阅读,更多相关《Construction Technique summary文档格式.docx(72页珍藏版)》请在冰豆网上搜索。
CementFiberboardCeilingconstruction21
水泥纤维板吊顶工程21
WALLENGINEERING23
Woodveneer23
木饰面24
Dry-hangstone25
干挂石材26
Stoneveneer27
湿贴石材29
Stainlesssteelveneer30
不锈钢饰面31
Tileveneer32
瓷砖施工工艺33
Hardwallpanels34
硬包施工工艺34
Wallpaper35
墙纸36
Aluminumveneer36
铝饰面38
Mosaicconstructiontechnology39
Constructionarrangementandmethodforpolyurethanewaterproofpainting.39
聚氨酯防水涂料施工方案40
ExternalWallPaintWorks41
外墙涂料工程42
FLOORFINISH43
Cementmortarscreed43
水泥砂浆楼地面44
Stoneground45
石材地面46
Woodfloor46
木地板47
Carpet48
地毯49
Mosaicconstructiontechnology49
马赛克50
Tile51
瓷砖51
波打线52
Epoxyresinflooringconstructiontechnique52
环氧树脂地坪施工工艺53
GLASSVENEER54
玻璃饰面54
WATERPROOFINGWORK56
WaterproofCoating56
防水工程56
WaterproofMembrane57
卷材防水57
EMULSIONPAINTENGINEERING59
乳胶漆工程59
LIGHTSTEELKEELPARTITIONWALL60
轻钢龙骨隔墙61
DOORANDWINDOWS
Fire-proofdoorconstructiontechnique
Technicalprocess
Marktheline-Installthedoorframe-Installdooraccessories
Operationtechnique
1.Marktheline
Accordingtothedesignrequirementssize,heightanddirectionmarkoutthedooropeningpositionline.
2.Installthedoorframe
Firstremovelowerpanelfromthedoorframe,theheightofthedoorframeshouldbetallerthanthedoorleafby30mm,leavesomespacebetweenbothsidesofthedoorframeandtheopening.Thedoorframesaregenerallyembedded20mmbelowtheelevationat±
0•00toensurethatthedooropeningandframearethesamesize.Thetolerabledeviationis<
1•5㎜andthetolerablediagonaldeviationis<
2㎜.Temporarilyfixthedoorframetotheopeningusingawoodenwedge,afterpositioningcorrectlyfixthewoodenwedge,doorframepinandembeddedironwelding.TheninthetwouppercornersofthewallopeningpourtheMIOcementmortarandinstallthedoorleafafteritsolidifies.Duringwinterpayattentiontoweather-proofing.Themaintenanceperiodis21daysafterpouringthecementmortar.
3.Installdooraccessories
Thegapsaroundthedoorframeshouldbefilledwith1:
2cementsandmortarorfinestoneconcretecaulkwithstrengthnotlessthan10MPatoensurethatthewallandthedooropeningsolidifiesasone.Aftercuringpaintthewallanddooropening.
Afterthepaintcompletioninstallthedoorleaf,hardwareaccessoriesandrelatedfirepreventionandanti-theftdevice.Whenthedooriscloseditshouldbeevenandlevel,itshouldopensmoothlyandlightly.
防火门施工工艺
工艺流程
划线-立门框-安装门扇附件
操作工艺
(1)划线
按设计要求尺寸、标高和方向,画出门框框口位置线。
(2)立门框
先拆掉门框下部的固定板,凡框内高度比门扇的高度大于3Omm者,洞口两侧地面须设留凹槽。
门框一般埋入±
0•00标高以下2O㎜,须保证框口上下尺寸相同,允许误差<
1•5㎜,对角线允许误差<
2㎜。
将门框用木楔临时固定在洞口内,经校正合格后,固定木楔,门框铁脚与预埋铁板焊牢。
然后在框两上角墙上开洞,向框内灌注MlO水泥素浆,待其凝固后方可装配门扇,冬季施工应注意防寒,水泥素浆浇注后的养护期为21d。
(3)安装门扇附件
门框周边缝隙,用1:
2的水泥砂浆或强度不低于10MPa的细石混凝土嵌缝牢固,应保证与墙体结成整体;
经养护凝固后,再粉刷洞口及墙体。
粉刷完毕后,安装门扇、五金配件及有关防火、防盗装置。
门扇关闭后,门缝应均匀平整,开启自由轻便,不得有过紧、过松和反弹现象。
Stonedoor
Technologicalprocess:
Inspectionandacceptanceofthestoneslabs→thestoneplatesshouldbestackedaccordingtothespecificationsoftheinstallationorder→Initialinstallation→Reinforcement→Acceptance
Operationtechnique:
a.Inspectionandacceptanceofthestoneslabs
Contentoftheinspection:
(1)Sizeandquantityoftheslabs
(2)Whetherthereisamismatchbetweenthelayers.
(3)Whetherornottheslabstacksaresafeandreliable.
(4)Whetherornottheerrorismorethanthestandardplate
(5)Whetherornotthecolordifferenceismorethanthestandardplate
(6)Whetherornottherearedamagedplates
Contentoftheacceptance:
(1)Whetherornotthe3Derroriswithinthecontrolrange
(2)Ifthereisanydamage,replacementshouldbecarriedout.
(3)Whetherornotthereareabnormalitiesinthesealant.
(4)Structuraladhesivebondingtestshouldbedoneonthesample
b.
The
stone
plates
should
be
stacked
according
to
the
specifications
of
installation
order:
before
installing
plates,
stack
them
order,
when
stacking
it
have
appropriate
tilt
avoid
overturn
plates.
c.
Initial
installation
(1)
Base
line
plane
After
and
adjustment
keel,
hang
vertical
plane
from
top
stone.
This
is
generally
chosen
at
right
corner
plane.
When
hanging
line,
consider
cooperation
granite
with
other
kinds
comprehensively,
regulating
ability
itself.
each
plan
line.
(2)
Drawing
horizontal
line
Determine
bottom
position
design
actual
situation
construction,
draw
a
between
two
lines.
Horizontal
will
determine
plane.
(3).Installationofstoneplate
●Fixbyhangingthestoneplatewithalreadyinstalledrearcutboltsandaluminumalloyfastenersonthependant.
●Ifthestoneplateisunevenwiththeplaneoftheline,adjusttheadjustingbolt,levelitandfastenthebolt.
●Anti-slipboltinstallation
●Theinstallationoftherearstoneplateisbasedonpreviousstoneplateaswellasverticalandhorizontalplanelineasthebaseline.Otherstoneplatesarethesametothefirststoneplate.Atthesametimeit’snecessarytopayattentiontoadjustthetransversejointstraightnessandverticaljointstraightnessofstoneplates.Theseamwidthallowsthedeviationtobeinaccordancewithregulatoryrequirements;
●Whetherthereareanystoneplateswithcolordifferencessurpassingthestandards
●Whetherthereareanystoneplatesthathasbeendamaged;
d.Reinforcement:
doatimelyreinforcementafteradjustment,ensuringaninstallationsuccessrateforeverypieceofstone.
e.
Acceptance:
Qualitycontrolgetsconductedforeveryinstallationprocessfrombeginningtilltheendofcompletionofinstallation.Acceptanceisalsointerspersedwithandinthewholeprocess.Theacceptancecontentsare:
(1)Whether
ornotthere
problem
plate
itself.
(2)Whether
size
sealant
meets
requirementsandthe
glue
vertical.
(3)Whetherthereisafaultysurfaceappearanceonthestoneplateandifthecolordifferenceiswithinthescopeofthepermit.
(4)Whetherornotthecornersofthestoneplateisdamaged
石材门套
工艺流程:
验收石材板块→将板块按顺序堆放→初安装→加固→验收。
操作工艺:
a.检查验收石材板块。
检查的内容有:
(1)规格数量。
(2)层间错位情况。
(3)堆放安全。
(4)是否有误差超过标准。
(5)是否有色差超过标准。
(6)是否有已经损坏。
验收的内容有:
(1)误差是否在范围内。
(2)是否损坏。
(3)胶是否异常。
(4)抽样测试。
b.石材板块按顺序堆放:
安装前按安装顺序堆放,堆放时应适当倾斜。
c.初安装:
(1)石材平面基准线
石材龙骨安装完毕,石材顶部吊纵向平面线。
吊线考虑花岗石石材与其他种类石材的配合以及石材的调节能力。
每个平面的转角应吊竖直线。
(2)拉水平线
根据情况确定石材底边位置,两条竖直线之间拉一条水平线,水平线和竖直线确定平面。
(3)装石材板块
●安装后切螺栓、铝合金扣件的石材在挂件上固定。
●石材与平面线不齐可以调整螺栓。
●安装止滑螺栓。
●后一块板的安装,以前一块及纵横平面线为基准。
其他与第一块相同。
同时调整石材的横缝直线度,竖缝直线度,拼缝宽度偏差符合规范。
●色差是否超过标准。
●是否有损坏。
d.加固:
调整后及时加固,确保石材的安装成功。
e.验收:
每次安装,全过程进行质量控制。
(1)板材是否有问题。
(2)胶缝大小是否符合设计要求。
(3)石材是否有错面现象,色差是否在允许范围内。
(4)石材角是否损坏。
Hiddendoor
Basetreatment→Snapline→Setout→Frameinstallation→Hiddendoorinstallation→Cleaningandprotection
Operationaltechnique:
a.Basetreatment:
Cleartheconcretebaseandbrickbasebyshovelingthelaitanceandhollowplasterlayer
b.Snapline:
Snapsurfacelayercontrollineonthefloorandsnaphorizontalcontrollineonthewall;
processblankdoorframeaccordingtocontrollineonthegroundsurfacelayerandpre-burythedoorhingefastenersaccordingtothesnappedcontrolline.
c.Frameinstallation:
Processandcustomizethestainlesssteelsquareandthehiddendoorincorrespondingmaterialaccordingtothedesigndimensionandactualmeasureddimensionandweldthestainlesssteelsquareframetogetherwiththehinge.
d.Accordingtotheactualsettingoutdimensions,drillthehiddendooraccordingtothewallbrickslot,putthehiddendooronthestainlesssteelsquareandfixthehiddendooraccordingtothedesignrequirements.Fullprotectionisrequiredforthehiddendoor.
e.Cleaningandprotection:
afterthedoorinstallation,usingaclothwipeallsurfacesclean,thereshallbenodirt.
暗门
施工流程
基层处理→弹线→骨架安装→暗门安装→清洁保护
施工工艺
a.基层处理:
对砼基层及砖基层清理。
b.弹线:
地面上弹出面层控制线、墙面上弹出水平控制线。
根据地面面层控制线加工暗门门框,弹出的控制线预埋门铰固定件。
c.骨架安装:
根据尺寸定制不锈钢方通及暗门,将方通骨架与门轴焊接。
d.暗门安装:
根据实际尺寸放样定值,并按墙体面砖槽位置在暗门上钻孔,将暗门覆在不锈钢方通上,按设计要求固定暗门。
e.清洁保护:
暗门安装完后,板面擦试干净。
Metalglassdoorinstallation
a.FixedpartInstallation
Cutglass→fixbottombracket→Installglassplate→Pastetheadhesiveseal
b.Movableglassdoorinstallation
Marktheline→determinetheheightofdoorsandwindows→fixdoorandwindowstopandbottomrail→Fixdoorsandwindows→installthehandles
Operationprocess
(1)Fixbottombracket:
stainlesssteelorcopperdecorativewoodbottombacking,availablemethodistofixthewoodenwedgesonthesurfaceusinganailandthenusinganadhesive,stickthestainlesssteelpanelsontimber.Ifit’smadeofaluminumalloysquaretube,wecanuseanaluminumangletofixon