quantity
h
Twoset
*1.MilkUHTprocessingandasepticbufferequipmentshouldincludethefollowing:
UHTasepticsystem.
Properautomaticcontrolsystemandstablepowerdistributionsystem.
Energypipesconnectedwithequipment.
Signalwiresconnectedwiththepretreatmentandthefiller.
ProductpipesandCIPpipeconnectedwiththeasepticfiller.
2.Thebiddershouldalsoprovidespares,sparepartsandspecialmaintenancetoolsforsingleequipmentrequiredbyequipmentrunning6000hrs.Thelistshouldmarkthenumber,amountandunit-priceofspareparts.
3.Thedomesticmatchingequipmentshouldindependentlylistthename,type,manufacturerandpriceofequipment.Andthequalitystandardofthemanufacturers’shouldbethesameasimportequipment’s.
4.Theprojectincludesallofdesign,supply,installation,commissioningofequipmentandpersonaltraining.Italsoincludestheequipmentofsupply,matchinginstallationmaterial,pipingengineering,supports,valves,sparepartsandspecialtools.Electricalsystem,controlsystem,meters,supportsofcablesandpipingmatchingwiththedesignofsupplyshouldbealsoincludedinbiddingdocument.
5.Allofthebrands,theusingindicationandthewarninglabelsofequipmentanditsauxiliaryequipmentshouldbeexpressedbyEnglishorChineseandcommonsigns.
6.Theexteriorpackagingshouldbeanti-wear,protectionagainstthetide,rust&
shock,andprotectionagainsttherudeloading&
unloading.Anditshouldapplytothewholehoistandtransportinlongdistance.
7.Deliveryplace:
add:
thesiteofinstallationofbaotou-yilidairyco.ltd
XituTechnicaldevelopmentdistrict,baotou,InnerMongoliaProvince
Date:
Thebiddershouldfinishthesupply,installation,debugging&
commissioningofthesystemandthetotalscheduleofthetestingrunbeforeDec.20,2002,andbegintoprocessaseptictestfrom,2003.Thebiddershouldalsomakeaplanaboutengineeringindetailandprovideitinthebiddingdocument.
Ⅳ.Designbase:
*2.1.TheproductionlineofUHTshouldbeautomaticcontrol.The6t/hhomogenizershouldbefrequencyconversioncontrolandnon-aseptic.Andthereisdeaerationequipment.
*2.2.Duringdesigning,itshouldbeconsideredthatthecoolingwaterofequipmentsmustbecycled,notallowtobedirectlydischarged.
*2.3.Thathavebeenmentionedequipmentsmustbecompliedwiththerequirementofinternationalfoodhygienicstandardandenvironmentalprotectioncode.Thebiddersshouldlisttheinternationalstandardandenvironmentalprotectioncodethathasbeenadoptedinthebiddocumentation.
*2.4.Toproducepuremilkmainly.
Ⅴ.TechnicalSpecifications:
System:
*6t/hfrequencyconversioncontrol.
temperature:
137℃,4sand120℃,30s
stagehomogenizer:
non-aseptic,continuousworkingpressure250bar
equipment:
levelfluctuationislessthan1%andthetemperaturedropis4-7℃.
≥90%
rate:
1/109,attainingtherequirementofcommercialsterility
exchangeheatandlessretainingonthewall:
Havingproducedpuremilkproduct(drymatter≥%)for10hours,thencleaning.Aftercleaning,itcangoonproducingforabove8hours.
flow-meter(feedliquid,hotwater)
℃120s).
signalfeedbackforvalves.
watercycleforcoolingequipment.
fedbyproductpumpofthepretreatmentofUHT,andtheindicationofaskingforfeedtopretreatment.
plant:
self-takecleaningsystem,acid-alkaliliquidautomaticbatching,automaticprocedurecleaningandtheconcentrationofcleaningsolutiondetectinginline.
Control:
andhardwarecanbeupgraded,whichhavethecompatibilitytoothersystem,theprogramcanbeenmodifiedonline,intermsofproductionprocessingchange.
incontrolinterfacemustbesimilartoproductionprocessing.Allfunctionalbuttersinthediagramshouldbereasonablydesignedforeasyoperation.Alltheparametersmustdisplaywithmeasureunits.Inaccordingtomanagement,operationandmaintenance,thereshouldbepasswordprotectionindifferentlayers&
droitinoperationinterface.
Ⅵ.Thesellerduty(Besidesabovementionedscopeofsupply,thesellershouldalsoundertakethefollowingduty):
publicservicesinformation:
Thesellershouldprovidedetailinformationonrequiredvolumeandloadofpublicservices.Aftersigningthecontract,thesellershouldrefertherequirementofpowerentrylineandenergypipelinesizeinstalledbythebuyerwithintwoweeks.
andstoringofequipments:
Thesellershouldundertaketounload,storeandtakecareofequipmentsduringequipmentsarrivalonspotorbeforeandinstallation.
installationandcommissioningofequipments,andaffordingallcostscausedbyinstallationandcommissioningofequipment.
allspecifictools,apparatusandspecificelevatingplantsneededbyinstallationandcommissioningoffactory.Allcostscausedbythementionedarebornebytheseller.
termsofthebuyerdefiningpublicengineeringinterface(withlayoutdrawing),providingpipe,valve,filter,pressuregauge,thermometerandflowmeterrequiredbythepublicengineeringconnectedwithequipment.
responsiblefordesigningandconstructingtheconnectionofproductpipebetweentheformerandlaterstage.Andprovidingfittingandvalvesrequired.Thewastewaterwhichequipmentdischargeshouldbedrainedthroughthestainlesssteeltube.
7.Materialsofinstallation:
thepipelinescontactingwithconcentrateacid&
alkaliandtheproductsadopt316Lorthesamematerialqualitystainlesssteel,theotherpipelines'
bracketsadopt304Lorthestainlesssteelofthesamematerialquality.
theelectriccablesandsignalwiresadopttheplasticinsulationwiththefeaturesofpreventingacid,alkali,antiseptic.Thewire’sgroovemustbestainlesssteelplateenclosurestructure(thethicknessisabove).
insulatinglayerofthepipelinesneededheatpreservationhasgoodfeaturesandmeetstherequirementofthefoodfactory.Theskinadoptsthestainlesssteelplate(thethicknessisabove).
thematerialsforinstallingmusthavetheplaceofproduction,thecertificationandspecificationofthematerialquality.
8.Testingequipment:
thesellershouldprovidethetestingequipmentandensure
theusabilityatsiteofthetestingequipmentwhilereasoningwhetherplant
equipmentsatisfiestherequirementandparametersasstipulatedinthecontract
and/orstandard.
9.Siteprojectmanager:
thesellershouldsendprojectmanagertothesiteand
informthebuyer.He/Sheshouldhaveenoughrightsastherepresentativeofthe
sellertoissueandreceiverelatedcommandanddirection,putforwardadvice
andsuggestion,anddotheassociativelysitechecking.Thesellershouldensure
thatitsadjustingrepresentativebeatsitefromthebeginningoftheinstallation
totheendofthetest-run.
10.Packageandtransportation:
thesellerchoosingthepackingsizeandweightshouldconsiderthewayoftransportationandlocaltransportationsystem.
11.After-Salesservice:
areserviceengineertoofferfree-chargetracingservicesforatleastoneyearaftertheequipmentisacceptable.
thesellersellsequipmenttothebuyer,thebuyeronlyisresponsiblefordailymaintenance.Thesellershouldberesponsibleforbigexaminationofequipmentandmakinga1000-hourplanofmaintenanceandreparationofequipments.Afterthepre-datingexpire,bothofthemshouldsignanotheragreementaboutmaintenance,serviceandtakingcare.
thesellerreceivesamaintenanceannouncementfromthebuyer,ifitcanbesolvedbytelephoneorfax,solvingbytelephoneorfaxmustbesolvedwithin24hours.Ifnot,thesellermustsendqualifiedengineerstothespottorepairthemwithin48hours.
sellershouldintimeprovidetheinformationofdomesticmanufacturersthatmakesparepartsanddailyconsumablematerialusedforequipmentsduringoperatingequipments.
.Personaltraining:
Thesellershouldtraintheoperatorsintheplantofthebuyeratplantsite.
Sitetraining:
detaildescriptionoftheoperationandmaintenancemethod,demonstrationofadjustmentandcontrolofequipment,provisionoftraininginformation.Andtheformaltrainingclassisnolessthan36hours.
Ⅶ.Drawinganddocumentation(Thebiddocumentationdeliveredbythe
sellershouldincludethefollowingChinese-Englishdocumentations):
1.Designspecifications.
2.Thelayoutofequipments:
showingtheoperationofequipmentsandthespaceofmaintenance.
3.Processdiagram:
displayingallcontrolpointsandmeters.
requirementofenergyconsumptionandenergyquality.
5.Technicalspecification:
describingperformance,material,standard,typeandhomeofprovidingequipments(Theappearancesmarkmeasureaccuracy).Allequipmentshouldhaveproductsample,anddefineitsspecification,theplaceandthesizeofpipenozzleconnectedwithwater、electric、steam、coolandcompressedair.
6.Thescheduleofenforcingproject:
Thesellershouldprovidethescheduleofenforcingprojectindayunit.
7.Whenthecontractcomesintoforce,thesellershouldprovideproperdocumentinformationonequipment:
specifications,certificationforleavingfactory,maintenancemanuals,sparepartsmanualsandelectricalmanualswithintwomonths.Allofthedocumentsshouldbe3copiesinChineseandEnglishrespectively.
Ⅷ.Acceptablestandards:
1.Installation/commissioning/acceptationofequipment:
1.1.Theinstallation/commissioning/acceptationofequipmentsshouldbeaccomplishedbeforeDec.20,2002,andbegin
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 灭菌 英文 标书
![提示](https://static.bdocx.com/images/bang_tan.gif)