恒大室内装饰施工工艺和质量标准116P.docx
《恒大室内装饰施工工艺和质量标准116P.docx》由会员分享,可在线阅读,更多相关《恒大室内装饰施工工艺和质量标准116P.docx(127页珍藏版)》请在冰豆网上搜索。
恒大室内装饰施工工艺和质量标准116P
目录
第一章住宅室内装修工序间歇及工艺间歇标准······························3
1.1墙面各工序间歇及工艺间歇要求标准···········································3
1.2地面各工序间歇及工艺间歇要求标准············································3
1.3木地板施工基层要求标准································································4
1.4细部处理各工艺间歇要求标准························································4
1.5其它装修施工要求············································································4
第二章住宅室内装修工艺流程标准·····················································5
第三章住宅室内装修施工工艺和质量标准········································6
3.1场地移交····························································································6
3.2弹线···································································································10
3.3电线穿管···························································································14
3.4卧室地面找平···················································································15
3.5墙面砖铺装·······················································································17
3.6墙面石材铺装···················································································23
3.7天花吊顶、石膏线安装·····································································28
3.8入户门安装·······················································································31
3.9地面砖、石材铺贴·············································································34
3.10窗台石铺贴·····················································································40
3.11天花墙面扇灰、涂饰乳胶漆···························································42
3.12墙面造型制作、安装·······································································47
3.13橱柜、卫浴安装················································································51
3.14户内门安装······················································································57
3.15木地板安装······················································································63
3.16墙面玻璃镜面安装·········································································70
3.17墙面木饰面造型油漆·····································································70
3.18墙纸贴铺·························································································73
3.19阳台护栏安装·················································································77
3.20低窗护栏安装·················································································78
3.21墙面软包制作安装·········································································80
3.22灯具、插座开关面板安装·······························································82
3.23卫生洁具安装·················································································97
3.24卫浴五金安装···············································································104
3.25淋浴隔断安装···············································································105
3.26细部处理·······················································································106
3.27石材镜面处理···············································································114
3.28卫生清理·······················································································116
恒大地产集团
住宅室内装修施工工艺和质量标准(试行)
施工工序原则:
先上后下、先湿后干、先内后外、先粗后细、先制作后安装。
第一章住宅室内装修工序间歇及工艺间歇标准
1.1墙面各工序间歇及工艺间歇要求标准
涂料\墙纸
刮腻子子
墙面抹灰
主体结构构构
砌体
≥28天≥28天≥15-20天≥7天
工艺要求工艺要求工艺要求
1、南方春、夏
季基层含水率不大于12﹪,北方地区及南方秋、冬季基层含水率均不大于8﹪。
2、每两遍涂
料(墙纸基层底油)间歇时间为不小于48小时。
1、根据墙
面基层平整度,可进行2~3遍刮装饰腻子。
2、每两遍
装饰腻子施工干燥间歇时间为不小于48小时。
小高层结构至8层,中高层、高层结构施工至12层时,砌体可开始施工。
1、一次砌
筑高度不大于1.8米,间歇1天后再砌筑施工。
2、顶砖(或
顶膨胀混凝土浇筑)施工,须砌体完成7天后进行。
1、南方地区:
秋、冬季墙面含水率不大于12﹪,春、夏季墙面含水率不大于14﹪时可刮装饰腻子。
2、北方地区:
统一控制墙面含水率不大于12﹪时即可刮装饰腻子。
1.2地面各工序间歇及工艺间歇要求标准
1、卧室木地板、地毯等基层地面找平完成后,可上人作业间歇时间为不小于48小时。
2、客厅、餐厅、厨房、卫生间、阳台、电梯前室、首层大堂等地面砖、石材铺贴完成后,可上人作业间歇时间为不小于48小时。
3、室内地面砖、石材及地面找平完成后,墙面1米线以下墙体刮装饰腻子需要间歇不小于15-20天,其要求含水率不大于14﹪。
1.3木地板施工基层要求标准
木地板地面基层含水率标准一览表
地区
季节
南
北
春、夏
≤12﹪
≤8﹪
秋、冬
≤8﹪
≤8﹪
1.4细部处理各工艺间歇要求标准
1、厨房、卫生间、阳台、电梯前室、首层大堂等墙面砖采用湿贴工艺,砖缝水泥清理所需间歇时间为3-6小时。
2、墙面、地面、台面等湿贴作业完成后,需钻孔、打眼等间歇时间不小于14天。
3、各交界面细部处理打胶后,与卫生清理间歇时间不小于24小时。
4、入户门门框安装后,门扇安装所需间歇时间不小于72小时;户内门门框安装后,门扇安装所需间歇时间不小于24小时。
1.5其它装修施工要求
1、小高层结构至8层,中高层、高层结构施工至12层,砌体开始施工时,装修施工单位定标、不少于2名装修管理人员到位。
3、外立面装饰完成10层,外脚手架拆除上面5层,且卫生清理完毕,进行场地移交,装修施工人员全部到位。
4、小高层分2批移交,每批5层,移交间歇时间15天;中高层、高层分3批移交,第1批5层,第2、3批移交10层左右,流水施工作业。
第二章住宅室内装修工艺流程标准
电线穿管配线
入户门套、门扇、门锁及户内门框安装
墙面造型制作
天花吊顶、石膏线安装
卧室地面找平
弹线
场地移交
入户门框安装
厨卫墙砖、石材铺贴
地面砖、石材铺贴
橱柜、卫浴安装
天花、墙面扇灰涂饰底漆
窗台石铺贴
木地板基层安装
墙面造型饰面安装
天花、墙面打磨涂饰面漆
户内门套线安装
低窗护栏安装
墙纸铺贴
灯具、开关面板、水龙头安装
户内门扇安装
细部处理
卫生清理
交楼、安装室内五金配件
卫生清理至五星级标准
木地板、地脚线安装
第三章住宅室内装修施工工艺和质量标准
3.1场地移交
3.1.1室内场地移交
1、室内结构楼板、墙面无穿透性裂缝和渗漏水缺陷。
2、室内天花结构板无下挠,平整度误差不大于8mm,梁底两端高差不超过8mm,模板接缝处应磨平。
3、墙体砌筑、批荡(卫生间、厨房墙面为1:
2水泥砂浆,其余墙面为混合砂浆)完成,基层无空鼓、开裂、起灰等质量缺陷,房间墙面阳角部位需做不低于2米高1:
2水泥砂浆护角,垂直度、平整度误差不大于3mm。
4、铝合金门、窗框安装到位,窗台两端尺寸误差不大于10mm,阴阳角方正偏差不大于4mm,窗框塞缝完毕且淋水试验合格,无窗框渗漏水。
5、厨房、卫生间、阳台等给排水管线预埋及给水管试压合格。
6、厨房烟道安装并挂网批荡,挂网与墙体搭接150mm,防水封堵和止回阀安装完毕且验收合格,烟道排烟口顶至楼板底高度为150mm。
7、强弱电预埋管线、底盒位置与设计图纸一致,管线畅通。
8、隐蔽水电管道位置应标识清楚。
9、高位空调(卧室、书房)套管穿大于或等于700mm高的窗顶梁时,套管孔顶距梁底不大于220mm;穿剪力墙或砌体时套管孔顶距板底不小于400mm,且不大于600mm。
10、地面标高误差控制在±10mm内,平整度偏差不大于8mm,阳
台排水立管封堵和蓄水试验完成,无渗漏水。
11、阳台防水施工完毕且验收合格。
12、户内门洞尺寸满足设计要求,门套两侧及顶部墙体砌筑材料严禁为空心砌块,且厚度误差不大于10mm。
无地暖地区户内门洞移交尺寸一览表(单位:
㎜,以结构1米线下935㎜为基准)
型号
建筑门洞尺寸(以地面完成面计算)
建筑门洞结构1米线上高度
建筑门洞宽度范围
门头梁底距结构1米线最小高度
墙体厚度
最大误差
单扇平开房门
850×2200
950×2250
1315±5
950±5
1350±5
10
单扇平开房门900×2400
1000×2450
1515±5
1000±5
1550±5
10
厨房单扇平开门750×2200
850×2250
1315±5
850±5
1350±5
10
厨房单扇平开门800×2400
900×2450
1515±5
900±5
1550±5
10
卫生间、工人房储物间平开门700×2200
800×2250
1315±5
800±5
1350±5
10
卫生间、工人房储物间平开门750×2400
850×2450
1515±5
850±5
1550±5
10
子母门1250×2200
1350×2250
1315±5
1450±5
1350±5
10
子母门1250×2400
1350×2450
1515±5
1450±5
1550±5
10
双开门1500×2400
1600×2450
1515±5
1600±5
1550±5
10
双扇厨房推拉门(书房、衣帽间)1500×2200
1600×2250
1315±5
1600±5
1350±5
10
双扇厨房推拉门(书房、衣帽间)1700×2200
1800×2250
1315±5
1800±5
1350±5
10
双扇厨房推拉门(书房、衣帽间)1500×2400
1600×2450
1515±5
1600±5
1550±5
10
双扇厨房推拉门(书房、衣帽间)1700×2400
1800×2450
1515±5
1800±5
1550±5
10
双扇厨房推拉门(书房、衣帽间)2900×2400
3000×2450
1515±5
3000±5
1550±5
10
有地暖地区户内门洞移交尺寸一览表(单位:
㎜,以结构1米线下880㎜为基准)
型号
建筑门洞尺寸(以地面完成面计算)
建筑门洞结构1米线上高度
建筑门洞宽度范围
门头梁底距结构1米线最小高度
墙体厚度
最大误差
单扇平开房门
850×2200
950×2250
1370±5
950±5
1405±5
10
单扇平开房门900×2400
1000×2450
1570±5
1000±5
1605±5
10
厨房单扇平开门750×2200
850×2250
1370±5
850±5
1405±5
10
厨房单扇平开门800×2400
900×2450
1570±5
900±5
1605±5
10
卫生间、工人房储物间平开门700×2200
800×2250
1370±5
800±5
1405±5
10
卫生间、工人房储物间平开门750×2400
850×2450
1570±5
850±5
1605±5
10
子母门1250×2200
1350×2250
1370±5
1450±5
1405±5
10
子母门1250×2400
1350×2450
1570±5
1450±5
1605±5
10
双开门1500×2400
1600×2450
1570±5
1600±5
1605±5
10
双扇厨房推拉门(书房、衣帽间)1500×2200
1600×2250
1370±5
1600±5
1405±5
10
双扇厨房推拉门(书房、衣帽间)1700×2200
1800×2250
1370±5
1800±5
1405±5
10
双扇厨房推拉门(书房、衣帽间)1500×2400
1600×2450
1570±5
1600±5
1605±5
10
双扇厨房推拉门(书房、衣帽间)1700×2400
1800×2450
1570±5
1800±5
1605±5
10
双扇厨房推拉门(书房、衣帽间)2900×2400
3000×2450
1570±5
3000±5
1605±5
10
13、北方地区地暖管施工、保护完毕。
14、卫生间沉箱回填施工完毕,给排水管口预埋定位准确。
15、飘窗铝合金边框与墙体收口需凹入墙体10-20mm。
16、室内各房间开间、进深尺寸偏差不大于10mm,对角线尺寸偏差不大于15mm,地面清理干净。
17、墙面必须弹出结构1米线基准点且定位准确。
18、外墙施工完成且脚手架拆除完毕。
19、每栋楼至少每五层需各有一处满足装饰施工使用的水源、电源接入口。
3.1.2电梯前室
1、结构楼板无穿透性裂缝和渗漏水缺陷。
2、天花结构楼板平整度误差不大于8mm。
3、墙体砌筑、批荡(1:
2水泥砂浆)完成,基层无空鼓、起灰等质量缺陷,垂直度、平整度误差不大于3mm。
4、入户门框、管井门框、防火门框、铝合金窗框、风口百页框、电梯门框、消防箱等安装到位,管井门框、消防箱高出墙面基层(含保温层)23mm(以墙砖结合层为10mm厚计算)。
5、电梯召唤箱底盒预留洞口定位准确。
6、地面标高误差控制在±10mm内,平整度偏差不大于8mm,地面水管预埋完成,试压后无渗漏,管井土建封堵完成,无渗漏水。
7、电梯前室方正,开间、进深尺寸偏差不大于10mm,对角线尺寸偏差不大于15mm。
8、墙面必须弹出结构1米线基准点且定位准确。
9、地面清理干净。
3.1.3首层大堂
1、天花板预留洞口封堵完毕且无渗漏水,消防管、强弱电、热力管主管等安装完成。
2、墙体砌筑、水泥砂浆(1:
2)批荡完成,无空鼓、起灰等质量缺陷,垂直度、平整度不大于3mm。
3、首层入户门框、管井门框、防火门框、电梯门框等安装到位。
4、地面标高误差控制在±10mm内,平整度偏差不大于8mm,地面水、电、暖管预埋完成,试压后无渗漏。
5、首层大厅开间、进深尺寸偏差不大于10mm,对角线偏差不大于15mm。
6、墙面必须弹出结构1米线基准点且定位准确。
7、地面清理干净。
8、入户大堂上层露台防水处理,蓄水无渗漏。
3.2弹线
3.2.1地面标高定位线
1、弹出结构1米线。
2、确定地面完成面标高定位线,无地暖地区通常以结构1米线下935mm为±0.000;北方地暖地区通常以结构1米线下880mm为±0.000。
3、根据设计图纸标注相对标高,定各空间地面相对标高。
各空间相对标高一览表(单位:
m)
客厅
餐厅
过道
卧室
卫生间
厨房
客厅阳台、
厨房生活阳台
首层大堂、电梯前室
首层大堂门廊
走火梯平台
衣帽间
±0.000
±0.000
±0.000
-0.005
-0.020
-0.020
-0.060
-0.010
-0.025
-0.010
-0.005
客厅、餐厅、过道、卧室、厨房、卫生间完成面相对标高
客厅、餐厅、过道与客厅阳台、厨房生活阳台完成面相对标高
室内完成面与电梯前室、走火梯平台完成面相对标高
各空间门槛石相对标高一览表(单位:
m)
入户门
餐厅、卧室、
卫生间、厨房
阳台铝合金上口
电梯门门槛石
走火梯
内开
外开
+0.010
±0.000
±0.000
±0.000
高:
-0.005
低:
-0.010
-0.010
3.2.2地面造型定位线
1、根据设计图纸,弹出首层大堂、电梯前室、室内走廊、门厅、餐厅、卫生间等地面造型定位线、定型线。
2、根据设计图纸,弹出首层大堂、电梯前室、客厅、餐厅、走廊、阳台、卫生间等地面铺贴基准线,原则上整砖铺设,波打线收边,并按图纸要求进行坡度标识。
3、根据设计图纸和装修完成面,对卫生间、阳台排水地漏及卫生间排污管的位置进行定位复核。
淋浴间排水管中心点距墙体完成面60mm,座厕排污管中心距墙体完成面305mm。
4、按照给水管安装要求,复核水管接头位置和伸出墙体长度,伸出墙体基层(含保温层)20mm,冷热水管接头间距为150±5。
5、根据设计图纸,复核开关插座底盒位置间距和进入墙体距离。
底盒预留间距为12±2mm,进入墙体5mm,严禁高出墙面。
3.2.3墙面定位线
1、根据设计图纸和空间实际尺寸弹出客厅、卧室、卫生间、电梯前室、首层大堂等墙面造型的位置及尺寸。
2、根据卫生间、厨房、电梯前室、首层大堂等墙体垂直度及空间方正度,弹出墙面砖铺贴完成面基准线。
3、客厅造型需结合墙面的强弱电、空调开关等位置。
3.2.4天花造型及石膏线定位线
1、根据天花设计造型,在天花板上弹出天花造型定位线、石膏线定位线以及风口、检修口、灯具的位置定位线。
2、依据天花造型和风口、检修口、灯具等位置,弹吊顶天花主骨定位线,主骨要避开风口、检修口和灯具安装开孔位置,且主骨间距应不大于1200mm。
3、依据设计图纸,确定天花内空调设备的安装位置、高度及造型天花内消防管、排水管、空调冷凝水管的位置、高度、坡度。
空调冷凝水管和排水管放坡的最低点要满足天花吊顶标高和造型要求。
3.3电线穿管
1、所有线管及其配件品牌、规格、材质满足设计及规范要求,天花吊顶内严禁使用PVC线管代替镀锌钢管。
2、金属线管转接必须使用4mm2多芯铜线跨接,且可靠接地。
3、天花吊顶内灯头线需用金属软管保护,且长度不能超过1.2m。
4、不同回路不应穿于同一线管内,且不得在线管内有电线接头。
5、明装金属线管每1m间距需设一个固定码,吊顶内严禁与天花吊顶拉杆固定。
6、管内电线的总截面面积(包括外护层)不应大于导管内截面面积的40%,且电线总数不宜多于8根。
绝缘导线允许穿管根数及相应最小管径表
导线截面(mm2)
2根导线
3根导线
4根导线
5根导线
6根导线
TC
SC
PC
TC
SC
PC
TC
SC
PC
TC
SC
PC
TC
SC
PC
2.5
16
15
20
16
15
20
25
20
25
25
20
25
25
25
25
4
20
15
20
25
20
25
25
20
25
32
25
32
32
25
32
6
25
20
20
25
20
25
25
25
25
32
25
32
32
25
32
10
25
25
25
32
25
32
40
32