7.1-1Asupplynodeisanodewherethenetamountofflowgeneratedisafixedpositivenumber.Ademandnodeisanodewherethenetamountofflowgeneratedisafixednegativenumber.Atransshipmentnodeisanodewherethenetamountofflowgeneratedisfixedatzero.
7.1-2Themaximumamountofflowallowedthroughanarcisreferredtoasthecapacityofthatarc.
7.1-3Theobjectiveistominimizethetotalcostofsendingtheavailablesupplythroughthenetworktosatisfythegivendemand.
7.1-4Thefeasiblesolutionspropertyisnecessary.Itstatesthataminimumcostflowproblemwillhaveafeasiblesolutionifandonlyifthesumofthesuppliesfromitssupplynodesequalsthesumofthedemandsatitsdemandnodes.
7.1-5Aslongasallitssuppliesanddemandshaveintegervalues,anyminimumcostflowproblemwithfeasiblesolutionsisguaranteedtohaveanoptimalsolutionwithintegervaluesforallitsflowquantities.
7.1-6Networksimplexmethod.
7.1-7Applicationsofminimumcostflowproblemsincludeoperationofadistributionnetwork,solidwastemanagement,operationofasupplynetwork,coordinatingproductmixesatplants,andcashflowmanagement.
7.1-8Transportationproblems,assignmentproblems,transshipmentproblems,maximumflowproblems,andshortestpathproblemsarespecialtypesofminimumcostflowproblems.
7.2-1Oneofthecompany’smostimportantdistributioncenters(LosAngeles)urgentlyneedsanincreasedflowofshipmentsfromthecompany.
7.2-2Autoreplacementpartsareflowingthroughthenetworkfromthecompany’smainfactoryinEuropetoitsdistributioncenterinLA.
7.2-3TheobjectiveistomaximizetheflowofreplacementpartsfromthefactorytotheLAdistributioncenter.
7.3-1Ratherthanminimizingthecostoftheflow,theobjectiveistofindaflowplanthatmaximizestheamountflowingthroughthenetworkfromthesourcetothesink.
7.3-2Thesourceisthenodeatwhichallflowthroughthenetworkoriginates.Thesinkisthenodeatwhichallflowthroughthenetworkterminates.Atthesource,allarcspointawayfromthenode.Atthesink,allarcspointintothenode.
7.3-3Theamountismeasuredbyeithertheamountleavingthesourceortheamountenteringthesink.
7.3-41.Whereassupplynodeshavefixedsuppliesanddemandnodeshavefixeddemands,thesourceandsinkdonot.
2.Whereasthenumberofsupplynodesandthenumberofdemandnodesinaminimumcostflowproblemmaybemorethanone,therecanbeonlyonesourceandonlyonesinkinastandardmaximumflowproblem.
7.3-5Applicationsofmaximumflowproblemsincludemaximizingtheflowthroughadistributionnetwork,maximizingtheflowthroughasupplynetwork,maximizingtheflowofoilthroughasystemofpipelines,maximizingtheflowofwaterthroughasystemofaqueducts,andmaximizingtheflowofvehiclesthroughatransportationnetwork.
7.4-1Theoriginisthefirestationandthedestinationisthefarmcommunity.
7.4-2Flowcangoineitherdirectionbetweenthenodesconnectedbylinksasopposedtoonlyonedirectionwithanarc.
7.4-3Theoriginnowistheonesupplynode,withasupplyofone.Thedestinationnowistheonedemandnode,withademandofone.
7.4-4Thelengthofalinkcanmeasuredistance,cost,ortime.
7.4-5Sarahwantstominimizehertotalcostofpurchasing,operating,andmaintainingthecarsoverherfouryearsofcollege.
7.4-6When“realtravel”throughanetworkcanendatmorethatonenode,adummydestinationneedstobeaddedsothatthenetworkwillhavejustasingledestination.
7.4-7Quick’smanagementmustconsidertrade-offsbetweentimeandcostinmakingitsfinaldecision.
7.5-1Thenodesaregiven,butthelinksneedtobedesigned.
7.5-2Astate-of-the-artfiber-opticnetworkisbeingdesigned.
7.5-3Atreeisanetworkthatdoesnothaveanypathsthatbeginandendatthesamenodewithoutbacktracking.Aspanningtreeisatreethatprovidesapathbetweeneverypairofnodes.Aminimumspanningtreeisthespanningtreethatminimizestotalcost.
7.5-4Thenumberoflinksinaspanningtreealwaysisonelessthanthenumberofnodes.Furthermore,eachnodeisdirectlyconnectedbyasinglelinktoatleastoneothernode.
7.5-5Todesignanetworksothatthereisapathbetweeneverypairofnodesattheminimumpossiblecost.
7.5-6No,itisnotaspecialtypeofaminimumcostflowproblem.
7.5-7Agreedyalgorithmwillsolveaminimumspanningtreeproblem.
7.5-8Applicationsofminimumspanningtreeproblemsincludedesignoftelecommunicationnetworks,designofalightlyusedtransportationnetwork,designofanetworkofhigh-voltagepowerlines,designofanetworkofwiringonelectricalequipment,anddesignofanetworkofpipelines.
Problems
7.1a)
b)
c)
7.2a)
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 数据模型 决策 运筹学 课后 习题 案例 答案 007