施工组织设计奶牛场Word下载.docx
- 文档编号:18009172
- 上传时间:2022-12-12
- 格式:DOCX
- 页数:117
- 大小:135.30KB
施工组织设计奶牛场Word下载.docx
《施工组织设计奶牛场Word下载.docx》由会员分享,可在线阅读,更多相关《施工组织设计奶牛场Word下载.docx(117页珍藏版)》请在冰豆网上搜索。
2.3施工现场概况..........................................................................6
2.4工程施工的特点和难点分析...............................................................6
2.5施工重点、难点对策.....................................................................7
3、施工部署...................................................8
3.1项目组织管理机构.......................................................................8
3.2工程管理目标.........................................................................10
3.3流水段划分、施工顺序及验收安排........................................................11
3.4施工方案选择.........................................................................12
4、施工准备..................................................12
4.2施工生产准备.........................................................................13
5、施工方案及技术措施.........................................16
5.1施工测量.............................................................................16
5.2土方工程.............................................................................18
5.3钢筋工程.............................................................................19
5.4模板工程.............................................................................24
5.5混凝土工程...........................................................................29
5.6脚手架工程...........................................................................36
5.7砌筑工程.............................................................................38
5.8地面工程.............................................................................41
5.9防水工程.............................................................................44
5.10装饰、装修工程......................................................................44
5.11给排水工程..........................................................................49
5.12电气设备安装工程.....................................................................52
5.13卷帘窗工程..........................................................................59
5.14钢结构工程..........................................................................63
6、质量保证措施和创优计划.....................................73
6.1质量方针和目标.......................................................................73
6.2质量保证体系(ISO9001-2000国际质量标准)................................................73
6.3质量管理控制措施......................................................................74
6.4安装工程质量控制措施..................................................................77
78
........................................................实施建筑工程施工强制性条文措施6.5.
6.6质量通病防治措施......................................................................78
6.7雨季施工措施.........................................................................83
6.8夏季高温季节施工措施..................................................................85
6.9成品保护措施.........................................................................85
6.10质量标准承诺及保证措施...............................................................86
7、施工总进度计划及保证措施...................................87
7.1保证工期的措施.......................................................................87
7.2施工进度动态管理......................................................................89
8、施工场地治安保卫管理计划...................................89
9、施工安全措施计划...........................................89
9.1职业健康安全施工目标..................................................................90
9.2职业健康安全管理体系..................................................................90
9.3职业健康安全责任制....................................................................90
9.4职业健康安全制度落实..................................................................91
9.5职业健康安全防护技术措施..............................................................92
9.6施工现场安全技术措施..................................................................99
9.7消防保卫管理措施.....................................................................101
10、文明施工措施计划.........................................103
10.1文明施工管理目标....................................................................103
10.2文明施工保证组织....................................................................103
10.3文明施工管理措施....................................................................104
10.4场容管理措施.......................................................................105
11、施工环境保护措施计划.....................................106
11.1管理措施...........................................................................106
11.2危险源识别与防护....................................................................106
11.3环境与职业健康防护..................................................................106
11.4环境卫生管理措施....................................................................106
11.5防止水污染措施.....................................................................107
11.6防粉尘措施.........................................................................107
11.7降噪专项措施.......................................................................107
12、重点工序识别与控制.......................................108
12.1重点工序识别.......................................................................108
12.2重点工序控制措施....................................................................108
13、成品保护和工程保修工作的管理措施和承诺..................110
13.1工程保修措施.......................................................................110
13.2保修承诺...........................................................................112
112
.......................................................................成品保护措施13.3.
14、任何可能的紧急情况的处理措施、预案以及抗风险的措施.......112
14.1应急资源分析.......................................................................113
14.2法律法规要求.......................................................................113
14.3应急准备...........................................................................113
15、对总包管理的认识以及对专业分包工程的配合、协调、管理、服务方案115
15.1与监理单位工作的协调................................................................116
15.2与设计单位的协调配合................................................................116
15.3与城监部门的协调配合................................................................117
15.4与专业单位的协调配合................................................................117
15.5对各专业分包商提供措施..............................................................118
15.6对各专业承包商的组织、管理、协调和控制..............................................118
15.7对各专业承包商的服务与支持..........................................................119
15.8对质量的管理和控制..................................................................119
15.9对工期计划管理和控制................................................................119
15.10对专业承包商深化设计和详图设计的协调和管理.........................................120
15.11对工程质量的严格控制,确保工程精品.................................................120
15.12对其它方面的组织、管理、协调和控制.................................................120
16、与发包人、监理及设计人员的配合...........................120
16.1协调方式...........................................................................120
16.2与设计单位间的工作协调..............................................................121
16.3与建设单位的工作协调................................................................121
16.4与监理工程师工作的协调..............................................................122
16.5项目部内部各专业班组的工作协调......................................................122
17、“四新”技术的应用........................................122
17.1信息化软件管理.....................................................................122
附表一:
拟投入本工程的主要施工设备表........................124
附表二:
拟配备本工程的试验和检测仪器设备表.............126
附表三:
劳动力计划表......................................127
附表四:
计划开、竣工日期和施工进度网络图................127
附表五:
施工总平面图......................................129
附表六:
临时用地表.......................................129
1、编制说明与依据
编制说明1.1.
本施工组织设计大纲系公司对宁夏农垦平吉堡农场2000头奶牛养殖场改扩建项目一标段施工的总体构思和部署,项目部将依据公司技术管理程序,按照本大纲确定的基本原则,进一步完善细化,并且编制单体专项施工方案用以具体指导施工,确保工程优质高效地建成。
1.2编制依据
宁夏农垦平吉堡农场2000头奶牛养殖场改扩建项目一标段施工招标文件
根据中华人民共和国《建筑法》、建设部颁发的《建筑工程施工现场管理规定》、《建筑施工安全检查标准》、《施工现场临时用电安全操作规程》等有关创安全标化工地的创建要求及办法等纲领性文件以及宁夏回族自治区有关文明标化工地的创建要求、办法及其它指导文件。
工艺标准及操作规程。
国家强制性技术质量标准、施工验收规范、规程及相关图集。
现行国家、行业及地方有关政策、法律、法规。
2、工程概况
2.1工程简介
工程名称:
工程地点:
宁夏银川市贺兰山
建设单位:
宁夏回族自治区农垦事业管理局
施工单位:
2.2设计概况
2.2.1建筑设计概况
本工程此次Ⅰ标段工程新建牛舍,总建筑面积7547m2。
2.2.1.1牛舍:
座北向南,地上一层,1~40轴钢结构,抗震设防裂度为8度,耐火等级为二级,设计使用年限为50年。
南北长234.56m,东西宽31m,建筑高度9.667m,建筑面积7547m2。
2.2.2结构设计
本施工组织仅就主要施工任务作出部署和指导,待我公司中标后,立即组织公司技术总工和项目部技术负责人进行单体工程和重要分部分项工程的专项施
工方案编制。
2.2.3专业设计
2.2.3.1给水工程:
Ⅰ标段五个子项工程中的给排水工程施工方法基本相同,统一概述如下:
(1)给水系统
本工程给水系统由室外给水管网提供,供水压力0.30MPa,给水管采用给水PP-R管,热熔连接,PPR阀门,管道工作压力为1.0MPa,试验压力为0.6MPa,试压方法应按《建筑给水排水及采暖工程施工质量验收规范》GB50242-2002的规定执行,管道在系统运行前须用水冲洗和消毒,要求以不小于1.5m/s的流速进行冲洗,。
(2)消防系统
该工程为中危险级,灭火器配置手提式磷酸铵盐灭火器,灭火级别2A(锅炉房3A),型号为MF/ABC2(4kg)(锅炉房MF/ABC3(5kg))。
(3)排水系统
生活污水经室内排水管道汇合后,再排至定外管网,室内排水管采用U-PVC管,热熔连接,管道工作压力为1.0MPa。
冲洗以管道通畅为合格,排水管应作通球试验。
(4)热水系统
热水量为3.2m3/d,本热水系统供应压力来自高位储热水箱,水箱高度不能满足系统供水压力时,应在热水供水干管上加装加压供水装置,热水管道采用热水PP-R管,PPR阀门,热熔连接,管道工作压力为1.0MPa。
2.2.3.2电气工程:
(1)供配电
该建筑为三级负荷,电源引自场区内变电所低压配电室,电压为380/220V,TN-C-S系统,线路采用铠装电缆直埋引入本建筑内,建筑内设动力照明配电箱。
(2)照明系统
各照明箱引出的照明支线分别BV-500型铜芯塑料导线。
)1X对应照度值(W/m2)
照明功率密度(.
房间或场所现行值
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 施工组织设计 奶牛场