建筑工程施工进度计划表表格文件下载.xls
- 文档编号:13046273
- 上传时间:2022-10-03
- 格式:XLS
- 页数:8
- 大小:40.50KB
建筑工程施工进度计划表表格文件下载.xls
《建筑工程施工进度计划表表格文件下载.xls》由会员分享,可在线阅读,更多相关《建筑工程施工进度计划表表格文件下载.xls(8页珍藏版)》请在冰豆网上搜索。
建筑工程施工进度计划表序号分部分项工程名称工程量时间定额劳动量每天工作班数每班工作人数工作延续天数施工进度单位数量计划数采用数10/110/210/310/410/510/610/710/810/910/1010/1110/1210/1310/1410/1510/1610/1710/1810/191基基础础工工程程人工挖土m3327.50.28593.309412442混凝土垫层m369.11.789123.6012412163砖砌基础m384.10.67857.025811544地圈梁施工m322.94.560104.4210411765基槽、房心回填土m3326.20.22071.767211841架设塔吊、脚手架1一一层层主主体体结结构构砌砖墙m3165.61.120185.52186119102圈梁、构造柱、雨篷支模m282.660.0806.6171423现浇圈梁、构造柱、板、雨蓬等m327.924.560127.3212711684吊楼板、灌缝块220.80.07616.78171545圈梁、构造柱、雨蓬拆模m282.660.0262.1521321二二层层主主体体结结构构砌砖墙m3165.61.120185.52186119102圈梁、构造柱,雨篷支模m282.660.0806.6171423现浇圈梁、构造柱、板、雨蓬等m327.924.560127.3212711684吊楼板、灌缝块220.80.07616.78171545圈梁、构造柱、雨蓬拆模m282.660.0262.1521321三三层层主主体体结结构构砌砖墙m3165.61.120185.52186119102圈梁、构造柱、雨篷支模m282.660.0806.6171423现浇圈梁、构造柱、板、雨蓬等m327.924.560127.3212711684吊楼板、灌缝块220.80.07616.78171545圈梁、构造柱、雨蓬拆模m282.660.0262.1521321四四层层主主体体结结构构砌砖墙m3165.61.120185.52186119102圈梁、构造柱、雨篷支模m282.660.0806.6171423现浇圈梁、构造柱、板、雨蓬等m327.924.560127.3212711684吊楼板、灌缝块220.80.07616.78171545圈梁、构造柱、雨蓬拆模m282.660.0262.1521321五五层层主主体体结结构构砌砖墙m3165.61.120185.52186119102圈梁、构造柱、雨篷支模m282.660.0806.6171423现浇圈梁、构造柱、板、雨蓬等m327.924.560127.3212711684吊楼板、灌缝块220.80.07616.78171545圈梁、构造柱、雨蓬拆模m282.660.0262.1521321屋屋面面工工程程找平层m2483.30.04320.782111122冷油、防水层m2483.30.04019.332011023架空隔热层m3/块5/17282.3/0.006923.422411221五五层层装装修修工工程程钢门安装樘80.2502.0021322木门、铝合金窗安装樘/扇56/840.05/0.1112.04121623地面垫层、楼地面m3/m25.2/407.60.89/0.0629.05291744板底嵌缝、内墙抹灰m214430.101145.7014611885楼梯钢栏杆安装吨0.16注:
@#@3.2d3.2041326楼梯抹灰m238.960.5320.652111027门、栏杆、扶手油漆m2199.80.059.99101528安装玻璃m299.40.0919.0591529外墙装修(白色水刷石,阳台栏板贴彩绿色玻璃马赛克)m2306.30.23672.297211841四四层层装装修修工工程程钢门安装樘80.2502.0021322木门、铝合金窗安装樘/扇56/840.05/0.1112.04121623地面垫层、楼地面m3/m25.2/407.60.89/0.0629.05291744板底嵌缝、内墙抹灰m214430.101145.7014611885楼梯钢栏杆安装吨0.16注:
@#@3.2d3.2041326楼梯抹灰m238.960.5320.652111027门、栏杆、扶手油漆m2199.80.059.99101528安装玻璃m299.40.0919.0591529外墙装修(白色水刷石,阳台栏板贴彩绿色玻璃马赛克)m2306.30.23672.297211841三三层层装装修修工工程程钢门安装樘80.2502.0021322木门、铝合金窗安装樘/扇56/840.05/0.1112.04121623地面垫层、楼地面m3/m25.2/407.60.89/0.0629.05291744板底嵌缝、内墙抹灰m214430.101145.7014611885楼梯钢栏杆安装吨0.16注:
@#@3.2d3.2041326楼梯抹灰m238.960.5320.652111027门、栏杆、扶手油漆m2199.80.059.99101528安装玻璃m299.40.0919.0591529外墙装修(白色水刷石,阳台栏板贴彩绿色玻璃马赛克)m2306.30.23672.297211841二二层层装装修修工工程程钢门安装樘80.2502.0021322木门、铝合金窗安装樘/扇56/840.05/0.1112.04121623地面垫层、楼地面m3/m25.2/407.60.89/0.0629.05291744板底嵌缝、内墙抹灰m214430.101145.7014611885楼梯钢栏杆安装吨0.16注:
@#@3.2d3.2041326楼梯抹灰m238.960.5320.652111027门、栏杆、扶手油漆m2199.80.059.99101528安装玻璃m299.40.0919.0591529外墙装修(白色水刷石,阳台栏板贴彩绿色玻璃马赛克)m2306.30.23672.297211841一一层层装装修修工工程程钢门安装樘80.2502.0021322木门、铝合金窗安装樘/扇56/840.05/0.1112.0412162四四层层装装修修工工程程3地面垫层、楼地面m3/m25.2/407.60.89/0.0629.05291744板底嵌缝、内墙抹灰m214430.101145.7014611885楼梯钢栏杆安装吨0.16注:
@#@3.2d3.2041326楼梯抹灰m238.960.5320.652111027门、栏杆、扶手油漆m2199.80.059.99101528安装玻璃m299.40.0919.0591529外墙装修(白色水刷石,阳台栏板贴彩绿色玻璃马赛克)0306.30.23672.297211841散水m2120.70.1214.48151822明沟、道路m/m2113/1360.5/0.283.708411463拆塔吊一一层层装装修修工工程程10/2010/2110/2210/2310/2410/2510/2610/2710/2810/2910/3010/3111/1