第一章工程概况
化工园内企业产生的化工废水,经企业预处理装置处理达到污水处理厂进水标准后,排入污水管网,经管网收集汇流至污水处理厂,在污水处理厂内经化工废水经预处理后与污水厂内生活污水一起进行生化处理。
第二章设计依据、原则和范围
一、设计依据
(1)、《城镇污水处理厂污染物排放标准》(gb18918-20XX)。
(2)、政府及环保部门的有关文件精神。
(3)、有关给水排水设计规范。
(4)、国内城市污水处理现状和经验。
(5)、已有城市污水处理厂的运转状况。
(6)、通盘考虑,逐步实施,规范设计。
(7)、潍坊海洋化工高新技术产业开发区污水处理厂工程可行性研究报告。
(8)、《环境工程设计手册(水污染防治卷)》。
(9)、《建筑给水排水设计规范》(gbJ15-88)(10)、《给水排水工程结构设计规范》(gbJ69-84)。
(11)、《水工混凝土结构设计规范》(sDJ20-78)。
(12)、《建筑抗震设计规范》(gbJ11-89)。
(13)、《工业与民用供配电系统设计规范》(gb50052-92)。
2.2设计原则
①、执行国家关于环境保护的政策,符合国家的有关法规\规范及标准。
②、采用先进可靠的处理工艺,设备选型合理、可靠、先进。
③、符合政府及环保部门的治理要求。
④、采用成熟合理的治理技术和优化工艺,减少投资和运转费用。
⑤、操作.维修.管理方便,稳定运行。
⑥、尽量减少占地面积。
⑦、着眼于未来,总体规划逐步实施。
2.3设计范围
潍坊海洋化工高新技术产业开发区生活污水和临港化工园化工废水处理工程设计方案。
具体如下:
1.工程主要构筑物计算说明;
2.污水处理改造工程平面、高程设计;3.污水处理工程电气自动控制设计;4选用与本工程相配套的污水处理设备。
第三章、规模及处理后的标准
一、设计处理规模
根据科研报告的要求,该污水处理厂设计处理能力为10000吨/日,即:
Q=10000吨/日=416.7吨/时≈420吨/时。
二、设计指标
根据科研报告的内容确定设计进水指标如下:
表污水处理厂设计进水水质
开发区污水处理厂二级处理出水其受纳水体为围滩河,围滩河最终流入弥河,弥河水最终排入渤海湾。
污水处理厂最终出水水质标准应执行《城镇污水处理厂污染物排放标准》(gb18918-20XX)中的二级标准,其出水水质主要指(:
化工项目可行性报告)标为:
表污水处理厂设计进水水质和排放标准
第四章.污水处理厂工艺设计
设计中考虑到近远期相结合,污水处理厂建构筑物设计按照:
1万m3/d进行设计,同时预留2万m3/d、3万m3/d建设用地。
4.1污水、污泥处理工艺
工艺选择:
结合我公司的实际工程经验,确定主体生化工艺采用A/o法,结合本工程的建设规模、进水特性、处理要求和维护管理,以及工程的实施、资金筹措等情况,参照国内外的研究成果和各种工艺的技术经济性能定量化指标,以及引进技术的消化、吸收、设备国产化配套程度和已建成污水处理厂的运行经验,特别从工程投资、运行费用等方面考虑,经过比较、分析,本套方案“o段”采用悬链曝
气生物处理工艺。
其工艺流程方框图如下所示:
进水
滤液
回流污泥
剩余污泥
图
工艺流程方框图
第五章构筑物设计
本方案设计按照一期1万m3/d进行设计,污水量变化系数采用:
K总=1.6。
1污水处理单元
1.1进水井、粗格栅间
厂内设进水井一座,与进水干管相连,进水井内设有厂区污水排入口、闸门等。
其平面尺寸为6.6米×3.5米,设置两个闸门,分别对应两条格栅渠道,一用一备。
设备参数:
铸铁方闸门
型号:
KY-800数量:
4套
粗格栅间采用轻钢雨棚结构,内安装有机械粗格栅和螺旋压榨机等设备,其平面尺寸为9米×6米。
粗格栅70°倾斜安装,根据时间间隔或格栅前后水位差自动启闭机械栅耙,并联动螺旋输送机机,完成栅渣的收集、输送和装箱。
主要设备参数:
机械粗格栅
栅条宽度0.8m栅条间隙15mm栅前水深0.7m
过栅流速0.5~1.0m/s配套电机1.5kw格栅倾角α=70°
数量:
2套(一用一备)螺旋输送机机
处理能力5m3/h功率n=2.2kw数量1套起重设备
起重量6T数量1套
格栅材质:
水下部分为不锈钢,水上部分为碳钢,涂料防腐。
1.2提升泵房
污水处理厂平均设计流量一期Qave=416立方米/小时,进水泵站最大设计流量一期Qave=666立方米/小时。
进水泵站采用地下现浇钢筋混凝土结构,其平面尺寸:
6.0米×10.0米。
预设三台自耦式无堵塞离心潜水泵基础,两用一备,一台常开其中一台采用变濒控制,当进水流量变化时,水泵可根据水位变化,调节出水流量,使水泵的运行经常处于最佳工作状态,以节省用电。
主要控制方式根据吸水池水位变化,由pLc自动控制。
主要设备参数:
潜污泵
型号:
200wQ300-10-15流量:
400m3/h扬程:
8m功率:
15Kw
数量:
3台(两用一备)起重设备1套起重量2T
1.3细格栅间
细格栅间采用轻钢结构,内部安装有旋转细格栅和螺旋栅渣输送机等设备,细格栅间的平面尺寸:
9.0米×9.0米。
旋转细格栅为卧式滚筒结构,采用摆线针轮减速机、弹性柱销联轴器传动。
主要设备参数:
☆旋转细格栅
栅条间隙1mm配套电机2.2kw数量2台☆螺旋输送机
篇二:
中国石油炼油化工建设项目可行性研究报告编制规定(20XX年版)
中国石油炼油化工建设项目可行性研究报告编制规定
(20XX年版)
中国石油天然气集团公司
20XX年4月
目次
第一部分总则························································································································1第二部分编制规定················································································································3123456789101112131415161718192021222324
总论·····································································································································3市场分析与价格预测·········································································································6原料、辅助材料及燃料供应·····························································································9建设规模、产品方案及总工艺流程···············································································12工艺装置···························································································································16自动控制与信息工程·······································································································24厂址选择···························································································································28总图运输及土建···············································································································31储运···································································································································38公用工程及辅助生产设施·····························································································42节能·································································································································64节水·································································································································67消防·································································································································69环境保护·························································································································71职业安全卫生·················································································································78组织机构及人力资源配置·····························································································80项目实施计划及招标·····································································································82投资估算及融资方案·····································································································85财务分析·························································································································89经济分析·························································································································93区域经济与宏观经济影响分析·····················································································95社会效益分析·················································································································95风险与竞争能力分析·····································································································96结论与建议·····················································································································96
附件目录··································································································································99附图目录··································································································································99
1
第一部分总则
1.为提高中国石油炼油化工建设项目投资效益,进一步加强建设项目的前期工作,规范可行性研究报告的编制,特制定《中国石油炼油化工建设项目可行性研究报告编制规定(20XX年版)》(以下简称《编制规定》)。
2.本《编制规定》适用于中国石油炼油化工新建和改、扩建项目可行性研究报告的编制。
当项目建议书或预可行性研究报告按本《编制规定》编制时,可适当简化,但应侧重于对项目建设必要性和基本建设条件的论述。
对于投资额度较小、项目建设内容比较简单、市场比较落实的项目,也可按本《编制规定》进行适当简化。
炼油化工试验项目可参照执行。
3.当项目内有跨行业的单项工程时,可行性研究报告中相应部分应执行所跨行业的相关标准及规定。
4.项目建设(主办)单位应委托有相应资质的单位承担可行性研究报告的编制。
当有两个以上编制单位时,应确定主编单位,由主编单位确定可行性研究报告的成册编制规定。
项目建设(主办)单位或项目法人应配合编制单位的工作,提供相应的文件和资料并对其准确性、有效性和完整性负责。
5.进行可行性研究应遵循国家产业政策和中国石油发展战略,重视节约资源、保护环境和安全生产,大力发展循环经济;以市场为导向,以提高项目竞争力和投资回报率为主要目标,坚持科学、客观和公正的原则,全面和客观反映研究过程中的不同意见和项目存在的主要问题,以确保可行性研究的科学性和严谨性。
6.可行性研究报告应符合国家、地方和行业的相关法律、法规和政策,符合中国石油相关规定和要求,符合相关标准和规范。
可行性研究的依据主要有:
预可行性研究报告或项目建议书及其批复文件、建设(主办)单位的委托函以及与项目相关的文件。
7.可行性研究报告应从技术经济角度进行多方案综合比选,并提出推荐方案。
可行性研究报告应加强市场分析,尤其要强化产品在目标市场竞争力的分析。
可行性研究报告还应从多方面对项目风险进行分析,提出规避风险的措施。
若项目产品目标市场分析和(或)专有工艺技术内容有保密要求的,可单独成册。
8.可行性研究报告的财务分析要根据中国石油下发的《建设项目经济评价方法与参数》和本《编制规定》执行。
对环境保护、劳动安全卫生、试验项目和一些产品质量
1
升级等直接效益难以定量测算的建设项目,原则上应进行费用效果分析,如果从技术角度难以设计两个以上备选方案时,可只进行投资和成本合理性分析。
9.一般项目可以不做“经济费用效益分析”、“区域经济与宏观经济影响分析”和“社会评价”,但对国民经济影响大、中外合资的重大项目以及带有基础性、公益性的项目,应按主管部门要求进行相应的评价。
10.改扩建项目的可行性研究,应对拟利用的主要装置和设备的能力进行标定,对现有公用工程、辅助设施的能力和依托情况进行说明,对拟利旧的固定资产应提供帐面价值(净值、原值),当涉及资产转移时应提供资产评估报告。
11.中外合资、合作等利用外资的项目,可行性研究报告编制内容除符合本《编制规定》外,还应反映合资(合作)各方的情况、资信,项目的合作方式、经营管理体制、收益分配、债务承担和产品销售等方面达成的协议。
对国内配套部分应明确配套服务方式。
12.原则上大中型建设项目可行性研究报告中的“投资估算与经济评价”应单独成册。
13.批准的可行性研究报告,即为初步设计(或基础设计)必须遵循的依据,项目的建设规模、工艺路线、产品方案和采用的主要标准及规范等不得任意改变,但采用的主要标准和规范如果进行了修订并已发布实施,其修订版即为初步设计(或基础设计)必须遵循的依据。
可行性研究报告批复后,若超过2年才实施,或建设内容发生重大变化,或总投资变化额超过原估算值的10%,必须对其及时修改补充或重新编制。
14.实行政府核准制或备案制的项目,项目可行性研究报告须与项目申请报告内容保持一致。
15.本《编制规定》发布后,原《中国石油天然气股份有限公司炼油化工建设项目可行性研究报告编制规定》(试用版)同时废止。
16.本《编制规定》由中国石油规划计划部归口管理。
2
第二部分编制规定
1总论
1.1项目及建设(主办)单位基本情况
1.1.1项目基本情况
1)项目名称列出项目全称。
2)项目建设性质
简述项目类型(新建或改建、扩建);投资类型(全资、控股或参股)及构成;经营体制及管理机制。
3)项目建设地点
1.1.2建设(主办)单位基本情况
1)建设(主办)单位名称、性质及负责人
列出建设(主办)单位全称、企业性质及负责人姓名,负责人指行政负责人或法人代表。
对合资、合作项目,应注明项目各方单位全称、注册国家、法定地址、法人代表及国籍。
2)建设(主办)单位概况
简述建设(主办)单位概况,应包括上一年生产装置及生产能力、原料供应、产品销售、员工状况、资本结构、资产负债、损益状况以及企业目前存在的主要生产经营问题。
合资、合作项目,除列出合资、合作各方的上述情况外,根据合作进展情况,还可列出协议要点、出资比例、经营方式、管理机构、利益分配及债务承担等。
凡改建、扩建项目的可行性研究报告审批时,应附上对原装置的标定报告和瓶颈分析。
1.1.3项目编制单位资质
说明项目编制单位主要资质情况,附编制单位资质证书。
1.2编制依据及原则
1.2.1编制依据
列出作为主要编制依据的文件名称、编制和批准单位、文号和日期。
主要编制依
3
篇三:
化工生产项目可行性研究报告
化工生产项目可行性研究报告
(此文档为word格式,下载后您可任意修改编辑!
)
第1章总论
1.1概述
1.1.1项目名称及建设单位
项目名称:
新建1500t/a硝酸、2000t/a硫酸、1000t/a氢氟酸、800t/a氨水、300t/a异丙醇、300t/a丙酮、300t/a无水乙醇、1000t/a阻垢剂、50t/a杀菌剂、300t/a清洗剂项目
建设规模:
1500t/a硝酸、2000t/a硫酸、1000t/a氢氟酸、800t/a氨水、300t/a异丙醇、300t/a丙酮、300t/a无水乙醇、1000t/a阻垢剂、50t/a杀菌剂、300t/a清洗剂生产线、厂房、办公及分析楼、公用工程及其他辅助设施等。
建设单位:
某某化工有限公司建设地点:
某某临港化工园建设性质:
新建
行业类别:
化学原料及化学制品制造业建设单位法人:
吕某某1.1.2编制依据及编制原则1.1.2.1编制依据
(1)某某化工有限公司与徐州锦丰工程咨询有限公司的可行性研究报告编制合同;
(2)某某化工有限公司提供的设计基础数据资料;
(3)原化学工业部化计发(1997)426号文《化工建设项目可行性研究报告内容和深度规定》;
(4)《建设项目经济评价方法与参数》(第二版);(5)《化工“十三五”规划》(国家经贸委20XX年颁布);1.1.2.2编制原则
(1)严格遵守国家、行业和地方的法律、法规、标准规定,高度重视环境保护,认真落实各项环保措施,贯彻“三同时”的精神。
(2)严格遵守国家、行业和地方的法律、法规、标准规定,高度重视
安全和职业卫生防护,保障劳动者身体健康,加强劳动设施的设计。
(3)设计中要采用成熟、可靠、先进、合理的技术,保证产品质量,保证工艺上先进,技术上合理,经济上可行,重视节能降耗,以提高经济效益。
(4)“三废”排放量控制满足国家有关法律、法规的要求。
(5)认真执行国家的法律、法规、标准规范,重视消防设施的建设。
1.1.3编制的范围及内容
着重分析1500t/a硝酸、2000t/a硫酸、1000t/a氢氟酸、800t/a氨水、300t/a异丙醇、300t/a丙酮、300t/a无水乙醇、1000t/a阻垢剂、50t/a杀菌剂、300t/a清洗剂新建项目装置建立的重要性和必要性,并综合评价其社会效益、经济效益和环境效益。
在市场需求预测、建设规模、产品方案、厂址选择、工艺流程、工艺技术方案等方面评价的基础上,对项目选择技术的先进性、可靠性及经济上的可行性得出分析结果。
对公用工程及辅助设施的配套及合理性做出分析评价。
对项目的技术经济进行客观评价。
1.1.4项目建设的背景
硫酸、硝酸、氢氟酸、氨水、异丙醇、丙酮、无水乙醇等是重要的基础化工原料。
硫酸是化学工业中重要的产品,主要用于制造无机化学肥料,其次作为基础化工原料用于有色金属的冶炼、石油精炼和石油化工、纺织印染、无机盐工业、某些无机酸和有机酸、橡胶工业、油漆工业以及国防军工、农药医药、制革、炼焦等工业部门,此外还用于钢铁酸洗。
硝酸可供制氮肥、王水、硝酸盐、硝化甘油、硝化纤维素、硝基苯、梯恩梯、苦味酸等。
氢氟酸可以用来蚀刻玻璃以及制氟化合物。
氨水可以用于制药工业,纱罩业,晒图,农业施肥等。
异丙醇是重要的化工产品和原料,主要用于制药、化妆品、塑料、香料、涂料等。
阻垢剂、杀菌剂以及清洗剂是重要的水处理化学品。
阻垢剂是用于控制反渗透系统中沉淀结垢及减少堵塞。
杀菌剂是用以去除反渗透膜表面由于胶
体及微生物引起的污染物。
清洗剂是用以去除反渗透膜表面由于胶体及微生物引起的污染物。
近几年来,由于国内外化工产业的发展,从而使得对这些化工基础原料的需求量成倍的增长,所以有很大的销售空间。
1.1.5项目建设地点介绍
项目选址于某某临港产业园区,产业园位于连云港市灌云县燕尾港镇。
灌云县位于连云
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 化工 项目 可行性报告