CommissioningProcedureforForcedDraftFanSystem
Page:
1of19
E07007
DocumentClass
1
CHENGDAENGINEERINGCORPORATIONOFCHINA
CHENGDAJOBNO.E07007
A
Forapproval
Oct.20,2008
Rev.
Description
Date
Prepared
Checked
Reviewed
Approved
PT.PLN(PERSERO)
OWNER’S
DWG.NO.
PT.PLN(PERSERO)
JASASERTIFIKASI(LMK)
Client’sProjectNo.
PLTU2BANTEN-LABUAN(2x300MW)
Labuan,Banten,theRepublicofIndonesia
DWG.NO.
E07007-PR-TM-1005
ElectronicFileName:
DateofIssue:
RevisionNo.
Oct.20,2008
B
Thisdocumentisrestricted.NeitherhewholenoranypartofthisdocumentmaybedisclosedtoanythirdpartywithoutthepriorwrittenconsentofChengdaEngineeringCorporationofChina,inwhichthecopyrightofthisdocumentisvested.Allcopyrightsreserved.Neitherthewholenoranypartofthisdocumentmaybereproduced,storedinanyretrievalsystemortransmittedinanyformorbyanymeans(electronic,mechanical,reprographic,recordingorotherwise)withoutthepriorconsentofthecopyrightowner.
1.Purpose
ThepurposeofthisprocedureistoprovidethecommissioningprocedureforFDFsystem,ensurethatFDFbody,motor,ductandauxiliaryequipmentaresafety,FDFsystemoperationperformanceisnormal,controlandprotectsystemiscorrect,FDFsystemcanmeettheordinaryoperationrequirementofgeneratorunit.
2.Referencedocument
DrawingNO:
F289S-J0201B-02,F289S-K0201B-03
3.Instrument
Pocketablevibrationmeter:
vm-63a;
Infraredthermometer:
RaytekPMPlus;
Digitaltachometer:
EMT260B;
DCSandLocalmetersforotherparameters.
4.Safetyprecautions
(1)Payattentiontoalarmsignwhenaccesstosite.Keepawayfromunqualifiedwalkwayanddangeroussites.Noaccesstositewithoutlighting.
(2)CheckandensurethatC&IprotectionhaveputintoservicebeforeFDFtrialoperation.
(3)Verifytheearthingoffanmotorandsafeguardofcouplingbeforestartfan.
(4)Assignasitesupervisorandkeepawayataxialsafezonewhilerunningfans.
(5)TriptheFDFmanuallywhenitoutofcontrolorrunningobviouslyabnormal,anditcanbestartedagainafterbeingcheckclearly.
(6)WhileFDFshutdownaccidentally,beforecomingintoductandFDFbody,thepowershouldbecutofffirst,andhangingasignofNOOPERATION.
5.Mainequipmentspecification
Fantype
FAF18-9-1
Motortype
YKK450-4
OperatingPoint
T.B
BMCR
Volumeflow
m3/s
100.40
88.40
Inlettemperature
oC
30.00
30.00
Totalpressure
Pa
3297
2738
Fanshaftpower
kw
329.4
278
Fanspeed
r/min
1490
Motorspeed
r/min
1489
Motoroutput
kw
450
Voltage
kV
6
Current
A
50.4
6.Pre-commissioningprocedure
6.1Preconditionforpre-commissioning
Thereisturnoverpackagefromconstructionteamtocommissioningteamsaidthatsystemreadytotest.
(1)Installationoffan&itsauxiliaryequipmentcompletedandaccepted.
(2)Electricalinstallationfinishedandprotectionfunctionisnormal.Individualrunningoffanmotorfinishedwithcorrectrotarydirectionandstartupcurrentrecord.
(3)Thereisenoughlightingatsite.
(4)Removingofdebrisandscaffoldaroundfan.Thereisgoodcoveringoftrenchandnoflammables&explosiveslocally.
6.2Damperscheck
(1)FullopenandfullcloseMV(motor-drivevalve)check
(2)Theblade(controlvalve)check
Refertoappendix1.
6.3Functioncheck
Functioncheckincludesthefollowingitems.
(1)FDFAoilstation#1oilpumplogicalfunctioncheck
(2)FDFBoilstation#1oilpumplogicalfunctioncheck
(3)FDFA&Boilstationheaterlogicalfunctioncheck
(4)FDFA&Boutletdamperslogicalfunctioncheck
(5)FDFA&Boutletinterconnectingdamperslogicalfunctioncheck
(6)FDFA&Bsequencestartlogicalfunctioncheck
(7)FDFA&Bsequencestoplogicalfunctioncheck
(8)FDFA&Blogicalfunctioncheck
6.4FDFprotectionfunctioncheck
(1)FDFtemperatureprotectionfunctioncheck
(2)FDFvibrationprotectionfunctioncheck
Refertoappendix2.
7.Trialoperation
Inprinciple,theIDFandFDFshouldrunningatthesametime.
7.1Necessarypreconditioncheck
Refertoappendix3.
7.2Trialoperationprocess
7.2.1Oilstationcheckandstart
(1)Oilstation’soillevelshouldbenormal
(2)Startoneoilpump,checkoilstation’soiltemperature,oilpressureshouldbenormal
(3)Theoutletandinletvalvesofoilcoolershouldbeopened,thebypassvalveshouldbeclosed,ensurethattheFDFlubeoilisnormal.
(4)ThereisnoleakageinlubeoilsystemandFDFbearing.
(5)ThestandbyoilpumpshouldputintoAUTOposition.
(6)Thecoolingwatervalvesareopened,thecoolingwaterisenough,thecoolingwaterturnbacknormally.
7.2.2StartuponeIDF
StartoneIDFasitsprocedureandkeeptheblade’sopeningat0percent.Adjustbladeaccordingtherequirement,afterstart-up.
7.2.3CheckandsatisfytheFDFstartupcondition
7.2.4StartuptheFDF,triptheFDFinlocalwhentheelectricalcurrentisnormal.
7.2.5StartupFDFagain,measuresandverifiestheFDFvibrationvaluewhentheelectricalcurrentisnormal.
7.2.6AdjustthebladeopeningofIDF,opentheFDFbladeslowly,andkeepthefurnacenegativepressureatconstant.
7.2.7StartupanotherIDFandkeepthebladeopeningat0percent,startupanotherFDFandopenthebladeslowly,keepthefurnacepressureconstantly.
7.2.8AdjusttheFDFbladeopening;keeptheFDFrunningatthedifferentopeningof30%,50%,75%and100%.
7.2.9FDFtrialoperationabout8hours.
7.2.10Writedowntheparameteraccordingappendix4.
AppendixIChecklistofFDFsystemdampers1(MV)
PLTU2BANTEN-LABUAN(2×300MW)
Unit:
Systemname:
FDFsystem Date:
NO.
Description
Result
SUBCON
CHENGDA
OWNER
open
close
open/closetime
1
送风机A出口挡板
FDFAoutletdamper
10HLA10AA001
2
空预器A出口二次风挡板1
AHAoutletSAdamper1
10HLA10AA002a
3
空预器A出口二次风挡板2
AHAoutletSAdamper2
10HLA10AA002b
4
送风机B出口挡板
FDFBoutletdamper
10HLA20AA001
5
空预器B出口二次风挡板1
AHBoutletSAdamper1
10HLA20AA002a
6
空预器B出口二次风挡板2
AHBoutletSAdamper210HLA20AA002b
7
送风机出口联络门
FDFoutletconnectingdamper
10HLA30AA001
Remark:
AppendixIChecklistofFDFsystemdampers2(CV)
PLTU2BANTEN-LABUAN(2×300MW)
Unit:
Systemname:
FDFsystem Date:
NO.
Description
Result
SUBCON
CHENGDA
OWNER
0%
50%
100%
open/closetime
1
送风机A动叶
BladeofFDFA
10HLB10AA101
2
送风机B动叶
BladeofFDFB
10HLB20AA101
3
AA1调节风门
AA1regulatingdamper
4
AA2调节风门
AA2regulatingdamper
5
AA3调节风门
AA3regulatingdamper
6
AA4调节风门
AA4regulatingdamper
7
A1调节风门
A1regulatingdamper
8
A2调节风门
A2regulatingdamper
9
A3调节风门
A3regulatingdamper
10
A4调节风门
A4regulatingdamper
11
AB1调节风门
AB1regulatingdamper
12
AB2调节风门
AB2regulatingdamper
Remark:
AppendixIChecklistofFDFsystemdampers2(CV)
PLTU2BANTEN-LABUAN(2×300MW)
Unit:
Systemname:
FDFsystem Date:
NO.
Description
Result
SUBCON
CHENGDA
OWNER
0%
50%
100%
open/closetime
13
AB3调节风门
AB3regulatingdamper
14
AB4调节风门
AB4regulatingdamper
15
B1调节风门
B1regulatingdamper
16
B2调节风门
B2regulatingdamper
17
B3调节风门
B3regulatingdamper
18
B4调节风门
B4regulatingdamper
19
BC1调节风门
BC1regulatingdamper
20
BC2调节风门
BC2regulatingdamper
21
BC3调节风门
BC3regulatingdamper
22
BC4调节风门
BC4regulatingdamper
23
C1调节风门
C1regulatingdamper
24
C2调节风门
C2regulatingdamper
Remark:
AppendixIChecklistofFDFsystemdampers2(CV)
PLTU2BANTEN-LABUAN(2×300MW)
Unit:
Systemname:
FDFsystem Date:
NO.
Description
Result
SUBCON
CHENGDA
OWNER
0%
50%
100%
open/closetime
25
C3调节风门
C3regulatingdamper
26
C4调节风门
C4regulatingdamper
27
CC1调节风门
CC1regulatingdamper
28
CC2调节风门
CC2regulatingdamper
29
CC3调节风门
CC3regulatingdamper
30
CC4调节风门
CC4regulatingdamper
31
DD1调节风门
DD1regulatingdamper
32
DD2调节风门
DD2regulatingdamper
33
DD3调节风门
DD3regulatingdamper
34
DD4调节风门
DD4regulatingdamper
35
D1调节风门
D1regulatingdamper
36
D2调节风门
D2regulatingdamper
Remark:
AppendixIChecklistofFDFsystemdampers2(CV)
PLTU2BANTEN-LABUAN(2×300MW)
Unit:
Systemname:
FDFsystem Date:
NO.
Description
Result
SUBCON
CHENGDA
OWNER
0%
50%
100%
open/closetime
37
D3调节风门
D3regulatingdamper
38
D4调节风门
D4regulatingdamper
39
DE1调节风门
DE1regulatingdamper
40
DE2调节风门
DE2regulatingdamper
41
DE3调节风门
DE3regulatingdamper
42
DE4调节风门
DE4regulatingdamper
43
E1调节风门
E1regulatingdamper
44
E2调节风门
E2regulatingdamper
45
E3调节风门
E3regulatingdamper
46
E4调节风门
E4regulatingdamper
47
EF1调节风门
EF1regulatingdamper
48
EF2调节风门
EF2regulatingdamper
Remark:
AppendixIChecklistofFDFsystemdampers2(CV)
PLTU2BANTEN-LABUAN(2×300MW)
Unit:
Syste
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 1005 印尼 LABUAN 送风机 调试 程序 EN090321