AppendixD
(NormativeAppendix)
HandoverTechnicalDocumentation—PipingInstallation
S/N
Description
No.
Page
D.1
PipingComponentsVerificationInspection&AdditionalTest
SH/T3503-J401
245
D.2
ValvesTestConfirmationForm
SH/T3503-J402
246
D.3
SpringHangersandSupportsInstallationInspectionRecord
SH/T3503-J403
247
D.4
Sliding/FixedPipeBracketsInstallationInspectionRecord
SH/T3503-J404
248
D.5
PipingExpansionJointsInstallationInspectionRecord
SH/T3503-J405
249
D.6
RecordofPipingSystemPressureTestandTestConditionConfirmation(I)
SH/T3503-J406-1
250
D.7
RecordofPipingSystemPressureTestandTestConditionConfirmation(Ⅱ)
SH/T3503-J406-2
251
D.8
RecordofPipingSystemLeakage/VacuumTestandTestConditionConfirmation
SH/T3503-J407
252
D.9
PipelinePurgingandCleaningInspectionRecord
SH/T3503-J408
253
D.10
RecordofPressureTestandTestConditionConfirmationforPressureWaterSupplyandSewingPipeline
SH/T3503-J409
254
D.11
RecordofWatertightTestandTestConditionConfirmationforNon-pressureWaterSupplyandSewingPipeline
SH/T3503-J410
255
D.12
PipelineWeldingJointsHeatTreatmentReport(I)
SH/T3503-J411-1
256
D.13
PipelineWeldingJointsHeatTreatmentReport(II)
SH/T3503-J411-2
257
D.14
PipelineWeldingJointsRadiographicExaminationRateConfirmationForm(I)
SH/T3503-J412-1
258
D.15
PipelineWeldingJointsRadiographicExaminationRateConfirmationForm(II)
SH/T3503-J412-2
259
D.16
PipelineStaticEarthingTestRecord
SH/T3503-J413
260
D.17
PipelineMaterialIssuanceSchedule
SH/T3503-J414
261
1
2
3
4
SH/T3503-J401
管道组成件验证性和补充性检验记录
PipingComponentsVerificationInspection&AdditionalTest
工程名称:
Project:
单元名称:
Unit:
S/N
Componentsconditions
InspectionRecord
Description
Qualitycertificate
Specification
Material
Qty
Inspectionitems
SpotinspectionQty
InspectionReportNo.
Result
OriginalNo.
InteralNo.
Owner/ConstructionSupervisionContractor
GeneralContractor
ConstructionContractor
Disciplineengineer:
Date:
Disciplineengineer:
Date:
Disciplineengineer:
SH/T3503-2007
Qualityinspector:
Constructionforeman:
Date:
5
6
7
107
109
8
9
10
SH/T3503-200×
SH/T3503-200×
245
SH/T3503-2007
246
SH/T3503-J402
阀门试验确认表
ValvesTestConfirmationForm
工程名称:
Project:
单元名称:
Unit:
Description
Model
Specification
Nominalpressure
MPa
Qty
TestItem
Testingrecordfromserialnumber
Result
Remarks
Pressuretest
Sealtest
Backsealtest
Owner/ConstructionSupervisionContractor
ProjectManagementContractor
TestingContractor
Disciplineengineer:
Date:
Disciplineengineer:
Date:
Disciplineengineer:
Qualityinspector:
Calibratedby
Date:
SH/T3503-J403
弹簧支/吊架安装检验记录
SpringHangersandSupportsInstallationInspectionRecord
工程名称:
Project:
单元名称:
Unit:
PipelineNo.
Typeofstructure
Position
Displacementdirection.
Designedcapacity
kN
Coldloadreading
mm
Heatloadreading
mm
Remarks:
Owner/ConstructionSupervision
Contractor
GeneralContractor
ConstructionContractor
Disciplineengineer:
Date:
Disciplineengineer:
Date:
Disciplineengineer:
Qualityinspector:
Constructionforeman:
Date:
SH/T3503-J404
滑动/固定管托安装检验
记录
Sliding/FixedPipeBracketsInstallationInspectionRecord
工程名称:
Project:
单元名称:
Unit:
PipelineNo.
Specification
BracketNo.
Mode
Displacementdirection
Result
Note:
Thisformisapplicabletotheinstallationinspectionofsliding/fixedbracketofpipelinewithdesigntemperatureover350℃andpipelineoflowerdesigntemperature.
Remarks:
Owner/ConstructionSupervisionContractor
GeneralContractor
ConstructionContractor
Disciplineengineer:
Date:
Disciplineengineer:
Date:
Disciplineengineer:
Qualityinspector:
Constructionforeman:
Date:
SH/T3503-J405
管道补偿器安装检验记录
PipingExpansionJointsInstallationInspectionRecord
工程名称:
Project:
单元名称:
Unit:
PipelineNo.
Expansion
jointsNo.
Mode
Specification
Material
Fixingsupportsspacing
m
Designpressure
MPa
DesignTemp
℃
AmbientTemp
℃
Unil
Axial/angle
pre-deformation
Remarks
Designvalue
Actualvalue
Sketch:
Owner/ConstructionSupervisionContractor
GeneralContractor
ConstructionContractor
Disciplineengineer:
Date:
Disciplineenginee:
Date:
Disciplineengineer:
SH/T3503-2007
Qualityinspector:
Foreman:
Date:
249
SH/T3503-J406-1
管道系统耐压试验条件
确认与试验记录
(一)
RecordofPipingSystemPressureTestandTestConditionConfirmation(I)
工程名称:
Project:
单元名称:
Unit:
Description
SystemNo.
Inspectionitemsandrequirements
Result
Pipeinstallationshallbeincompliancewithdesigndocumentandspecification.
Pipelinecomponentshavebeenre-inspectedandareacceptable.
Welderscompleteoperationrecordsareavailable.
NDEresultsshallbeincompliancewithdesigndocumentandspecification.
PWHTresultsshallbeincompliancewithdesigndocumentandspecification.
Supportsandhangersshallbecorrectlyinstalled.
Identificationsonmaterialofalloysteelpipelineareclear.
Safetyattachmentsandinstrumentsnotinvolvedintesthavebeendismantledorisolatedasperrequirement,allsystemvalvesinvolvedintesthavebeenopened.
Temporaryreinforcementmeasures,blindpositionsandmarkingsshallbeincompliancewithconstructionplan.
Scale,accuracyandcalibrationstateoftestusepressuregaugeshallbeincompliancewithspecification.
Testusewaterofstainlesssteelpipelineshallbeincompliancewithspecification.
Testrecord
PipelineNo.
Designpressure
MPa
DesignTemp.
℃
TestambientTemp.
℃
Testmedium
TestmediumTemp.℃
Testpressure
ofpressuretest
MPa
Tightnesstestpressure
MPa
Owner/ConstructionSupervision
Contractor
GeneralContractor
ConstructionContractor
Disciplineengineer:
Date:
Disciplineengineer:
Date:
Disciplineengineer:
Qualityinspector:
Constructionforeman:
Date: