1StructureWorks
1.1SiteSurvey
Generalinformation
Thisprojectismadeof1269setsvillas.Mostvillasare2layersandpartsare3layers.
Enteringsite
Beforeconstructing,withthehelpofthesurveyengineersentbytheclient,themapofplanecontrolpoint,coordinate,locationofpoint,elevationandthesurveypositionsystemsthatareofferedbytheclientshouldbereceived.
Togetcorrectlyconditionsofthecontrolpointandsurveypositionsystem,theplanecontrolnetworkshouldbechecked,whichisofferedbytheclient.Whenchecking,GPSandElectronicTacheometercanbeused,andrigorousadjustmentmustbeadopted.Thecheckedresultshouldbereporttotheclientandsupervisorengineer.
Erectionofthesitecontrolnetwork
Erectionofthehorizontalcontrolnetwork
Accordingtohorizontalcontrolpointofferedbytheclient,awholehorizontalcontrolnetworkinsiteshouldbeerect.Theerectionofthehorizontalcontrolnetworkshouldbedividedintothefirstclassandthesecondclass.AdoptGPStoerectthefirstclasscontrolpointevery300mandadoptElectronicTacheometertoerectthesecondclasspointevery100m.Theadjustmentshouldberigorous.
Erectionoftheelevationcontrolnetwork
Accordingtoelevationcontrolpointofferedbytheclient,3levelingpointsshouldbeerectatrightplaceinsite.Annexedlevelingshouldbeadoptedtoachievetheelevationofthethreecontrolpointsandtheothersinotherfield.Sotheelevationofcontrolpointsiscoherent.Transfertheheightsystemofthecontrolpointstoworkingfieldtocontrolconstruction.Thesecondhorizontalcontrolpointcanbeaccordancewiththeelevationcontrolpoint.Theerrorshouldbefittothelocatecriterion.
Constructionsurvey
Erectionofthebuildinghorizontalcontrolnetwork
Accordingwiththesecondstephorizontalcontrolnetwork,erectconstructionaxiscontrolnetworkofeverybuilding,andpairsofcontrolpointsmustbetheonlyform.Thecontrolpointsshouldbe500mor1000mawayfromaxis.
Erectionofthebuildingelevationcontrolnetwork
Accordingwiththeelevationcontrolpoints,adoptannexedlevelingtoerectbuildingelevationpointstocontrolverticalconstruction.
Foundationconstructionsurvey
Duetoisolatefoundationpitisnotverydeep,soleadtheaxialcontrolnetworkthathadbeenerectedtofoundationpitandchecktherelationbetweentheaxis.Iftherelationiscorrect,finepartline,excavationline,columnlocationlineandcontrollinecanbelayout.Throughelevationcontrolpointongroundwithlevelinginstrument,elevationoffoundationpitandfoundationconstructioncanbecontrolled.
Constructionsurveyofstructureontheground
whentheconstructionheightachievetoheight±0.000,theaxisshouldbelayout.Checkitandlayouttheaxistothecolumnandabovefloor.
Lineouttheheight
Oneverybuilding,measurelevelline1.00mfromthefirstfloorverticalstructure,markthreepointsonthisline,drawrulerfromthesethreepointstoformrelativethreepointswhenconstructionisonthetopofthestructure,collatetheelevationpointthathadbeentransferredfromthefirstfloorbeforeleveling.Iftherelationofthepointstransferrediscorrect,leadhorizontalline1.00mtooutsideofthestructureaccordingwithelevationoftheaveragepointtocontrolconstructionofplanestructureofeveryfloor.
Finishingandequipmentinstallationsurvey
Leadaxisofstructureconstructiontooutsideconstructionandmakemarks,whichwillcontroloutsideinstallation.Everyroomofconstructionshouldbemade“+”lineonground,eachwallandceiling,whichwillcontrolinsideinstallation.
Surveyors
Becausethisprojectishuge,thesurveyworkloadisbigandthetimelimitforaprojectisshort,professionalsurveyengineersandcomparativesurveyorswillbeneeded.
1.2Formwork
Selectionofformworksystem
Accordingtothecharacterofthisprojectconstruction,steelformisusedincolumnsandwoodformisusedinbeamsandboards.
Theformmaterialsandrequirementsmustconformtothespecification.
Formworkconstruction
Foundationformwork
Theinstallationproceduresareasfollows:
Leveling→Settingout→brushthereleaseagent→Erectingtheformworkfromthemiddlesection→Erectingthehorizontalribanddiagonalbrace→Settinguptheshoringshelf→Checkingandre-adjusting
Theformworkoffoundationchoosessmallsteelformtoassemble.Thesketchofformworkseebelow:
Columnformwork
Theinstallationproceduresareasfollows:
Leveling→settingout→columnformadvancedassembly→brushreleaseagent→columnreinforcementinstallation→formfixing→adjustformverticality→setupbraceandshoring→checkandrectify
Thiscolumnformworkchoosesthetunablesteelform,rectangularcolumnfrom600mmto850mmwilluseoneformtype,thelongsideofformcanchangefromleast600mmtolargest850mm.Therectangularcolumnfrom1000mmto1250mmwilluseoneformtype.135°and90°columnformworkarealsosimilar.Thesketchseebelow:
Thecirclecolumnformworkchoosessteelform.Pleaseseebelow:
HorizontalFormwork
InstallationProcedure
Measuringtheelevationofbeamandslab→Settingtheshoringshelf→Erectingtheverticalandhorizontalrib→Erectingthebottomformofbeam→Bindingthesteelbarofbeam→Erectingthesideformofbeam→erectingslabform→brushthereleaseagent→bindingthesteelbarofslab→Embeddingthetubesandparts→CheckingandAdjusting.
Woodformisusedforthebottomformandthesideformofbeamandalsousedfortheformoftheslab.Thewoodformis18mmthick.Timberisusedforthemainribwiththespacingof900mm~1200mmandusedforthesecondaryribwiththespacingof300mm.Forthesideformofthebeam,timberisusedforthehorizontal,verticalribanddiagonalbrace.Seesupportsystemdrawing.
SupportSystemofBeamandSlab
Inthisproject,bowel-couplerscaffoldisemployedfortheshoringsystemofbeamandslab.Forapplyinginthedifferentheightofcolumnandslab,theadjustablesupportissetonthebottomofscaffoldand“U”shapedsupportingheadissetonthetopofthescaffold.Forthedetails,pleaseseebelow:
Thespacingofverticalsupportbarunderthebeamis900x900mm.Undertheslab,itsspacingis1200x1200mm.
Exceptforthequantityofturnoverutilityofscaffold,half-storyquantityofscaffoldisusedforcuringsupport.Thescaffoldforcuringsupportmightberemovedaftertheconcretestrengthreachesthefullstrength,whileotherscaffoldcouldberemovedafterreachingthehalfofthestrengthfortheslaband75%forthebeam.
Timber100x100isusedforthelongitudinalandtransverseribsofthebeam.Timber100x100isusedforthelongitudinalriboftheslabandtimber50x100isusedforthetransverseriboftheslabwiththespacingof300mm.
Removalofformwork
Thegeneralprincipleofremovalis:
Firstlystrippingtheformworkbeerectedlaterandsoonstripingtheformworkbeerectedfirstly.
Whenstrippingthehorizontalformwork,curingsupportisessentialformeetingtherequirementwithoutrandomremoval.
Afterstrikingtheformwork,somestainsorresiduashouldberemovedimmediatelyandbrushedthereleaseagent.
Theformsandshoringmaterialsshouldbestackedaccordingtotheproposedlocationandsequence.
Strippingtheformstrictlyaccordingtotherequirementsoftherules,noallowanceforstrippingtheforminadvanceforshorteningtheworktimeandeconomizingthematerialsisavailable.
Qualitycontrolofformwork
Allitemsbuiltinshallbeinstalledinsuchamannerthattheycannotbedisturbedduringconstruction.
Generally,pipes,conduitsorfixingshallnotbeincontactwiththereinforcement.
Whereholdingdownboltsorsimilarassembliesaretobecastintoconcrete,theyshallbeaccuratelyfixedinpositionpriortothestartofworkandtheyshallbemaintainedinpositionduringconcretingoperations.
Beforeanyconcreteisplacedallformworkmustbeapprovedforposition.
Formworkshallbethoroughlycleanedaftereachuseandmaydamagedordistortedformworkshallnotbere-used.
Allformworkshallberemovedwithoutshockorvibrationthatmightdamagetheconcrete.
1.3Reinforcementwork
Materials
Materialsofsteelreinforcingbarsshallmeetthespecification’srequirements.
Mildsteelbarsshallbeofplainroundbarswithminimumyieldstressof250N/mm2.
Highyieldsteelbarsshallhaveaminimumyieldstressof460N/mm2(hotrolled)complyingwithBS4449.
WeldedwirefabricshallconformtoBS4483.
Couplersofreinforcement
Thinkingofthisprojectreality,thebarsofcolumnsshalluseelectroslagweldingcouplers,cold-squeezedcouplersforbeamsandoverlapcouplersforslabs.
Connectionofbarsandsteelplatesshallbearcwelding.
Qualitycontrolofrebarworks
Allsteelreinforcementusedintheworksshallbeobtainedfromfirmsholdingavalidcertificateofapprovalconformingtothespecification.
Takethesamplefromtherebarasrequiredandthensendtolaboratoriesforchemicalcompositionanalysisandphysicalperformancetest.Theycanbeusedonlywhenthetestsarepassed.
Rebarshallbeshapedandfabricatedinworkshopandtransportedtositeforfixing,theformworkcan’tstartuntiltherebarworksapprovedbyEngineer.
Cleanofreinforcementlooserustandscale,earth,andothermaterials,whichreduceordestroybondwithconcrete.
StorageofRebar:
differentsizeofRebarshallbefabricatedrebarandstockpiledseparatelywithclearlymarkings.Allrebarshallbestockpiledonthewoodorconcretesupportandbecovered.Theclearancewillatleastbe300mmabovethegroundsurfaceandsupportswillbeenoughtopreventdeformation
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 英文原版 施工 方法 BS 标准
![提示](https://static.bdocx.com/images/bang_tan.gif)