杯口基础施工方案参考模板Word文档下载推荐.docx
- 文档编号:14947679
- 上传时间:2022-10-26
- 格式:DOCX
- 页数:16
- 大小:212.48KB
杯口基础施工方案参考模板Word文档下载推荐.docx
《杯口基础施工方案参考模板Word文档下载推荐.docx》由会员分享,可在线阅读,更多相关《杯口基础施工方案参考模板Word文档下载推荐.docx(16页珍藏版)》请在冰豆网上搜索。
内蒙荣信化工乙二醇项目经理部
2017年12月4日
1.编制依据................................................................................................................................................2
1.1工程概括............................................................................................................................................2
2.施工准备...............................................................................................................................................3
2.1技术准备............................................................................................................................................3
2.2施工材料准备....................................................................................................................................3
2.3安全技术准备....................................................................................................................................3
3.工艺流程...............................................................................................................................................4
4.主要工序的施工方法....................................................................................................................4
4.1土方工程............................................................................................................................................4
4.2模板工程............................................................................................................................................5
4.3钢筋工程............................................................................................................................................7
4.4混凝土工程........................................................................................................................................9
5.施工质量保证措施........................................................................................................................14
5.1施工方案审批制度..........................................................................................................................14
5.2技术复核、隐蔽工程验收制度......................................................................................................14
5.3技术质量交底制度..........................................................................................................................15
5.4现场材料质量管理..........................................................................................................................15
6.消除质量通病的具体措施........................................................................................................15
6.1蜂窝..................................................................................................................................................15
6.2麻面..................................................................................................................................................16
6.3孔洞..................................................................................................................................................17
6.4露筋..................................................................................................................................................17
7.施工安全措施..................................................................................................................................18
一、编制依据
《建筑工程施工质量验收规范统一标准》GB50300-2013;
《混凝土结构施工规范》GB50666-2011;
《建筑工程冬期施工规范》JGJT104—2011;
《建筑地基与基础工程施工质量验收规范》GB50202-2013;
中国五环工程有限公司提供的相关资料;
我公司有关类似工程施工经验;
1.1工程概况
内蒙古荣信化工有限公司年产40万吨煤制乙二醇及30万吨聚甲氧基二甲醚循环经济示范项目,位于达拉特经济开发区经七纬五路,占地669280㎡,总投资约76.92亿元。
乙二醇装置的界区范围从合格的原料气一氧化碳、氢气、氧气送入界区开始,至获得合格的乙二醇产品,主要包括DMO合成、DMO精制及水分离、CO循环气压缩、亚酯回收、DMO辅助工艺系统、乙二醇机柜间、乙二醇合成、乙二醇分离与精制、H2循环气压缩、氢回收、原料及副产品罐区和必须的辅助生产设施等单元。
工程名称:
内蒙古荣信化工有限公司年产40万吨煤制乙二醇及30万吨聚甲氧基二甲醚循环经济示范项目
建设单位:
内蒙古荣信化工有限公司
工程地点:
内蒙古自治区鄂尔多斯市达拉特旗达拉特经济开发区经七纬五路
总包单位:
中国五环工程有限公司
监理单位:
北京华旭工程项目管理有限公司
施工单位:
二、施工准备
2.1技术准备
1、组织施工技术人员熟悉图纸、施工工艺及有关技术规范,了解设计要求达到的技术标准、明确工艺流程。
2、将编制好且通过审批的《施工方案》作为作业指导书,与施工人员进行技术交底、组织人员学习。
3、对施工人员进行安全技术交底,做好充分的安全技术准备工作。
4、根据要求放线,并经检查复线。
2.2、施工材料准备
1、根据实际情况,对杯口基础施工中所需要的各种物资资源的生产和供应情况、价格、质量品种及运输路线等进行详细调查。
2、根据施工预算中的工料分析,编制工程所需要的材料用量计划及进场计划,作为备料、供料工作和确定堆场面积及运输依据。
3、根据材料需用量计划,做好材料的申请、订货和采购工作,使计划得到落实。
4、根据材料需用量计划做好构配件及材料的加工工作,并按现场的实际情况做好堆放和保管工作。
2.3、安全技术准备
1、因本工程多为杯口基础,工程施工时应将安全作为一项重点的工作来抓,在施工现场范围内,按安全及文明施工的有关规定搭设施工临时安全围栏、挂设安全警示牌。
2、对施工人员进行安全技术交底,明确在施工区域的安全规定,了解有关安全常识及规定。
三、工艺流程
土方开挖——修整基坑——垫层砼——基础承台及连系梁——基础钢筋绑扎——支杯基侧模、杯芯模板——钢筋隐检、模板预检——砼浇筑——拆除杯芯模板、侧模——砼养护
3.1、将基础十字控制线引到基槽下,做好控制桩,并核实其准确性。
3.2、垫层砼,振捣密实,表面抹平。
3.3、利用控制桩放施工控制线、基础边线到垫层面,复查地基垫层标高及中心线位置,无误后,并绑扎基础钢筋。
3.4、将垫层内的小木块等杂物清理干净,模板缝接缝严密。
垃圾,碎砼块要清理干净后浇筑、自下往上支杯基第一层,第二层外侧模板并加固,外侧模板一般加固结实。
3.5、模板矫正,并整体加固。
3.6、分层浇筑砼。
浇筑砼时,须防止杯芯模板向上浮或向四周偏移,注意控制坍落度及浇筑下料速度,在砼浇到高于上层侧模50左右时,稍作停顿,于砼初凝前,接着在杯芯四周对称均匀下料振捣。
特别注意砼必须连续浇筑,在砼分层时须把握好初凝时间,保证基础的整体性。
3.7、基础施工中每一个步骤前需经总包商和监理共同认可后方可进行施工,基础
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 基础 施工 方案 参考 模板