EEventconstrainedwithinplannedeffort.
B
QUESTWhichofthefollowingimpactsthecriticalpath?
AChangingthetaskduration.
BReducethefreefloatofanactivity.
CExecutingabackwardpass
DAorB
ENoneoftheabove.
A
QUESTTherangeoftimeallowedforanactivitytobecompletedinisthe_____.
APlannedtime(Duration).
BFloattime(LS-ES,orLF-EF).
CCriticaltime(whenES=LS,orEF=LF).
DScheduledtime(LF-ES).
EEvent.
D
QUESTFreefloatistheamountoftimethatanactivitymaybedelayedwithoutaffectingthe_____.
AEarlystartofthesucceedingactivities.
BLatestartofthesucceedingactivities.
CProjectfinish.
DCostoftheproject.
QUESTUsingtheproblemstatedintheSpecialwindow,Calculatethedeviationofdurationforthetask,usingthePERTconceptofstandarddeviationoftaskduration.
A0.5
B1
C1.8
D2.2
E2.8
C
QUESTIncrashingatask,youwouldfocuson:
AAsmanytasksaspossible.
BNoncriticaltasks.
CAcceleratingperformanceoftasksoncriticalpath.
DAccelerateperformancebyminimizingcost.
EAandD.
QUESTUsingtheproblemstatedintheSpecialwindow,Calculatetheexpectedvalueofduration(indays)usingthePERTconceptoftheexpecteddurationofatask
A8
B8.8
C9.1
D9.7
E10.5
QUESTUsingtheWBSintheSpecialwindow,aninstanceofaworkpackageis:
ABuildhouse
BExcavate
CPrepareFoundation
DBandC
ENoneoftheabove
QUESTAllofthefollowingarecategoriesofamilestoneinascheduleexcept:
AEnddate.
BContractdates.
CKeyeventsscheduled.
DImposeddates.
ETaskduration.
QUESTTheactualconfigurationofaPERT/CPMnetwork_____theamountofresourcesthatcanbedevotedtotheproject.
AIncreases.
BIsnotaffectedby
CDoesnotrequire
DIsheavilydependentupon
EIstheonlymeansofdetermining
QUESTExcessiveflexibilityinspecifyingrequirementswill_____thelikelihoodoftimeoverruns.
AReduce.
BEliminate.
CDouble
DIncrease
ENotaffect
QUESTThekeypurposeofprojectcontrolisto:
APlanaheadforuncertainties.
BGeneratestatusreports.
CKeeptheprojectontrack.
DDeveloptheprojectroadmap.
EAlloftheabove.
QUESTFasttrackingmeansto:
ASpeedupaprojectthroughparalleltasks.
BSwaponetaskforanother.
CReducethenumberoftasksifpossible.
DBandC.
QUESTAsaprojectiscarriedoutandslacktimeisconsumedonindividualtasks,theslackleftoverfortheremainingtasksis:
AInsignificant.
BReduced.
CUnchanged.
DIncreased.
EDoubled.
QUESTThepurposeofadummyactivityinanactivity-on-arrowdiagramisto:
AIdentifyataskthatcouldbereplacedbyanother.
BTaketheslacktimeintoaccount.
CShowataskthatisnotnecessarilyneeded.
DDenoteamilestone.
EShowadependencyrelationship.
QUESTOnNovember1,$1000worthofworkontaskAwassupposedtohavebeendone(BCWS);
however,theBCWPwas$850.Calculatetheschedulevariance:
A¥-100
B¥100
C¥-150
D¥150
E85%
QUESTAplanhasbudgetedthreeweeksofeffortforconsultants,butthejobwasdoneinonlytwoweeks.Calculatethevariance:
A1.50%
B33.00%
C75%
D67%
QUESTResourcelevelingwilloftenaffecttheprojectbymakingit:
AShorter.
BLonger
CMoreresponsivetocustomerneeds.
DAandC
EBandC.
QUESTUsingthefigureintheSpecialwindow,TheslacktimeinActivity"
G"
is_____weeks.
A2
B3
C4
D5
E7
QUESTUsingthefigureintheSpecialwindow,Activity"
D"
hasalateststarttimeof_____weeksandalatestfinishtimeof_____weeks.
A2,10
B4,12
C6,14
D7,15
E9,17
L"
hasanearlystarttimeof_____weeksandanearlyfinishtimeof_____weeks.
A11,13
B12,14
C13,15
D14,16
E15,17
QUESTUsingthefigureintheSpecialwindow,TheCriticalpathis_____weeks.
A21
B22
C23
D24
E25
QUESTUsingthedatashownintheSpecialwindow,ActivitiesP,Q,andTarecriticalpathactivities.Inorderto
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- pmp 美国 项目 管理 考试 模拟 答案